Presentation On Department Training Technical (SSU-4) : Presented By: Jayanth.k
Presentation On Department Training Technical (SSU-4) : Presented By: Jayanth.k
training
Technical(SSU-4)
Chemica
Classifica Polymer Carbon Silica Oil
l
tion transfer Loading Loading Loading
Loading
semi
Stacking ,
Tagging auto
Polymer
& chemical
Put up
Sampling Preparat
ion
Not
OK
Polymer Chemical
Mixing
Charging Charging
Cooling
Manual
Chemica
O
K
l
Preparat
Batch off ion
Mill /
Dump
Conveyor
mill
Lab
Testing
Sl. No. Parameters # BB- # BB # BB-3 # BB-& 5
MIXER :
1 Manufacturer
2
3 Chamber total volume
4 Net volume for mixing
5 Rotor Vol.
6 Motor KW + No. + AC/DC
7 Gear box manufacturer
8 Rotor design
a Rotor design 6 wings 4 wings 4 wings 4 wings
b Friction ratio 1:1.10 1:1.10 1:1.10 1:1.10
c Rotor type Tangantial Tangantial Tangantial Tangantial
d Rotor RPM
9 Fill Factor 0.8 0.77
10 Cooling water
a Rotor 400 lit/min 300 lit/min 300 lit/min 300 lit/min
b chamber 500 lit/min 400 lit/min 400 lit/min 400 lit/min
c discharge door 50 lit/min 50 lit/min 50 lit/min 50 lit/min
d Hydraulic unit 150 lit/min 50 lit/min 50 lit/min 50 lit/min
11 TCU temp.
a Body (°C) 35 35 35 35
b Rotor (°C) 35 35 35 35
c discharge door (°C) 30-35 30-35 30-35 30-35
12 MIll
1 Manufacturer
2 size
1. Compound formulation
2. Compound batch weight / fill factor
3. Mixing steps and procedures mixing
4. Mixer applied batch pressure
5. Mixer RPM
6. Mixer temperature
7. Environmental effects
Raw Materials For Mixing
• RSS 4
Natural Rubber • ISNR20
• SMR20
• SBR
• N220
Carbon •
•
N330
N660
• N326
Chemicals •
•
Peptizer, PVI
Anti Oxidants ,Wax
• Accelarator ,Sulphur
Dipping Process
Raw Fabric Vaccu Dryer Pull Flexure
Rolls m Box Zone Roll 3 Unit
Squeeze Norma
Let Off Pull Wind Up
Roll lizing
Stand Roll 1 Accumulator
Pressure Zone
Fabric
Dipping
EXTRUSION
Stamping
Code Inspec
Identificatio Polythen tion
n e App.
Cushion Polythene
Applicatio and Colour Cooling Sponge
Skiving Weighing
n code Line Unit
application
Dual Extruder
Sohal
Mill
Cushion
Compound Process
150 MM 200 MM 250 MM
SCREW DIAMETER
L / D RATIO 16 : 01 16 : 01 8 : 01
(Tensioner Filler
Unit)
Feed Mill
Filler to
Tyre Building Booking
Cracker
Mill
Sidewall to
Tyre Building
Sidewall or
Filler
Compound
MP Extruder Process
L/Off
Dipped L/Off Splicing Pre Tension
Accumulato
Fabric Stand Unit Roll
r
Dryer
Post
W/up Pre w/up
Cooling Calendar
W/up stand Accumulato Centre Pricking
Cane Tension
r Guide
Roller
Flow diagram tyre curing
AGING
G.T. FOR
STORAGE JAMMING AWLING PAINTIN PAINTED
G TYRE
NOT OK POST
VISUAL FLASH CURE CURING
INSPECTION TRIMMING INFLATION PROCESS
OK
FINISH
OK GOOD
NOT OK OK
BALANCING 2ND LINE STOREAGE
INSPECTION
NOT OK NOT OK
NOT OK
OK OK
4-HPS OFF,CW IN,CIR COLD WATER Cold water to cool cured tyre, Cold water
OFF
CIR off for maintain pressure inside.
