Total Quality
Management
Anubha Maurya
Total Quality Management
A Brief History of Quality
Management
Historical uses of quality management
include the precision involved in building
of Egyptian pyramids, interchangeable
parts during Industrial Revolution, and
statistical tools used for quality control
during World War II.
Dr. Joseph Juran and Dr. W. Edwards
Deming were pioneers in the field (more
later on these two quality gurus).
The Japanese integrated quality ideas and
methods throughout their organizations
and developed a culture of continuous
improvement.
CURRENT DEMANDS FROM ORGANISATIONS
• To understand what customer wants
And to provide it , immediately on demand ,
At lowest cost
• To provide products & services of high quality and
reliability consistently
• To keep up with pace of change , technological as well
as political and social
• To be one step ahead of the customer’s needs ; that is ,
to predict what the customer will want one year or
ten years from now
Customer means internal customer as well
What is Quality?
Continuous Satisfaction of
Customer Requirements
A ‘Customer-Centric’ View
Quality
Quantified as
Q Quantity
P Performance
E Expectation
Q=P/E i.e Q has to be > 1
What is
Quality
Management?
Achievement of Quality
at Low Cost.
QUALITY MANAGEMENT TRIANGLE
COMMITMENT
TO NEVER-ENDING QUALITY IMPROVEMENT
INVOLVEMENT SCIENTIFIC
KNOWLEDGE
What is
Total Quality
Management?
Attainment of
Total Quality
Through Everyone’s
Commitment on a Daily Basis
SO …..
Quality is a state in which value
entitlement is realized for the customer
and provider in every aspect of the
business relationship.
Business quality is highest when the
costs are at the absolute lowest for both
the producer & consumer and is most
readily attained when the entirety of
Understanding Quality
Quality can be a confusing concept,
partly because people view quality in
relation to differing criteria based on their
individual roles in the value chain, such
as:
perfection,
delighting or pleasing the customer,
eliminating waste,
doing it right the first time, and/or
consistency.
Understanding Quality
• Fitness for use is the ability of a
good or service to meet customer
needs.
• Quality of conformance is the
extent to which a process is able to
deliver output that confirms to
design specifications.
• Specifications are targets and
tolerances determined by designers
of goods and services.
Understanding Quality
• Quality Control means ensuring
consistency in processes to achieve
conformance.
• Service Quality is consistently
meeting or exceeding customer
expectations (external focus) and
service delivery system performance
criteria (internal focus) during all
service encounters.
Traditionally Quality has 3 main dimensions
• Performance
• Price
• Promptness
In present context , following more dimensions
should be added to Concern for Quality –
• Global competitiveness
• Concern for environment
• Concern for safety ( for Transport Orgn. )
QUALITY GURUS ….
JURAN – QUALITY TRILOGY
•QUALITY PLANNING , QUALITY IMPROVEMENT
PROJECTS , QUALITY CONTROL
CROSBY – QUALITY IS FREE
•ZERO DEFECTS , DO IT RIGHT FIRST TIME , ASSIGN
MONEY VALUE TO NON – CONFORMANCE TO
QUALITY
TAGUCHI - LOSS FUNCTION
LOSS TO SOCIETY IS PROPORTIONAL TO SQAURE OF
DEVIATION FROM THE TARGET
Why TQM?
Ford Motor Company had operating losses
of $3.3 billion between 1980 and 1982.
Xerox market share dropped from 93% in
1971 to 40% in 1981.
Attention to quality was seen as a way to
combat the competition.
Total Quality Management
TQM
Total - made up of the whole
Quality - degree of excellence a product or service
provides
Management - act, art or manner of planning,
controlling, directing,….
Therefore, TQM is the art of managing the whole
to achieve excellence.
excellence
Total Quality Management
What does TQM
mean?
Total Quality Management means that
the organization's culture is defined by
and supports the constant attainment of
customer satisfaction through an
integrated system of tools, techniques,
and training. This involves the
continuous improvement of
organizational processes, resulting in
high quality products and services.
Total Quality Management
Six Basic Concept
1- Committed and Involved management
2-Focus on Customer
3-Involvement
4-Continous Improvement
5-Suppliers as partner
6-Est performance measure for process
Total Quality Management
What’s the goal of
TQM?
“Do the right things right the
first time, every time.”
Total Quality Management
Another way to put
it
At it’s simplest, TQM is all managers
leading and facilitating all contributors in
everyone’s two main objectives:
✔ (1) total client satisfaction through
quality products and services; and
✔ (2) continuous improvements to
processes, systems, people, suppliers,
partners, products, and services.
Total Quality Management
Intangible Benefits of Implementing
TQM
• Image of the organization has improved.
• Reduction in inventory.
• Shorter lead time in design, manufacturing, procurement
service etc.,
• Reduction in rejections and complaints.
• Customer satisfaction.
• Quality cost % to turnover reduction.
• Reduction in deviation.
• Continuous improvement.
• Drastic reduction in defectives and number of defects.
Scope of TQM
• Commitment by senior management and all employees
• Meeting customer requirements
• Reducing development cycle times
• Just In Time/ Flow Manufacturing
• Improvement teams
• Reducing product and service costs
• Systems to facilitate improvement
• Employee involvement and empowerment
• Recognition and celebration
• Challenging quantified goals and benchmarking
• Focus on processes / improvement plans
Productivity and
TQM
Traditional view:
• Quality cannot be improved without
significant losses in productivity.
TQM view:
• Improved quality leads to improved
productivity.
Total Quality Management
Old Vs New Culture
Quality Elements Previous TQM
Definition
Product Oriented
Cm Oriented
Priorities
2nd to Service & cost
First
Decision
Short term
Long term
Emphasis Prevention
Detection
Errors
System
Operation
Responsibility
Everyone
Quality Control
Problem solving
Teams
Managers Life cycle cost
Procurement Price Delegate,
Manager Role Plan Assign control coach, facilitate
enforce
Total Quality
Management
and Continuous
Improvement
TQM is the management process used to make
continuous improvements to all functions.
TQM represents an ongoing, continuous
commitment to improvement.
The foundation of total quality is a management
philosophy that supports meeting customer
requirements through continuous improvement.
Total Quality Management
Continuous
Improvement versus
Traditional Approach
Traditional Approach Continuous
Continuous Improvement
Improvement
Market-share focus
Customer focus
Individuals
Cross-functional teams
Focus on ‘who” and “why” Focus on “what” and “how”
Short-term focus
Long-term focus
Status quo focus
Continuous improvement
Product focus
Process improvement
Innovation focus
Fire fighting
Incremental improvements
Problem solving
Total Quality Management
The TQM System
Objective Continuous
Improvement
Principles Customer Process Total
Focus Improvement Involvement
Leadership
Elements Education and Training Supportive structure
Communications Reward and recognition
Measurement
Total Quality Management
OBSTACLES
• Lack of Management Commitment
• Inability to change org culture
• Improper Planning
• Lack of Continuous Training and Education
• Ineffective Measurement technique and
lack of access of data and result
• Paying inadequate attention to Internal and
External customer
• Failure to continually improve
W. Edwards Deming
• Focus on bringing about improvements in
product and service quality by reducing
uncertainty and variability in goods and
services design and associated processes
(the beginning of his ideas in 1920s and
1930s).
• Higher quality leads to higher productivity
and lower costs.
• “14 Points” management philosophy.
• Deming Cycle – Plan, Do, Study, and Act.
W. Edwards Deming 14 Points
Point 1: Create a Vision and Demonstrate
Commitment
Point 2: Learn the Philosophy
Point 3: Understand Inspection
Point 4: Stop Making Decisions Purely on
the Basis of Cost
Point 5: Improve Constantly and Forever
Point 6: Institute Training
Point 7: Institute Leadership
Chapter 15 Influential Leaders in Quality
Management
W. Edwards Deming 14 Points
Point 8: Drive Out Fear
Point 9: Optimize the Efforts of Teams
Point 10: Eliminate Exhortations
Point 11: Eliminate Numerical Quotas
Point 12: Remove Barriers to Pride in Work
Point 13: Encourage Education and Self-
Improvement
Point 14: Take Action
COST OF QUALITY
Failure costs -costs caused by defective
parts, products, or faulty services .
Internal -failures discovered during
production (e.g. rework, problems,
material/product losses, downtime) .
External -failures discovered after
delivery (e.g. warranty, returned goods,
liability claims, penalties)
COST OF QUALITY
Appraisal costs -costs of activities designed
to ensure quality or uncover defects (e.g. in-
line inspection, final inspection, field testing,
crash test dummies, crumpled cars)
Prevention costs -costs of preventing defects
from occurring (e.g. training, working with
vendors, quality control procedures, quality
improvement programs, extra attention in
design and production)
Total Quality
Management
Anubha Maurya
Total Quality Management
A
i
m
:
I
n
c
r
e
a
s
e
x
t
e
r
n
a
l
n
d
i
n
t
e
r
n
a
l
c
u
s
t
o
m
e
r
s
a
t
i
s
f
a
c
t
i
o
n
w
i
t
h
a
r
e
d
u
c
e
d
a
m
o
u
nt
o
f
r
e
s
o
u
r
c
e
s
V
a
l
u
e
s T
o
l
sC
o
n
t
r
o
l
T
o
pM
a
n
g
e
m
n
t R
e
l
a
t
i
o
n lC
F
a
c
t
o
r
i
a h
a
r
t
s
C
o
m
i
t
m
e
n
t F
o
c
u
so
n D
i
a
g
r
m D
e
s
i
g
n
P
r
o
c
e
s C
r
i
t
e
a
o
f
I
m
p
r
o
v
e F
o
c
u
s
o
n M
a
t
r
i
c
e
s M
B
N
Q
A
C
o
n
t
i
u
o
s
l
y C
u
s
t
o
m
e
r
s I
s
h
i
k
a
w T r
e
D
i
a
g
r
m P
r
o
c
e
s D
i
a
g
r
m
L
e
t
E
v
e
r
y
b
o
d
y
B
a
s
e
D
c
i
s
o
n
s M
a
p
s
b
e
C
o
m
i
t
e
d I S
O Q
u
a
l
i
t
y
o
n
F
a
c
t 9
0H
Q
u
a
l
i
t
y
F
u
n
c
t
i
o
n i o
H
y
p
o
t
h
e
s u
s
e
D
e
p
l
o
y
m
e
n
t t
e
s
i
n
g
Q
u
a
l
i
t
y E
m
p
l
o
y
e
C
i
r
c
l
e
s S
u
p
l
i
e
r
D
e
v
l
o
p
m
e
n
t
P
a
r
t
n
e
s
h
i
p
B
e
n
c
h
- P
r
o
c
e
s
m
a
r
k
i
n
g M
a
n
g
e
m
n
t P
o
l
i
c
y
D
e
p
l
o
y
m
e
n
t
S
e
l
f
-De
s
i
g
n
o
f
a
s
e
m
e
n
t Et S
x
p
e
r
i
m
e
n i
x
T
o
t
a
l
Q
u
a
l
i
t
y S
i
g
m
a
M
a
n
g
e
m
n
t M
e
t
h
o
d
l
o
g
i
e
s
Total Quality Management (TQM) can be seen as a continuously evolved management system, consisting of values, methodologies and tools. The
aim of the system is to increase external and internal customer satisfaction with a reduced amount of resources. It is important to note, that the
techniques and tools in the figure are just examples and not a complete list. In the same way the values may also vary a little between different
organisations and over time. (From Hellsten & Klefsjö, 2000.)
A STRATEGY FOR
PERFORMANCE
EXCELLENCE
Continuous Improvement
Is the continuous elimination
of waste
What Does Kaizen
Mean?
KAI + ZEN
To modify, to change Think, make good, make
better
= KAIZEN
Make it easier by studying it, and making the improvement
through elimination of waste.
Why Kaizen CPI (Continual Performance Improvement)
Process
Improvement Project
• Data Driven Methodology to Magnify Impact of
Implemented
Process Improvement
Savings
• Apply Control Techniques to Eliminate Erosion of
Improvements
Maintenance of
Process
Performance
• Proceduralize/Standardize Improvements for
Improved Maintenance of Critical Process Parameters
Time
CPI Project
Savings CPI Projects Emphasize
Control and Long Term
Maintenance
Kaizen Time Kaizen
Savings
• Use Small Teams to Optimize Process Performance
CPI
by Implementing Incremental Change
• Apply Intellectual Capital of Team Members Intimate
with Process
Kaizen Projects
Emphasize Incremental
Improvements Time
Kaizen
• Total focus on a defined process to create
radical improvement in a short period of
time
• Dramatic improvements in productivity,
quality, delivery, lead-time, set-up time,
space utilization, work in process, workplace
organization
http://www.managementguides.com. All Rights 40
Continous Process
Improvement
What is Process? – Activity of an
organisation (business / production)
All non conformance can represent
opportunity.
It is the interaction of some combination
of people, material, equipment, method,
measurment
All process should have one owner
What is improvement ? –
Reduce resources (distributed to more people)
reduce error (typing error, print??)
meet expectation, (delighting the cm)
make process safer (fewer accident)
make the process more satisfying to the person who
is using it. (satisfying worker, eg change of chair)
The Deming Cycle
• Plan: study current situation
• Do: implement plan on trial basis
• Study: determine if trial is working
correctly
• Act: standardize improvements
PDCA Cycle
P-Identify opportunity (brainstoring, pareto, alarming, complaints)
P-Analyse the process (Current status, flow chart, 5W1H)
P-Develop the optimal solution (create new process, or
combine different process, modify existing )
D-Implement (Why, how when, who where)
C-Study the result (montior and evaluate)
A-Standardize the solution (Institutionalize, ownership)
A-Plan of the future
Observe the Current
Process
• Crucial first step in process improvement
• Deep understanding of the existing
processes and dependencies
• Identify all the activities currently involved in
developing a new product
• Observe the process first hand
• Flowchart the process
• Take measurements – time, yield, travel
• distance
Identify Value Added (VA), Non-Value Added
Required (NVA-R), and Non-Value Added
• (NVA)
Generally creates more questions than
answers
http://www.managementguides.com. All Rights 46
Difference b/w Kaizen and
Innovation
Effect is long term Effect is Short
Small step pace
Big Step
Continous
Intermittent
Gradual, constant Abrupt
Everybody
Champions
Group effort Individual idea
Small investment
Large investment
Focus on
Value added and Non value added
MUDA refers to seven waste
• The waste of Overproduction ,The waste of
Processing The waste of Time , The waste
of Inventory , The waste of Motion , The
waste of Unacceptable items (defects), The
waste of Movement (transportation)
Principle of motion handling, material
handling.
Documentation of SOP
FIVES- Seiko, seition, seiketso, seiso,
shitsuke
Visual Management
JIT
Poka Yoke
Team Dynamics
FIVE s
Sorting
Systematic Arrangement
Spic and Span
Standardization
Self discipline
Introduction
• 5S is a method to improve and sustain workplace
organization
• 5S represents 5 disciplines for maintaining a visual
workplace (visual controls and information
• systems).
These are foundational to continual improvement
and a manufacturing strategy based on "Lean
Manufacturing" (waste removing) concepts.
• Reduces clutter
• Reduces the time it takes to look for tools and
• equipment
“A place for everything and everything in its place”
• Improves how the operation appears to customers –
always be “tour ready”
• Creates pride in the workplace
• Many companies have a standard that any tool
must be able to be found within 60 seconds.
Components and
Implementation
• Elements of 5S
– Sort
– Straighten
– Shine
– Standardize
– Sustain
– Safety
• Visual Factory
• Implementation plan
http://www.ManagementGuides.com. All Rights 52
Elements of 5S
• Sort
– Remove all unnecessary materials and equipment
• Straighten
– Make it obvious where things belong
• Shine
– Clean everything, inside and out
• Standardize
– Establish policies and procedures to ensure 5S
• Sustain
– Training, daily activities
• Safety (often called “6S” or “5S + 1”)
– A safety commitment in all activities
The Good, Bad and
the Ugly
• First the Bad and the Ugly - Life Without 5S
Examples – Sort and
Straighten
See the difference?
• Sort - All unneeded tools, parts and supplies are removed from the
• area
Straighten - A place for everything and everything is in its place
http://www.ManagementGuides.com. All Rights 55
5S Implementation
1. Begin reviewing your areas for 5S
2. Discuss 5S with each of your groups (brief
group meeting)
3. Red tag sorting process (one time)
4. Brief, simple daily 5S individual activity
(“just look around”)
5. Brief 5S checklist or procedure for each
6. area
Monthly 5S audit beginning __________
• Area Lead plus at least one person from outside that
area
• Post results (I will look for them!)
• Review results with your group
• Take corrective action
56
Red Tag Process
• One-time activity to remove or disposition
• clutter
To be started within two weeks of this
training
1. Identify clutter, unused equipment, etc
2. Fill out and attach red tag
3. Note in red tag log
4. Red tags must be dispositioned within 30
days
http://www.ManagementGuides.com. All Rights 57
Visual Control & the Workstation
To Sort To Straighten
Ensure space for each
Eliminate what’s thing, and a thing for
not absolutely each space. No more
necessary searching.
The To Sustain
5S Maintain
continuous effort.
This is a way of
life. To Sweep
To Sanitize Maintain a clean and
orderly space to
Improvement of make problems easily
the workstation. identifiable.
Be organized to Eliminate rejects and
reduce clutter. scrap..
Visual Control & the Workstation
Ergonomics
•Adapt the workstation to the
employee
- more security
- more comfort
•Reduce waste
- excessive fatigue
- useless efforts and movement
- less physical constraints
JIT
Based on supplier relation
It calls for raw material and component to
reach the production operation in small
quantities when they are needed and not
before
Inventory cost are kept minimum
Procurement lots are small and deliver is
frequent
JIT goals
Flexible enterprise;
Only produce products needed;
Reducing the inventory in process,
finished goods and raw materials;
Reduce costs of manufacturing;
Creating space in the factory;
Minor "lead time" in manufacturing;
Better customer service;
Less waste;
Greater return on investment.
Poka Yoke
Mistake Proofing device
Automatic continous inspection and
abnormility arises feedback is given and
action is taken
Low cost
Example
Chapter 15 Quality Management
Poka-Yoke Examples
Machines have limit switches connected
to warning lights that tell the operator
when parts are positioned improperly on
the machine.
Fast food restaurants use automated
french-frying machines that can only be
operated one way; the french fries are
prepackaged and the equipment
automated to reduce the chance of
human error.
Introduction
• Mistake proofing and poka yoke is the use of
process or design features to prevent errors
or their negative impact.
• The term Poka yoke is Japanese slang for
“avoiding inadvertent errors” which was
formalized by Shigeo Shingo.
• Inexpensive.
• Very effective.
• Based on simplicity and ingenuity.
http://www.ManagementGuides.com. All Rights 64
Background and
History
Shingo suggested a solution that became
the first poka yoke device:
– In the old method, a worker began by taking
two springs out of a large parts box and then
assembled a switch.
– In the new approach, a small dish is placed in
front of the parts box and the worker's first
task is to take two springs out of the box and
place them on the dish. Then the worker
assembles the switch. If any spring remains
on the dish, then the worker knows that he or
she has forgotten to insert it.
– The new procedure completely eliminated the
problem of the missing springs.
Everyday Examples
3.5 inch diskettes cannot be inserted
unless diskette is oriented correctly.
This is as far as a disk can be inserted
upside-down. The beveled corner of
the diskette along with the fact that
the diskette is not square, prohibit
incorrect
Fueling areaorientation.
of car has three error-proofing
devices:
1. insert keeps leaded-fuel nozzle from being
inserted
2. tether does not allow loss of gas cap
3. gas cap has ratchet to signal proper tightness
New
andlawn mowers are required to have a
safety bar on the handle that must be pulled
prevent overtightening.
back in order to start the engine. If you let
go of the safety bar, the mower blade stops
in 3 seconds or less.
http://www.ManagementGuides.com. All Rights 66
Ex: Whose signature is
required?
Before:
After:
67
Ten Types of Human
Mistakes
• Forgetfulness
• Misunderstanding
• Wrong identification
• Lack of experience
• Willful (ignoring rules or procedure)
• Inadvertent or sloppiness
• Slowliness
• Lack of standardization
• Surprise (unexpected machine operation,
• etc.)
Intentional (sabotage)
3 Rules of Poka Yoke
• Don’t wait for the perfect poka yoke. Do it
now!
• If your poka yoke idea has better than 50%
chance to succeed…Do it!
• Do it now….improve later!
69
Think Break
Exercise 1: Wastes
Identification
Identifyo
neexample P
ossib
leca
use P
ropose
d Me
thodo
f
ofea chtypeo
fwaste Ac
tio
n m
easu
rement
belo
w
O
ver
p r
odu
ctio
n
D
ela
ys
T
ran
spo
rta
tio
n
P
roc
ess
In
vento
rie
s
M
otio
ns
D
efec
tiv
epr
odu
cts
Unta
pped
r
esourc
es
M
isu
sedr
eso
urc
es
Statistical Tool
Check sheet
Affinity Diagram
Relations diagrm
Histogram
Tree Diagrm
Pareto Chart Matrix Diagrm
Cause & Effect
Matrix Data anal
Scatter Diagram Arrow Diagram
Control Chart Process decision
Graph prog chart
Control tools are born with variability
Cause of variation is cue to chance or
assignable cause
Variation due to Chance are difficult to
trace and control even under best
condition
Assignable cause can be traced and
occurs due to difference in workers,
material, machine..
Chapter 15 Seven Tools of Quality
Management
The “Seven QC Tools”
1. Flowcharts: process mapping to identify the
sequence of activities or flow of materials/
information in a process.
2. Run Charts and Control Charts: a run chart
is a line graph with data plotted over time;
control charts include control limits.
3. Checksheets: simple tools for data
collection, ensure completeness.
4. Histograms: graphically represent
frequency of values within a specified
group.
The Structure of a Control Chart
Exhibit Defective Item Checksheet
15.4
Source: K. Ishikawa, Guide
to Quality Control (Tokyo:
Asian Productivity
Organization, 1982), p. 33.
Chapter 15 Seven Tools of Quality
Management
The “Seven QC Tools”
5. Pareto Diagrams: separate the vital few
from the trivial many causes; provide
direction for selecting projects for
improvement.
6. Cause-and-Effect Diagrams: represent
chain of relationships; often called a
fishbone diagram.
7. Scatter Diagrams: graphical component
of regression analysis.
Exhibit
15.5
Use of Pareto
Diagrams for
Progressive Analysis
Source: Small Business Guidebook to Quality Management,
Office of the Secretary of Defense, Quality Management
Office, Washington, DC (1988).
Exhibit Cause-and-Effect Diagram for Hospital Emergency
15.6 Admission
TQM:Tools,QFD
Quality Function
Deployment:History
The concept of QFD was developed in the
early 1970 in Japan.
Initially, Kobe Shipyard, Mitsubishi Heavy
Industry ltd.introduced this concept.
Toyota Conceived this idea only in 1977.
Due to energy crisis and economic
problems, the QFD began to adopted in
the American auto industries in the mid
1980s.
QFD - Q
A tech or discipline for optimizing the process of developing and
producing new pdt on the basis of customer need
QFD is a five stage process
-Identifying customer needs or wants. These are usually characteristics directly
attributable to the pdt or service, such as looks, feel, how long it last,
comparison with competition
- These reqt are translated into technical specification called critical with tech
expert
- These technical specification are then turned into end product specifications.
These are called critical path characteristics
- Design the process to deliver the pdt or service i.e hw to turn into design into
reality
- The final stage is to plan the activities necessary to produce the reqd o/p
Quality Function
Deployment:
Introduction
QFD is a systematic and a planning tool
to motivate business to success by
integrating the quality related of products
and customer expectations and
requirements( Voice of Customer)
QFD deploys the voice of customer
through the product’s
design,production,marketing,delivery and
service.
QFD translates the voice of customer into
engineering or technical characteristics and
finally into design requirements (voice of
engineer)
This can be deployed through
-Product planning
-Product development
-Process Planning
-Production Planning
-Service Industries.
Benefits of QFD
QFD was originally intended to reduce start
up costs, but helped the organization to
reduce cycle time of the product.
QFD meets the customer satisfaction.
Helps management to plan its resources to
improve the quality of product.
Early identification of bottlenecks in
technology, and resolving them helps to
release the product into market first.
Helps to develop a structured format about information gathered on
customer needs, competitive product, and bottlenecks. Even a new
employee can be fit into a particular project.
