Order Scheduler For Jabil

The document provides information on scheduling processes and order entry procedures for modules produced at Jabil's EPP and MCS plants for NCR. It outlines the steps for SOG teams to process orders in ERP and for logistic teams to enter the orders into portal systems to allow the plants to schedule production. Key contacts are provided for pricing, scheduling issues, and other order and production details. Production lead times by part number are also listed.

Uploaded by

Magesh Magi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views11 pages

Order Scheduler For Jabil

The document provides information on scheduling processes and order entry procedures for modules produced at Jabil's EPP and MCS plants for NCR. It outlines the steps for SOG teams to process orders in ERP and for logistic teams to enter the orders into portal systems to allow the plants to schedule production. Key contacts are provided for pricing, scheduling issues, and other order and production details. Production lead times by part number are also listed.

Uploaded by

Magesh Magi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 11

ORDER SCHEDULING PROCESS

MODULES & EPP - JABIL

- Manikandan.R
- Supply Planning

NCR Confidential
Order Process Layout for EPP – BUD Plant
SO Receiving from Jabil
team via Mail

SOG Team Process the SOG Team


Order in ERP
MAX = 200 & MIN =20 For
ALL EPP orders
I need to Enter those
order into
Logistic for EPP in BUD = Budapest, Interplant Manikandan
Deans, Gary Module Foxtrot portal
<[email protected]>

Based on the Portal entry


, they schedule the order Tas &
based on the capacity
Marton

2 NCR Confidential - Internal Use Only


Procedure for Budapest, Interplant Module Foxtrot
portal Order entry
http://susday4335/MIS/BUD/EPP/login.
asp

User Name: mm185472


Password:

3 NCR Confidential
Part Number
ERP Order Line =
from Jabil
1.1, 2.1 Etc

Order Quantity
Multiple of
20(MOQ) PO Attachments =
Jabil SO

We need to report
the order 3week LT
as Request Ship
Date
Comments = ERP
Number from SOG
team
Designation: 57-
Jabil –El paso

ERP PO Number =
Customer SO Save
Number

ERP PO Number =
Customer SO
Number
4
Order Process Layout for Modules – MCS Org (Chennai plant)
SO Receiving from Jabil
Based on the PD , again
team via Mail to NCR GSL
we need to reschedule
DUBLIN
the order in ERP

SOG Team Process the


Shipments & invoice to
Order in ERP GSL is done by surander

And CDP need to


schedule the order in GSL to Jabil is done by
MCS CDP function in ERP Andrew, Slammon
Dundee Finance

Buyer need to release the


PO to ISP Chennai against
what we scheduled

Production Planner
Schedule the order in
their System & provide
the promise Date

5 NCR Confidential
Scheduling Procedure in ERP – GSL MCS CDP function
MCS CDP

Order Returns

Sales Order

Click F11 & put


the order again
click ctrl + F11

And Enter SAD


date in Shipping
tab and right click
Schedule the order

Cross Verify the


order whether
schedule or not by
seeing main tab

6 NCR Confidential
Point of Contact for Modules –MCS Org

 sourcing rule and rule assignment for the site/supplier =Jeeva or Arun -
AK185315

 Scheduling Issue =Looney, Jason Eric <[email protected]>;


Doets, Robert <[email protected]>; Mellachervu, Sathya
<[email protected]>
 Pricing updates on Jabil side for SO =McCurry, Nancy M <[email protected]>; Holliday,
Antonio E <[email protected]>

 Invoice to Jabil = Andrew, Slammon


 Part need to set in MCS = Support, SCS EPC Team <[email protected]>
Cost in USL Org= All cost requests for the USL Org should go to the Nashville Cost Mailbox and not to Morag.
Nashville, Material Cost [email protected]

7 NCR Confidential - Internal Use Only


Key thing while schedule the order in ERP

 SAD & SSD are same in ERP even though we have 30day transit time
its due to Drop Shipment
 Jabil Team Calculate the +30day from IA report Status

