Controlled Demolition: Under The Guidance of Associate Prof. Dr. K. Kumar
Controlled Demolition: Under The Guidance of Associate Prof. Dr. K. Kumar
DEMOLITION
1
-SYED YUNUSS
Mtech Structural engineering
1MJ15CSE
Introduction
2
Manual methods
Demolition by machine
Demolition by wrecking ball
Demolition by explosion
Steps before demolition
5
Surveying
Building survey
Structural survey
6
Preparation plan
8
Safety measures
Sequence of operation
9
Manually Mechanically
10
Explosives
Floor
12
13
Detonation fuse
14
Test blast
Explosive
Before After
15
Wrapping of holes
16
Blasting
17
18
Clean up
Advantages
19
It is less expensive
The quickest method
Suitable for multi story structures/ piers / bridges
etc
Disadvantages
20
Dust
Noise
Vibration
Case study – chimney implosion
21
Thank you