Identification of conflicting design requirements results in reduction in
retooling,training,and quality control measures. It reduces cycle time f
product.
Since inputs are required from marketing,design,engineering and sales,
horizontal communication channels has to be ensured. This Promotes
teamwork resulting in improved efficiency and productivity.
Organization will have proper documentation system. This acts as a future
database for future design process identification.
Exhibit The House of Quality
6.8
Chapter 6 Goods and Service Design
Quality Function Deployment (House of
Quality)
• Quality function deployment (QFD) is both
a philosophy and a set of planning and
communication tools that focus on
customer requirements in coordinating the
design, manufacturing, and marketing of
goods or services.
• QFD fosters improved communication and
teamwork among all constituencies in the
design process.
Chapter 6 Goods and Service Design
The House of Quality
• QFD translates customer wants and needs into
technical requirements of a product or service.
• Building the House of Quality:
Determine customer requirements through
the voice of the customer (VOC).
Define technical requirements of the product.
Determine interrelationships between the
technical requirements.
The relationship matrix defines what technical
requirements satisfy VOC needs.
Customer priorities and competitive
evaluation help select which VOC
requirements the product should focus on.
Exhibit Extra
The House of
Quality for
Building a Better
Pizza
Taguchi
• Genichi Taguchi states that instead
of constantly directing effort toward
controlling a process to assure
consistent quality, design the
manufactured good to achieve high
quality despite the variations that
will occur in the production line.
Robust Design and the Taguchi Loss
Function
• Taguchi’s loss function explains the
economic value of reducing variation in
manufacturing.
L(x) = k(x – T)2 [6.1]
where:
L(x) is the monetary value of the loss
associated with deviating from the target,
T;
x is the actual value of the dimension;
Exhibit Nominal-Is-Best Taguchi Loss Function
6.3
Exhibit Traditional Goal Post View of Conforming to
6.2 Specifications
Chapter 6 Goods and Service Design
Solved Problem
Suppose that the specification on a part is 0.500 ± 0.020 cm. A
detailed analysis of product returns and repairs has discovered
that many failures occur when the actual dimension is near the
extreme of the tolerance range (that is, when the dimensions are
approximately 0.48 or 0.52) and costs $50 for repair.
Thus, in Equation 6.1, the deviation from the target, x – T , is 0.02
and L(x) = $50. Substituting these values, we have:
50 = k(0.02)2
or
k = 50/0.0004 = 125,000
Therefore, the loss function for a single part is L(x) = 125000(x –
T)2.
This means when the deviation is 0.10, the firm can still expect an
average loss per unit of:
L(0.10) = 125,000(0.10)2 = $12.50 per part
Chapter 6 Goods and Service Design
Solved problem (continued)
Knowing the Taguchi loss function helps designers to
determine appropriate tolerances economically. For
example, suppose that a simple adjustment can be
made at the factory for only $2 to get this dimension
very close to the target.
If we set L(x) = $2 and solve for x – T, we get:
2 = 125000(x – T)2
x – T = 0.004
Therefore, if the dimension is more than 0.004 away
from the target, it is more economical to adjust it at
the factory and the specifications should be set as
0.500 ± 0.004.
Exhibit Nominal-Is-Best Taguchi Loss Function
6.3
Taguchi method
Approach that focuses on a statistical method
that zeros in rapidly on the variations in a
product that distinguish the bad parts from the
good.
Study all factor that can hamper uniformity
between product and their long run stable
performance and build in safeguards at the
product design stage itself.
In other word robust design
Identify main function, side effect and
failure mode.
Identify control factors and alternatives
Define data analysis procedure
Predict performance
Conduct the verification experiment and
plan future action
TOMEX
Integrated approach for managing quality
in order to support the transition to
system management.
Conceptual model
Step by step following recognised
practise
FIVE S
OM BPR
QCC
QMS
TPM
QM
TQM
Managing for Quality
The Big Man W. Edwards
Deming
Ph.D. in Physics
Western Electric in 1920’s, 30’s.
WWII taught Quality Control for war effort
Ignored after the war
Japan wanted to learn from the US
• Deming went to help with census
• Started teaching them quality control
• 1951 Deming Prize for high level of achievement in
quality practices
1980 NBC “If Japan Can…Why Can’t We?” US discovers
Exhibit Extra The Deming Cycle
• Plan: study current situation
• Do: implement plan on trial basis
• Study: determine if trial is working
correctly
• Act: standardize improvements
Quality Philosophy
“A product or service possesses quality if it helps
somebody and enjoys a good and sustainable
market.”
Variation is the cause of poor quality
The Process
• Product/service design
• Manufacture/service delivery
• Test
• Sales
• Market surveys
• Redesign and improvement
Improve Quality
Chain
Reaction Costs decrease because of
less rework, fewer mistakes,
delays, better use of time &
materials
Productivity
Improves
Capture market with
better quality and price
Stay in business
Provide jobs and
more jobs
System of Profound
Knowledge
1. Systems
1. Buying at lowest cost ignores everything else
2. Don’t suboptimize performance of one part at the
expense of total performance
2. Understanding variation
1. Variability is inherent in everything
2. Variation from human behavior hurts quality
3. Theory of Knowledge
1. Experience is not enough. You need a theory
4. Psychology
1. Fear and pay are not motivators
If you don’t get it…
Systems:
• See symptoms, not causes
• Don’t see effects of one part on the others
Variability
• See trends where there are none, miss others
Psychology
• Create cynicism, demoralization, guilt, resentment,
burnout, craziness, and turnover
Theory of Knowledge
• Problems remain unsolved, despite best efforts
Deming’s 14 Points
1. Create a vision and demonstrate commitment
1. Long-term vision
2. Companies purpose is to serve their customers and
employees, not simply for profit
3. Invest in innovation, training, research
4. Improve competitive position
5. Top management is responsible for this
6. Effective leadership begins with commitment
14 Points
2. Learn the New Philosophy
1. Quota-driven, adversarial management won’t work
2. That ignores importance of quality improvement
3. Labor and management have to cooperate to improve
the customers’ satisfaction
4. Keep training people – turnover does exist
3. Understand Inspection
1. Routine inspection – let someone else fix it
2. Increases costs in the end (no rework in services)
3. Inspect your own work and fix it
4. Don’t Buy on the
Cost per Part Basis
• Don’t buy from several for competition
• Increases variability
• Work with suppliers in long-term
relationships
• Improve quality with your suppliers
• Also get volume discounts, fewer setups
• Supplier-customer bond
5. Improve Constantly and
Forever
Reduce causes of variation
Engage all employees
• How to do jobs more efficiently
• More effectively
Continuous Process Improvement now is
mandatory
6. Institute Training
People are a valuable resource and want to do a good job
They need training to know how to do a good job
Invest in their future
Training should include tools for
• Diagnosing
• Analyzing
• Solving quality problems
• Identify improvement opportunities
7. Institute
Leadership
The job of management is leadership, not
supervision.
If supervisors don’t know the job, they
can’t lead
• Focus on getting product “out the door”
Good supervisors are coaches, not prison
guards
8. Drive Out Fear
Managers and workers must have mutual
respect, 2 way communication
Pointing out quality problems and will
everybody will work effectively
9. Optimize the Efforts
of Teams
People have to understand what
customers want
No barrires should be there between
R&D, Sales, Admin, Production….
Team should tackle the problem
10. Eliminate
Exhortations
Do you work better with a poster on the wall?
Slogans assume quality problems caused by
people
Deming thinks the system is responsible for
problems
Workers demoralized when they cannot fix
defects, and yet are held accountable
Workers’ attempts to fix problems only cause
more variation
11. Eliminate Numeric
Quotas
They do not encourage improvement
• If you do improve it, they’ll just raise the quota
Risk of missing quotas
Once you meet the standard, why try harder?
Arbitrary (random) goals are demoralizing without
a plan of how you can reach those goals
Variability in system year-to-year
Use statistical method to improve quality
12. Remove Barriers
to Pride in
Workmanship
People are treated like a commodity
Work nights to make up for cut positions
Don’t make your people compete against
each other
Behavior driven by what boss wants, not
Quality
13 Education & Self-
Improvement
Not job-specific
Many benefits, some specific to job,
others broader
An org not only need good people but
also people who improve with eduction
14. Commitment
from Top
Accomplish the Transformation
Start the cultural change with top
management
People will be skeptical until they start to
see change
Armand Feigenbaum
Dr. Feigenbaum was a former manager of Manufacturing Operations and Quality
Control at General Electric. He maintained that quality responsibility extends far
beyond the manufacturing department. He said that quality in manufacturing could
not be achieved if the products were poorly designed, inefficiently distributed,
incorrectly marketed and improperly supported at the customer site. Thus
Feigenbaum’s idea that every function within the organization is responsible for
quality was developed and became known as ‘Total Quality Control’.
Feigenbaum talks about ‘9Ms of Quality’:
Markets
Money
Management
Men
Motivation
Materials
Machines and Mechanization
Modern Information Methods
Meeting Product requirements
He also originated the concept of ‘cost of quality’ as a means of quantifying
benefits of adopting a total quality management approach.
Kaoru Ishikawa
Ishikawa shaped the Japanese quality movement through his vision and
activities associated with the Union of Japanese Scientists and Engineers
(JUSE). He developed the concept of true and substitute quality
characteristics, the former referring to the customer’s view of product
performance and the latter referring to the producer’s view.
His concept of Quality Control contains six fundamental principles:
Quality first
Consumer orientation
Breaking down the barrier of sectionalism
Utilization of statistical methods
Participatory management
Cross-functional management
Ishikawa has been associated with the development of many quality tools,
primarily the Cause-effect diagram, also called the Fishbone diagram or
the Ishikawa diagram. He also developed the Quality circle concept in the
early 1960s.
Joseph Juran
Joined Western Electric in 1920s.
1951 – Quality contol handbook
Taught quality principles to Japanese in 1950s
• Quality directed by senior management
• Train whole mgt hierarchy in quality
• Strive for evolutionary changes in Quality
• Report progress to executive levels
• Involve the workforce in quality
• Quality part of reward/recognition structure
Difference in Juran
Not a major cultural shift
• Top management understands money
• Workers understand parts
• Middle management has to translate
Eliminate defects through statistical study
Views of Quality “Fitness
for Use”
Quality is related to:
• Product performance that results in customer satisfaction
• Freedom from product deficiencies, which avoids customer
dissatisfaction
The mission of the firm is to:
• Achieve high design quality
The mission of each department is to:
• Achieve high conformance quality
• Process have PCI – Budget, expense measurement, cost
reduction (141)
Quality Trilogy
Quality Planning
• Preparing to meet quality goals, Identify
customer, determine there need, translate
those need into our language, develop a pdt
that can respond those needs and optimize the
pdt feature to meet cm need.
Quality control
• Meeting quality goals during operations,
Develop a process which is able to produce
pdt, optimise the process
Quality improvement
• Breaking through to unprecedented levels of
performance, prove that the process can
produce the product under operating
condition and optimize the process
Juran’s Detailed
Program
Prove the need for improvement
Identify projects for improvement
Organize support for the projects
Diagnose the causes
Provide remedies for the causes
Prove remedies are effective under operating
conditions
Provide control to maintain improvements
Genichi Taguchi
Taguchi delved on the engineering approach to quality. He termed
variation as ‘noise’ and attempted to minimize noise through quality
activities. He proposed the use of optimization theory and techniques,
along with experimental design, with the ultimate focus of minimizing
loss to society.
Taguchi targets design for quality by defining three design levels:
System design (primary): functional design focussed on pertinent
technology
Parameter design (secondary): means of reducing cost and
improving performance without removing cause of variation
Tolerance design (tertiary): means of reducing variation by
controlling causes, but at an increased cost
The Taguchi approach to both parameter design and tolerance design
makes use of cost-performance optimization and experimental design
technology.
Shigeo Shingo
Shingo says that statistical based quality control is not conducive
to zero defects. He proposed a poka-yoke system (mistake
proofing) to totally eliminate defects.
The mistake-proofing concept is a human or machine based series
of 100% source inspections, self -checks or successive checks to
detect abnormalities as and when they occur and correct them on
the current unit of production as well as system-wide.
