Project Scope Management
Project Scope Management
Manajemen Proyek
What is Project Scope Management?
Project Scope
Management
Verify Create
Scope WBS
Project Scope Management)
These processes interact with each other and with the processes in the
the other knowledge areas.
Each process can involve effort from one or more person, based on the
needs project
Project charter
●
High‐level requirements
●
High‐level product description
Stakeholder register
Tools & Techniques
Interviews
●
Formal/informal, one‐on‐one
Focus groups
●
Pre‐qualified stakeholders & subject matter Experts
Facilitated workshop
●
Cross‐functional stakeholders
Tools & Techniques
●
Brainstorming
●
Nominal group technique (voting for the rank ideas)
●
The Delphi techniques (experts answer questionnaires)
●
Idea/mind mapping (commonality/differences)
●
Affinity diagram (ideas sorted into groups)
●
Unanimity
●
Majority
●
Plurality
●
Dictatorship
Tools & Techniques
Questionnaires and surveys
Observations
Prototypes
Outputs
Requirement Documentation
Project documents that may the update include, but are not limited to:
• Stakeholder register,
• Requirements documentation, and
• Requirements tracebility matrix
Proses Scope Management :
3. Create WBS
Is the process of subdividing project deliverables and project work
into smaller, more manageable components.
- Decomposition
Decomposition is the subdivision of project deliverables into smaller,
more manageable components until the work and deliverables are defined
to the work package level(the lowest level).
The level of detail for work packages will vary with the size and complexity
of the project.
Tools dan Teknik:
- Decomposition
Decomposition of the total project work into work packages generally
involves the following activities:
- Identifying and analyzing the deliverables and related work
- Structuring and organizing the WBS
- Decomposing the upper WBS level into lower level detailed components
- Developing and assigning identification codes to the WBS components
- Verifying that the degree of decomposition of the work is necessary and
sufficient
Output :
1. WBS
2. WBS Dictionary
3. Scope Baseline
4. Project Document Updates
1.WBS
The WBS is finalized by establishing control accounts for the work packages and a unique
identifier from a code of accounts.
2.WBS Dictionary
The WBS dictionary is a document generated by the Create WBS process that supports the
WBS. The WBS dictionary provides more detailed descriptions of the components in the WBS,
including work packages and control accounts.
Information in the WBS dictionary included, but is not limited to:
• Code of account identifier
• Description of work
• Responsible organization
• List of schedule milestones
• Associated schedule activities
• Resources required
• Cost estimates
• Quality requirements
• Acceptance criteria
• Technical references
• Contract information
3. Scope Baseline
The scope baseline is a component of the project management plan. Components of
the scope baseline include:
Project scope statement. Includes the product scope description, the project
deliverables and defines the product user acceptance criteria.
WBS. Defines each deliverable and the decomposition of the deliverables into work
packages.
WBS Dictionary. Has a detailed description of work and technical documentation for
each WBS element
2. Change Requests
Those completed deliverables that have not been formally accepted are documented,
along with the reason for non-acceptance. Those deliverables may require a change
request for defect repair. The change requests are processed for review and disposition
through the Perform Integrated Change Control process.
Control scope is the process of monitoring the status of the project and
product scope and managing changes to the scope baseline
Project scope control is also used to manage the actual changes when they
occur and is integrated with the control process
Outpu Tools &
Inputs Technique
ts s
●
Project management ●
Work performance
Varianc
plan measurements
●
Work performance
●
●
Organizational
information
process assets updates
Requirement
es
●
●
Change requests
documentation
●
Requirements
●
Project management
analysis
traceability matrix plan updates
●
Organizational process
●
Project document
assets updates
1.. Project Management Plan
Scope ●
The scope management plan describes how the
managemen plan project scope will be managed and controlled
Change ●
The change management plan defines the
management plan process for managing change on the project
Configuration The configuration management plan defines those items that are
●
●
Information about project progress, such as which deliverables have
started,their progress and which deliverable have finished
3. Requirements Documentation
●
Describes in section 5.1.3.1
●
Describes in section 5.1.3.1
●
The organizational process assets that can influence the control scope process include but are not limited to:
●
Existing formal and formal scope control-related policies,procedures and guidelines
●
Monitoring and reporting methods to be used
Tools and Techniques
“ Variance Analysis”
Organizational process ●
●
Causes of variances
Corectives action choosen and the reasons
assets updates ●
Other types of lessons learned from project scope control
Project management ●
Scope baseline updates
plan updates ●
Other baseline updates
Project document ●
Requirements documentation
update ●
Requirements traceability matrix
42
Study Case
Pelayanan Pelayanan
cepat dan
tersedia di yang baik,
mana saja ramah
Tingkat
keamana
n tinggi
Mengapa tingkat keamanan pada suatu bank
itu penting: