0% found this document useful (0 votes)
57 views17 pages

Final Year Project Sep-Dec 2019

This document outlines the structure and timeline for a final year project to be completed from September to December 2019. It details the required sections and chapters for the project report, including an introduction, literature review, methodology, analysis, results, conclusion and references. It provides a timeline for milestones like the project approval, interim report, draft submission and final submission. It also describes the evaluation criteria for the project which will include assessments of the research, report, success in meeting objectives, and project management.

Uploaded by

ibrahim ibrahim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views17 pages

Final Year Project Sep-Dec 2019

This document outlines the structure and timeline for a final year project to be completed from September to December 2019. It details the required sections and chapters for the project report, including an introduction, literature review, methodology, analysis, results, conclusion and references. It provides a timeline for milestones like the project approval, interim report, draft submission and final submission. It also describes the evaluation criteria for the project which will include assessments of the research, report, success in meeting objectives, and project management.

Uploaded by

ibrahim ibrahim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Final Year Project

Sep-Dec 2019
INNOVATION!!!
Structure
• Title Page
• Tables
• Figures
• Abstract
• Chapter 1- Introduction, Problem Statement, Scope &
Objectives
• Chapter 2- Literature Review
• Chapter 3- Methodology
• Chapter 4- Analysis, Results and Discussions
• Chapter 5- Conclusion, Further Steps
• Chapter 6- References
• Evidence for Project management activities
TIME LINE
• WEEK 1 – START OF PROJECT
• WEEK 3 – APPROVAL OF PROJECT
• WEEK 12 – SUBMIT INTERIM REPORT
• WEEK 25 – COMPLETE DRAFT FYP
• WEEK 28 – SUBMIT – Online JIRA
Final Year Project
Final Submission- JIRA- UOS
Poster Presentation/Viva
Report Information
Evaluation
First Task Need to do by this Month
FINAL SUBMISSION REPORT

• Final report submission date will be announced later.


There is no hard copy submission. Online submission –
End of this semester.

• All Chapters should be in correct format.

• Format- Please read Module guide and Refer Template.


Poster Presentation
Poster presentation - A3
Date will be announced later through BB.
Viva- Electrical/Mechanical/Automotive.
Please refer the Template-available in BB
REPORT
• Content
• Table
• Figures
• Abstract
• CH-1 Introduction
• CH2 Literature review
• CH3 Methodology
• CH4 Detail Calculations/Analysis
• CH5 Discussions
• CH6 References
• Evidence Project management activity
PROJECT -EVALUATION
Research (Total out of 25) 25%
• Range and quality of references cited (out of 5)
• Summary and critical assessment of the material
(out of 10)
• Evidence of research informing the rest of the
project (out of 10)
Final Report (Total out of 25) 25%

• Grammar, use of English, quality of writing (out


of 10)
• Structure of dissertation, appropriateness of
length and content (out of 5)
• Presentation and clarity of results, main findings,
quality of diagrams (out of 10)
Success and Evaluation (Total out of 35) 35%

• Level of success against the project objectives


(out of 20)
• Critical evaluation of findings (out of 10)
• Appropriate consideration of ethics (out of 5)

Project Management and Control (out of


15) 15%
Total Marks

• Research 25%
• Final Report 25%
• Success and Evaluation 35%
• Project Management and Control 15%
 
Proposal
• Problem Statement
• Objectives 2 or 3 (No need more than 3)
• Introduction
Immediate Action-FYP 2

• Interim Report- Submission- Fourth Week- On or


before 27 Sep 2019.
• Must Include(complete version) Chapter 1,2,3 and
chapter 4.
• Should be in correct format.