His Zero Quality Control System comprises the following principles:
Use source inspection
Always use 100% source inspection
Minimize time required to carry out corrective actions
Set up poka-yoke devices
Philip Crosby
Corporate VP for Quality at International
Telephone and Telegraph, ITT for 14 years.
Quality is Free – 1 million copies sold.
He talked about 4 absolutes of quality (the
definition, the system, the performance
standard and the measurement)
Philip Crosby
Quality means conformance to requirements,
not elegance
• Either you meet the requirements or not
• Determine requirements up front, and very carefully
There is no such thing as a “quality” problem
• There are accounting, mfg, design problems
• Quality originates in those depts., not in QC
There is no “economics of quality”
Crosby Philosophy
Only quality cost is non-conformance
• 15-20% of sales on quality costs
• Well-run, it can be 2.5%
• Measure & publicize cost of poor quality
• Provides visible signs of improvement
Zero Defects
• Do it right the first time, prevent defects, don’t fix
them
• Human errors from lack of attention, because we
assume errors are inevitable
Chapter 15 Influential Leaders in Quality
Management
Philip B. Crosby
• Wrote Quality is Free in 1979, which brought quality to
the attention of top corporate managers in the U.S.
• Crosby’s Absolutes of Quality Management include:
Quality means conformance to requirements, not
elegance.
There is no such thing as a quality problem.
There is no such thing as the economics of quality;
doing the job right the first time is always cheaper.
The only performance measurement is the cost of
quality, which is the expense of nonconformance.
The only performance standard is Zero Defects
(ZD).
Crosbys 14 steps
Management Commitment
Q Improvement Team
Q Measurement
Cost of Quality
Q Awareness
Corrective Action
Zero defect planning
Supervisor training
ZD Day
Goal Setting
Error Cause removal
Recognition
Quality Council
Do it over again
Six Sigma
• Six Sigma is a business improvement
approach that seeks to find and eliminate
causes of defects and errors in
manufacturing and service processes by
focusing on outputs that are critical to
customers and results in a clear financial
return for the organization.
• Used by companies including Motorola,
Allied Signal, Texas Instruments, and
General Electric.
Chapter 15 Quality Management
Six Sigma
Defects are any mistakes or errors that are
passed on to the customer (many people
also use the term nonconformance).
Defects per unit (DPU)=Number of defects
discovered
Number of units processed
Chapter 15 Quality Management
Six Sigma
• The Six Sigma concept characterizes
quality performance by defects per
million opportunities (dpmo),
computed as DPU × 1,000,000
opportunities for error (or, as is
often used in services, errors per
million opportunities – epmo).
Chapter 15 Quality Management
Six Sigma
• A DPU measure might be lost bags per
customer. However, customers may have
different numbers of bags; thus the number of
opportunities for error is the average number
of bags per customer.
• If the average number of bags per customer is
1.6, and the airline recorded 3 lost bags for
8,000 passengers in one month (note: 12,800
opportunities for error in one month), then
epmo = (3/8,000 DPU) × 1,000,000/1.6 =
234.375
Chapter 15 Quality Management
Six Sigma’s DMAIC Process
1. Define: identify customers and their
priorities; identify and define a suitable
project; identify CTQs (critical to quality
characteristics).
2. Measure: determine how to measure the
process and how it is performing; identify
key internal processes that influence CTQs
and measure current defects.
3. Analyze: determine likely causes of defects
and understand why defects are generated
by identifying key variables that cause
process variation.
Chapter 15 Quality Management
Six Sigma’s DMAIC Process
4. Improve: identify means to remove
causes of defects; confirm key
variables; modify the process to stay
within acceptable range.
5. Control: determine how to maintain
improvements; put tools in place to
ensure that key variables remain
within acceptable ranges under the
modified process.
Why is Six Sigma Important?
Cost of Poorly Performing Processes
σ level DPMO CP3
2 308,537 Not Applicable
3 66,807 25%-40% of sales
4 6,210 15%-25% of sales
5 233 5%-15% of sales
6 3.4 < 1% of sales
Each sigma shift provides a 10% net income improvement
Sigma (σ ) is a measure of “perfection” relating to process performance
capability … the “bigger the better.”
A process operating at a “Six Sigma” level produces only
3.4 defects per million opportunities (DPMO) for a defect. Without
dedication of significant and appropriate attention to a process, most
processes in leading U.S. companies operate at a level between 3 and 4
sigma.
Six Sigma COPIS Model
Outputs Process Inputs
Customers Suppliers
Steps How does Six Sigma Work?
The Voice of the Customer (VOC) is aggressively sought and rigorously
evaluated and used to determine needed outputs and hence the optimal
process configuration needed to yield those outputs and their necessary
inputs for which the best suppliers are identified and allied with.
From Concept to Market: the Voice of the Customer
Chapter 15 The GAP Model
The GAP model recognizes that there are several
ways to misspecify and mismanage the creation and
delivery of high levels of quality. These “gaps” are
shown in the model in Exhibit 15.2 and explained
below.
• Gap 1 is the discrepancy between customer
expectations and management perceptions of
those expectations.
• Gap 2 is the discrepancy between management
perceptions of what features constitute a target
level of quality and the task of translating these
perceptions into executable specifications.
Exhibit Gap Model of Quality
15.2
Chapter 15 The GAP Model
Gap 3 is the discrepancy between quality
specifications documented in operating and
training manuals and plans and their
implementation.
Gap 4 is the discrepancy between actual
manufacturing and service delivery system
performance and external communications to
the customers.
Gap 5 is the difference between the
customer's expectations and perceptions. The
fifth gap depends on the other four.
Exhibit Gap Model of Quality
15.2
Cost of Quality Measurements
The cost of quality refers to the costs
associated with avoiding poor quality or
those incurred as a result of poor quality.
• Prevention costs are those expended to
keep nonconforming goods and services
from being made and reaching the
customer.(planning, organising, training,
admin cost)
• Appraisal costs are those expended on
ascertaining quality levels through
measurement and analysis of data to detect
and correct problems.(reports, audit, pdt
review, q engg cost, maintenance,
Chapter 15 Quality Management
• Failure costs are costs incurred as a
result of unsatisfactory quality that is
found before delivery of good or service
to the customer ie manufacturing and
ususage of product.ie cost of labour,
material, rework, reprocessing, cost of
replacement, goodwill, loss of sale due
to publicity
• Hidden costs are incurred after poor-
quality goods or services reach the
customer. i.e cost of redesign due to
qulaity , change in manuf process, scrap
not reported, software change cost
ISO 9000
Chapter 15 Quality Management
ISO 9000:2000
• Quality standards were created in 1987 and
revised in 1994 and 2000 to improve product
quality, improve the quality of operation’s
processes, and provide confidence to
organizations and customers that quality
system requirements are fulfilled.
