PO 13499: Road Repair & Re-Asphalt Project

PO 13499 authorizes a road repair and re-asphalt project. The project goals are to complete construction safely, on time, within budget, with acceptable quality, and good documentation. Key documents include HSE plans, traffic management plans, method statements, job mix designs, ITPs for concrete and asphalt work, and method statements for patching, concrete work, asphalt work, and pavement marking. The project team includes representatives from engineering, HSE, document control, security, and the road supervisor.

Uploaded by

Darmawan Onrad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views

PO 13499: Road Repair & Re-Asphalt Project

PO 13499 authorizes a road repair and re-asphalt project. The project goals are to complete construction safely, on time, within budget, with acceptable quality, and good documentation. Key documents include HSE plans, traffic management plans, method statements, job mix designs, ITPs for concrete and asphalt work, and method statements for patching, concrete work, asphalt work, and pavement marking. The project team includes representatives from engineering, HSE, document control, security, and the road supervisor.

Uploaded by

Darmawan Onrad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 9

PO 13499 :

ROAD REPAIR & RE-ASPHALT PROJECT

USER
REPRESENTATIF
(ABBAS)

ROAD SUPERVISOR
- Darmawan

ENGINEER DOCUMENT HSE SECURITY RC


- Andri Sastrawan CONTROL - Juis Maro / Muh. Haerul - Bobby Ohoiwutun - Ardya Yosy
- Bongjung Kim / - Kresna Dinata - Rinto B / Mahendra P - Bambang Purwadi - Ariefandy Suong
- Ade Fianda/ Sodikun - Helly Pangkey
- Suharto / Irwan Satria
- Sutrisno
PO 13499 :
ROAD REPAIR & RE-ASPHALT PROJECT
PO 13499 :
ROAD REPAIR & RE-ASPHALT PROJECT
PO 13499 :
ROAD REPAIR & RE-ASPHALT PROJECT
PO 13499 :
ROAD REPAIR & RE-ASPHALT PROJECT
PO 13499 :
ROAD REPAIR & RE-ASPHALT PROJECT
FLOW CHAT PROSES ID TEMPORARY AND START TO WORK

MCU
(Medical Check Up)

Site Clinic DSLNG


([email protected])

MFC
(Medical Fitness Sertificat)

UNFIT FIT /
FIT WITH NOTE

Induction
(HSE Dslng)

ID Temporary (Security Dslng)

Training Permit to Work


(HSE Dslng)

FAIL PASS

Open Permit
& Start Construction
DOCUMENT :
1. HSE PLAN
2. TRAFFIC SAFETY MANAGEMENT
3. METHOD STATEMENT SURVEY MC-0
4. JOB MIX DESIGN CONCRETE
5. JOB MIX DESIGN BASE AGREGAT KLAS A
6. JOB MIX DESIGN ACBC & ACWC
7. ITP CONCRETE
• ITR Pre Pouring Concrete
• ITR Concrete Placement
• ITR Concrete Test Report
8. ITP ASPHALT WORK
• ITR Survey Report
• ITR DCP (Dynamic Cone Penetrometer)
• ITR FDT (Field Density Test)
• ITR Prime Coat and Tack Coat
• ITR Asphalt Checklist
• ITR Pavement Marking
9. METHOD STATEMENT PATCHING ASPHALT
10. METHOD STATEMENT CONCRETE WORK & PRECAST DRAINAGE
11. METHOD STATEMENT ASPHALT WORK
12. METHODE STATEMENT PAVEMENT MARKING
GOALS OF PROJECT
TO COMPLETE CONSTRUCTION OF THE PROJECT WITH THE FOLLOWING TARGETS :

1. SAFE

2. ON TIME

3. WITHIN BUGDET / COST EFFECTIVE

4. ACCEPTABLE QUALITY

5. GOOD DOCUMENTATION / ADMIN