 Shipping Method 45 Day-Ocean-Standard Service

 Transit Time from Jabil to Chennai = 45days in Ocean

 Transit Time from Jabil to Chennai = 45days in Air

8 NCR Confidential
If forecast is already available:
 4 weeks of Production lead time + 8 weeks Ocean Transit time
For un-forecasted lead time, we may have to add the Component lead time
 Component lead time (average 16 weeks) + 4 weeks of Production lead time + 8
Part
weeks Ocean Transit
Des
time TYPE LT IN DAYS
445-0756286-NCR S2 PICK MODULE ASSY FRU ZROH 28
445-0756287-NCR S2 SINGLE PICK MODULE FRU ZROH 28
484-0106245-NCR ASSEMBLY - SDM2 MID LONG INFEED W/O META ZROH 28
484-0106246-NCR ASSEMBLY - SDM2 LONG INFEED W/O METAL DE ZROH 28
484-0106467-NCR ASSEMBLY - SDM2 - CORE MODULE ZROH 28
484-0102774-NCR ASSEMBLY - TRAY WITH LIFT MECHANISM ZROH 28
484-0106045-NCR ASSEMBLY - SDM2 LONG INFEED WITH METAL D ZROH 28
484-0103266-NCR ASSEMBLY - CASH MIXED MEDIA ST ZROH 28
484-0103080-NCR ASSEMBLY - BALANCED MIXED MEDI ZROH 28
445-0756286-NCR S2 PICK MODULE ASSY FRU ZROH 28
445-0756287-NCR S2 SINGLE PICK MODULE FRU ZROH 28
484-0106244-NCR ASSEMBLY - SDM2 MID SHORT INFEED W/O MET ZROH 28
445-0764333-NCR S2 PRESENTER F/A FRU ZROH 28
484-0106467-NCR ASSEMBLY - SDM2 - CORE MODULE ZROH 28
484-0102774-NCR ASSEMBLY - TRAY WITH LIFT MECHANISM ZROH 28
484-0106200-NCR ASSEMBLY - DVM - STANDARD ZROH 28
484-0103266-NCR ASSEMBLY - CASH MIXED MEDIA ST ZROH 28
484-0103080-NCR ASSEMBLY - BALANCED MIXED MEDI ZROH 28
484-0106043-NCR ASSEMBLY - SDM2 MID SHORT INFEED WITH ME ZROH 28
445-0740055-NCR DOUBLE PICK-ASSY ZROH 28
484-0106090-NCR ASSEMBLY - SDM MID SHORT INFEED - 181mm ZROH 28
445-0761925-NCR PRESENTER ASSEMBLY - S1 FRONT ACCESS (12 ZROH 28
484-0106200-NCR ASSEMBLY - DVM - STANDARD ZROH 28
9 NCR Confidential - Internal Use Only
484-0106089-NCR ASSEMBLY - SDM TRANSPORT ZROH 28
Part Description LT/week

445-0769745-NCR S2 PRESENTER F/A FRU 12

445-0769744-NCR S2 PRESENTER F/A FRU 12

484-0098884 ASSEMBLY - P90 SCPM STACKING BIN 18

484-0100721 MID LONG INFEED 12

484-0100732 LONG INFEED 12

484-0100911 ASSEMBLY-UPPER STACKING BIN 12

484-0105162-NCR ASSEMBLY - SCPM SHORT INFEED 16

484-0105163-NCR ASSEMBLY - SCPM MEDIUM INFEED 12

484-0105218-NCR ASSEMBLY - SCPM CORE MODULE 12

484-0105977-NCR ASSEMBLY - SCPM BUNCH FEED MODULE 12

484-0106089-NCR ASSEMBLY - SDM TRANSPORT 12

484-0106090-NCR ASSEMBLY - SDM MID SHORT INFEED - 181mm 12

484-0106243-NCR ASSEMBLY - SDM2 SHORT INFEED W/O METAL DETECT - 147mm 12

484-0106244-NCR ASSEMBLY - SDM2 MID SHORT INFEED W/O METAL DETECT - 179mm 12

484-0106245-NCR ASSEMBLY - SDM2 MID LONG INFEED W/O METAL DETECT - 260mm 12

484-0106246-NCR ASSEMBLY - SDM2 LONG INFEED W/O METAL DETECT - 374mm 12

484-0106682-NCR ASSEMBLY - SDM TRANSPORT 16

484-0106860-NCR ASSEMBLY - TRAY WITH LIFT MECHANISM 12

484-0106866-NCR ASSEMBLY - CASH MIXED MEDIA STORAGE DECK 12

484-0106867-NCR ASSEMBLY - BALANCED MIXED MEDIA STORAGE DECK 12

484-0106872-NCR ASSEMBLY - SDM2 - CORE MODULE. 12

445-0768349-NCR S2 PICK MODULE ASSY 12

445-0768464-NCR S2 SINGLE PICK MODULE 12

10 NCR Confidential
THANK YOU

11 NCR Confidential