MATERI 2
ORGANISASI INDUSTRI
GALANGAN KAPAL
24/10/2019 Organisasi Industri 1
Organisasi Industri Galangan
24/10/2019 Organisasi Industri 2
Shipbuilding Industry
An industry that produces products (ships, offshore
structures, floating plants etc) for customers
(private owners, companies, government, etc).
Shipbuilding Process
• Development of owner’s requirements
• Preliminary / concept design
• Contract design
• Bidding / contracting
• Detail design and planning
• Construction
24/10/2019 Organisasi Industri 3
Main shipbuilding tasks
Concept Design
Receive and review enquiries
Estimate cost Premilinary Design Plan Delivery
Negosiate contract
Finalise detailed Finalise building
design design
Prepare detailed Purchase Prepare detailed
product drawing materials build plans
Start construction
Monitor cost Monitor work Monitor materials
against estimate against plan delivery against plan
Reschedule product and program
Complete ship
24/10/2019 Organisasi Industri 4
Ship construction flow diagram
Steel stockyard Purchasing Design
Steel treatment
Production
Lofting
Steel preparation and drawing
P.P.C
Sub-assembly
Production
Engineering
Block assembly
Erection
Quality control
Launching
Outfitting / commisioning / trials
24/10/2019 Organisasi Industri 5
Basic sequence of Ship construction
• A preliminary lines plan and laid off to scale in lofting office
• Plates and section are brought into production shops from steel
stockyard and then, are straightened, shot blasted and primed in
the treatment line
• Rectangular plates are cut and the steel is also bent to fit the
ship’s contours
• The steel components are transported to be assembled and
welded together in the sub-assembly shop and facbricated into
major assembly or large block
• The large assemblies are erected on a building berth
• The ship is launched and towed after launch to a fitting out quay
• The ship goes to a dry dock for hull cleaning and painting
• The ship undergoes proving trial
24/10/2019 Organisasi Industri 6
Steelwork material flow diagram
Plate stockyard Stiffener stockyard
Plate treatment Stiffener treatment
Plate marking Stiffener marking
and cutting and cutting
Shaped unit Minor –assembly Plate/ stiffener panel
production production production
Shaped unit Unit built up from plate
built up panel and sub-assembly
Erection/ Berth
24/10/2019 Organisasi Industri 7
Shipyard organization
• Administration (payroll, accounting, labour, safety)
• Production (planning, scheduling and production control)
• Engineering (design, production engineering and information)
• Purchasing (raw materials, sub-contracted work and
competion)
• Quality assurance (vessel owner, regulatory agency and
class)
• Project management (progress, budget, schedules,
materials)
Trades
• Loftman, blaster, painter, burner, welder, labourer, crane
operator, machinist, electrician, carpenter, insulator and AC
equipment mechanics, pipe fitter, joiner, etc.
24/10/2019 Organisasi Industri 8
Typical Shipyard Facilities :
• A location and land for erecting a ship
• Piers for storing ships afloat
• Shops (steel marking, cutting, forming
shops, steel assembly shop, surface
preparation, coating shop, pipe shop, sheet
metal shop, machine shop, electrical shop)
• Storage, marshalling and out door work
areas
• Office and personnel support buildings
24/10/2019 Organisasi Industri 9
Definition of shipbuilding model :
It is based on the theory of production
applied to production run for predetermined
and fixed total output.
1- total output is fixed
at the time of contract signing
2- the times to start and complete
production are determined
3- the average production rate is
consequently determined
24/10/2019 Organisasi Industri 10
Function of shipbuilding model :
To analyze and explain cost over-run
in shipbuilding program, cost drivers and
how cost might be controlled using
better production management technique
Production function of shipbuilding :
- Defining a measure of output
- Time dependence of production cost
on resource utilization
- The effect on ship production cost
of changes in production rate
24/10/2019 Organisasi Industri 11
Production Output
- Percentage completion of the ship
- Components called work packages,
are estimated to require number of
manhours
- The work content of a ton of steel
24/10/2019 Organisasi Industri 12
Standard Production Function
Qt = Q (Kt, Lt, Et)
Where:
Qt = physical output rate
Lt = rate of use of labour at time t
Et = the efficiency effects of changes
to require output
Kt = rate of use of capital at time t
24/10/2019 Organisasi Industri 13
Qt = feet of pipe installed or tonnes of steel erected / day
or standard manhours / unit time
Lt = as quality adjusted labour, depends on
- ship sequence number
- number of workers
- time rate of changes in the number of worker
- length of the work day
- skill level
- experince level
Et = the effects of :
- incomplete or missing plan
- disruption of worker or support service
- worker morale
Rate of production is dependant on changes to the production
plan because of :
- Customer initiated changes to plans
- Estimation or scheduling errors by the builders
24/10/2019 Organisasi Industri 14
Character of Shipbuilding Model
- consists of many (n) discrete operations
or tasks
- the output of these tasks is an interim
product which is an input for
a subsequent product
- Output of construction processes are
work packages
- Total required output (q) =
sum of all required work packages
24/10/2019 Organisasi Industri 15
Progress on the ship construction
processes (Pi (t)) =
Number of packages completed at time (t), SMH
Number of required work packages, SMH
(percent physical completion)
24/10/2019 Organisasi Industri 16
Time after start fabrication
Average actual manhours
Average planned manhours
Average change to total required output
Average overtime hours
24/10/2019 Organisasi Industri 17
Experience curve effect
Ya = a / X b
Where:
Ya = the average cost of X unit produced
X = number of identical unit
a = the cost of first unit produced
b = an exponent that varies with the
complexity of the ship
The experience curve effect indicates that average cost of
all units produced decline at constant rate as function of
accumulated experiences
The experience curve benefit (Percentage of improvement)
has been found at 5-10 % ranges
The reasons underlying the experience curve such as learning,
specialization, investment, scale effect
24/10/2019 Organisasi Industri 18
Organisasi Industri Galangan
Suatu Galangan Kapal, minimal mempunyai
fasilitas-fasilitas sebagai berikut:
1. Kantor
2. Fasilitas perancangan.
3. Gudang material.
4. Bengkel pelat dan pipa.
5. Bengkel mesin dan Listrik.
6. Tempat untuk pembangunan kapal.
7. Tempat untuk mereparasi kapal.
24/10/2019 Organisasi Industri 19
Organisasi Industri Galangan
Perletakan kantor, bengkel dan fasilitas-
fasilitas yang lain sangat tergantung kepada
bentuk tanah dimana galangan kapal
tersebut berada.
Yang harus diperhatikan dalam penyusunan
letak bengkel ialah berusaha memudahkan
urutan rangkaian pekerjaan dan aliran
material.
Harus diperhatikan pula posisi, kedalaman,
kondisi water front
24/10/2019 Organisasi Industri 20