5-CW IN,CIR COLD WATER ON Continuous cooling.
6-COLD WATER OFF,OPEN MAIN Drain internal condensate.
DRAIN
Splicing
Identificaiton
HIGH TABLE NEW HIGH TABLE NEW LOW TABLE OLD LOW TABLE
BIAS CUTTER BIAS CUTTER BIAS CUTTER BIAS CUTTER
FLIPPING
• CORD WHICH WRAPS THE BEAD WIRE AND BEAD FILLER.
• IT IS USED TO ANCHOR THE BEAD INTO THE TYRE AND TO STIFFEN THE LOWER SIDE WALL.
• FILLER IS A CALANDERED FABRIC.
• THE FLIPPER COMPOUND IS PLACED ON THE FLIPPING M/C AND THE FILLED BEAD IS PLACED
OVER FLIPPER.
TYRE BUILDING MACHINES
PLANT 1 PLANT 3
RB-5[3] RB-3[4]
59J-[11]
Tread
TB 1 Preparation
NOT OK
TYRE
Inspection TB 5 HOLD
OK Repair
BUILDING NOT OK
Disposition Reject
FLOWCHART
OK
OK
TYRE CURING
SPECIFICATION OF BEAD
WINDING MACHINE
• LENGTH OF MACHINE---- 55.75 INCH.
• HEIGHT OF MACHINE----- 56.75 INCH.
• PRODUCTION TARGET-----2 X 3250 BEADS PER SHIFT.
• MACHINE PRODUCES 13 BEADS PER MIN.
• KNIFE WHICH CUTS THE BEADS AT END IN MADE UP OF TOOL TACTIC 6 HSS.
• IT HAS A BAWL TO GRIP BEAD WIRE.
• IT HAS A FESTOONER MOTOR TO PULL WIRES FROM WIRE SPOOL.
• AGEING TIME FOR BEAD INSULATION COMPOUND IS MIN 8Hrs AND MAX. 15 DAYS.
• AGEING TIME FOR COVERED BEAD IS 2 HRS min. AND 7 DAYS max.
• AGEING TIME FOR UNCOVERED BEAD 2 HRS min. AND 4 DAYS max.
BEAD WINDING
BEAD-
• IT IS A BAND OF HIGH TENSILE STRENGTH STEEL WIRE AND CASED IN A
RUBBER COMPOUND. BEAD WIRE IS SPECIALLY COATED WITH SPECIAL
ALLOYS OF BRONZE OR BRASS.
• BEAD IS USED TO PROVIDE CLAMPING STRENGTH AT THE RIM FLANGE.
• IT IS THE AREA OF THE MOUNTED TYRE WHICH SEATS AGAINST THE WHEEL.
• THIS IS DONE TO GIVE HIGH MECHNICAL STRENGTH AND TO PROVIDE
ADHESIVE PROPERTIES TO RUBBER.
• BEAD WINDING USES A MACHINE HAVING A NO. OF CREELS OF COPPER
COATED STEEL WIRES AND PASSING THROUGH A CROSS HEAD EXTRUDER.
• THEN A COATING OF RUBBER IS DONE ON EACH GROUP OF STEEL WIRE
STRANDS AND THEN DURING WINDING A NO. OF TURNS ARE MADE.
BREAKER ASSEMBLY
Receipt of cut breaker rolls from slitter
Liner rewinding
Top and bottom
breaker assembly
Winding in liner
Function of a Calender
The main function of a calender is to prepare compounded rubbers a
uniform smooth sheet of definite thickness and width. The two allied
functions of the calender where fabric or cloth is involved are
frictioning, skim coating and topping. In frictioning a thin sheet of
rubber is forced into the intertices of the fabric by means of frictioning
thus leading to the term frictioning. The objective of skim coating is to
apply a thin coating of rubber on the fabric.
TYRE BUILDING MACHINES
PLANT 1 PLANT 3
RB-5[3] RB-3[4]
59J-[11]