• Internationally recognized (and sometimes
required to do business in certain countries).
• Standardizes key terms in quality and
provides a set of basic principles for initiating
quality management systems.
ISO 9000
An international set of standards for quality
management.
Applicable to a range of organisations from
manufacturing to service industries.
ISO 9001 applicable to organisations which
design, develop and maintain products.
ISO 9001 is a generic model of the quality
process that must be instantiated for each
organisation using the standard.
ISO 9001
ISO 9000
certification
Quality standards and procedures should be
documented in an organisational quality manual.
An external body may certify that an organisation’s
quality manual conforms to ISO 9000 standards.
Some customers require suppliers to be ISO 9000
certified although the need for flexibility here is
increasingly recognised.
ISO 9000 and quality
management
ISO 9000
quality models
instantiated as
documents
Organisation Organisation
quality manual quality process
is used to de
velop instantiated as
Project 1 Project 2 Project 3 Project quality
quality plan quality plan quality plan management
Supports
Documentation
standards
Particularly important - documents are the tangible
manifestation of the software.
Documentation process standards
• Concerned with how documents should be developed,
validated and maintained.
Document standards
• Concerned with document contents, structure, and
appearance.
Document interchange standards
• Concerned with the compatibility of electronic
documents.
Documentation
process
Incorporate
Create Review Re-draft
review
initial draft draft document
comments
Stage 1:
Creation Approved document
Proofread Produce Check
text final draft final draft
Stage 2:
Polishing Approved document
Layout Review Produce Print
text layout print masters copies
Stage 3:
Production
Document
standards
Document identification standards
• How documents are uniquely identified.
Document structure standards
• Standard structure for project documents.
Document presentation standards
• Define fonts and styles, use of logos, etc.
Document update standards
• Define how changes from previous versions
are reflected in a document.
Document
interchange
standards
Interchange standards allow electronic documents to be
exchanged, mailed, etc.
Documents are produced using different systems and on
different computers. Even when standard tools are used,
standards are needed to define conventions for their use
e.g. use of style sheets and macros.
Need for archiving. The lifetime of word processing systems
may be much less than the lifetime of the software being
documented. An archiving standard may be defined to
ensure that the document can be accessed in future.
Quality planning
A quality plan sets out the desired product
qualities and how these are assessed and
defines the most significant quality attributes.
The quality plan should define the quality
assessment process.
It should set out which organisational
standards should be applied and, where
necessary, define new standards to be used.
Quality plans
Quality plan structure
• Product introduction;
• Product plans;
• Process descriptions;
• Quality goals;
• Risks and risk management.
Quality plans should be short, succinct
documents
• If they are too long, no-one will read them.
Software quality
attributes
8 QUALITY MANAGEMENT
PRINCIPLES( As per ISO 9000 Standard )
• CUSTOMER FOCUS
• LEADERSHIP
• INVOLVEMENT OF PEOPLE
• PROCESS APPROACH
• SYSTEM APPROACH TO MANAGEMENT
• CONTINUAL IMPROVEMENT
• FACTUAL APPROACH TO DECISION MAKING
• MUTUALLY BENEFICIAL SUPPLIER RELATIONSHIPS
Quality control
This involves checking the software
development process to ensure that
procedures and standards are being
followed.
There are two approaches to quality
control
• Quality reviews;
• Automated software assessment and
software measurement.
Quality reviews
This is the principal method of validating the quality
of a process or of a product.
A group examines part or all of a process or
system and its documentation to find potential
problems.
There are different types of review with different
objectives
• Inspections for defect removal (product);
• Reviews for progress assessment (product and
process);
• Quality reviews (product and standards).
Problem Solving
Methodology Phase 1:
Define
Phase 2:
Characterization
Measure
Phase 3:
Breakthrough
Analyze
Strategy
Phase 4:
Improve
Optimization
Phase 5:
Control
Projects are worked through these 5 main
phases of the Six Sigma methodology.
Basic Elements of
Improvement
Determination – top management must
take Q seriously
Education – everyone knows the
absolutes
Implementation – everyone in
management has to understand the
implementation process
Similarities &
Differences
Quality is imperative for competitiveness
Top management must lead the way
Quality efforts save, not cost, money
Continuous, never-ending improvement
Importance of understanding the
customer’s needs
Worker / management partnership
Basic Tenets
(belief) of TQM
1. The customer makes the ultimate
determination of quality.
2. Top management must provide leadership
and support for all quality initiatives.
3. Preventing variability is the key to
producing high quality.
4. Quality goals are a moving target, thereby
requiring a commitment toward continuous
improvement.
5. Improving quality requires the
establishment of effective metrics. We must
speak with data and facts not just opinions.
Total Quality Management
Operation
Management
Discipline and profession that studies
and practice process of planning,
designing, operating production system
and subsystem
OM dels with process
Management should be interpreted
broadly to include designing the system
and performing all activites reqd.
Productivity
Using resources more efficiently thereby
reducing the unit cost of production.
Org should have strategy to that reflects
mission and defines organsation goal.
Operation Manager
Design & Planning Operation & contrl
Product design Planning
Capacity planning Material mgmt
Process design
Maintenance
Inventory control
Facility location
Scheduling personnel
Facility design
Distribution & Logistic
Job design
Product Q
Assurance
Tools used in OM
Forecasting method- Predicting product
demand, Predicting credit card payments,
Predicting material price
Linear programming- Scheduling
production, Scheduling personnel,
formulating product
Integer programming – Locating facilities,
scheduling machine
Heuristic – Scheduling Jobs, Designing
facilities, Designing production process
Queuing Analysis – Planning capacity,
Configuring & designing process
Decision Analysis – Planning capacity,
Locating facilities, Selecting new product.
Simulation – Designing facilities &
processes, Scheduling Operations,
Managing inventories.