HOT WATER
APPLICATIONS IN
RESIDENTIAL,
COMMERCIAL &
INDUSTRIAL SECTORS
RACOLD SOLAR WATER HEATER & HEAT
PUMP WATER HEATERS
APPAR GROUP
WHY WATER HEATING
THROUGH SOLAR ?
• Solar: a renewable source of energy
• Solar water heater is the most efficient ways to
generate hot water with payback < 2 years & low
maintenance costs
• Applications:
Domestic Commercial Industrial
Residential Hotels Laundry applications
Flats/ Apartments Hospitals Boiler feed water
Bungalows Hostels Textile & dairy
Gyms/ Spa/ Indirect heating of
Restaurants/ Canteens liquids viz milk,
chemicals, oil
ABOUT RACOLD SOLAR
• Racold Thermo Pvt. Ltd. an ISO 9001:2008 company, is a
fully owned subsidiary of Ariston Thermo Group – Italy,
• one of the leading players worldwide, in manufacturing
and marketing of water and space heating products and
their components.
• Ever since its inception, Racold Thermo Pvt. Ltd. went
on to change standards in the Indian water heater
industry by bringing in new technology, enhancing the
aesthetics, quality, durability and performance of the
product.
ABOUT APAAR GROUP
• Pioneers of Solar water heating in Uttar Pradesh,
with > 18 years of experience
• Completed Installations > 4,50,000 LPD
• Mission:
“To educate and create awareness about the
benefits of solar energy and to make it within
everybody’s reach by designing, developing and
marketing of solar thermal system adhering to
the stringent quality standards.”
CATEGORY
INSTITUTIONAL: MEDICAL HOSTEL
Project Era’s Medical
college,
Lucknow
Date of Installation 2015-2017
Fuel Replaced Electric
Racold Solution Indirect heating
Average Hot Water 20000 ltrs
use/ day
Annual Saving 37,70,928/-*
Actual Investment 59,40,000/-
Pay back years 1.5 yrs*
CATEGORY
RESIDENTIAL: APARTMENTS
Project NCC Saryu
Apartments,
Lucknow
Date of Installation 2016-17
Fuel Replaced Electric
Racold Solution Direct Npx
Average Hot Water 23000 ltrs
use/ day
Annual Saving 31,20,768/-*
Actual Investment 36,00,000/-
Pay back years 1.5 yrs*
CATEGORY
INSTITUTION: COLLEGE HOSTEL
Project RGIPT institute,
Amethi, UP
Date of Installation 2016
Fuel Replaced Electric
Racold Solution Direct px heat
exchanger
Average Hot Water 12500 ltrs
use/ day
Annual Saving 16,38,403/-*
Actual Investment 25,78,000/-
Pay back years 1.5 – 2 yrs*
CATEGORY
COMMERCIAL: HOSPITAL
Project Charak
hospital,
Lucknow
Date of Installation 2015
Fuel Replaced Electric
Racold Solution Direct
pressurized
Average Hot Water 7500 ltrs
use/ day
Annual Saving 9,10,224/-*
Actual Investment 15,40,000/-
Pay back years 1.5-2 yrs*
CATEGORY
COMMERCIAL: RESORT
Project Golden
Blossom,
Lucknow
Date of Installation 2016
Fuel Replaced Electric
Racold Solution Direct
pressurized
Average Hot Water 6000 ltrs
use/ day
Annual Saving 7,80,000/-*
Actual Investment 12,28,000/-
Pay back years 1.5-2 yrs*
CATEGORY
COMMERCIAL: HOSPITAL
Project Medics
Hospital,
Lucknow
Date of Installation ongoing
Fuel Replaced Electric
Racold Solution Direct
pressurized
Average Hot Water 7000 ltrs +
use/ day plate heat
exchanger
Annual Saving 6,72,000/-
Actual Investment 20,89,000/-
Pay back years 2-3 yrs*
CATEGORY
COMMERCIAL: HOSPITAL
Project S.K.D. Hospital,
Lucknow
Date of Installation 2016
Fuel Replaced Electric
Racold Solution Direct
pressurized
Average Hot Water 2000 ltrs
use/ day
Annual Saving 2,60,064/-*
Actual Investment 4,20,000/-
Pay back years 1.8-2 yrs*
CATEGORY
COMMERCIAL: HOTEL
Project Royal Sky
hotel, Lucknow
Date of Installation ongoing
Fuel Replaced Electric
Racold Solution Direct px + heat
pump
Average Hot Water 1000 ltrs+ 10kw
use/ day heat pump
Annual Saving 2,40,000/-*
Actual Investment 6,10,000/-
Pay back years 2-3 yrs*
CATEGORY
COMMERCIAL: INDUSTRY
Project L’Oreal, Pune
Date of Installation 2013
Fuel Replaced Electric
Racold Solution Direct px + heat
exchanger
Average Hot Water 32000 ltrs
use/ day
Annual Saving 33,00,000/-*
Actual Investment N.A.
Pay back years 3-4yrs*
CATEGORY
DOMESTIC: RESIDENTIAL
Project Mittal
Residence
Date of Installation 2016
Fuel Replaced Electric
Racold Solution Direct Px
Average Hot Water 200 ltrs
use/ day
Annual Saving 16,000/-*
Actual Investment 54,000/-
Pay back years 3-4yrs*
WHY WATER HEATING
THROUGH HEATPUMP ?
• Heat pump: Consumes 72% less energy than
electric geyser
• Wider applications
Parameters Heat Pump water heater Electric water heater
Operating Cost(%) 28 100
Place of Installation Any place Any place
Source of Energy 2/3 from atmosphere + 1/3 from Electrical power
electrical power
Heating Time* 2 hours (multiple heating cycle) 2-3hrs (multiple heating cycles)
Temperature of Hot water 55 C 60 to 70 C
Climatic constraints None( works throughout the None( works throughout the
year) year)
CATEGORY
COMMERCIAL: HOTEL
Project HOTEL
DREAMLAND
Date of Installation 2015
Fuel Replaced L.P.G.
Racold Solution Air source
heatpunmp
44kw(1000LPH)
Average Hot Water 6000 ltrs
use/ day
Annual Saving 3,65,000/-*
Actual Investment 7,50,000/-
Pay back years 1.8-2yrs*
CATEGORY
COMMERCIAL: CLUB &SPA
Project THE MPG CLUB &
SPA
Date of Installation 2016
Fuel Replaced DIESEL
Racold Solution Air source heat
pump
44kw(1000LPH)
Average Hot Water 6000 ltrs
use/ day
Annual Saving 3,30,000/-*
Actual Investment 7,50,000/-
Pay back years 2-3yrs*
CATEGORY
COMMERCIAL: VILLA
Project GK GROUP VILLA
Date of 2015
Installation
Fuel Replaced NEW PROJECT
Racold Solution Air source heat
pump 44kw with
5000Ltr tank
Average Hot 5000 ltrs
Water use/ day
Annual Saving 5,50,000/-*
Actual Investment 12,50,000/-
Pay back years 2-3 yrs*
THANK YOU !