The document provides details of the proposed Mega Leather Park project in Kanpur, Uttar Pradesh. Some key points: - The project will develop a 300-acre integrated leather and footwear park with industrial plots for tanneries, footwear units, and more. - Infrastructure will include roads, water, sewage, electricity and a 20 MLD common effluent treatment plant. - The total estimated cost is Rs. 278.17 crore to be funded through government grants and contributions. - Several milestones have been achieved including land identification, surveys, and preliminary reports. Environmental clearance is pending while design and construction will begin once approvals are received.

Uploaded by

Sahil Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
334 views23 pages

Upsidc MLC Project Progress

The document provides details of the proposed Mega Leather Park project in Kanpur, Uttar Pradesh. Some key points: - The project will develop a 300-acre integrated leather and footwear park with industrial plots for tanneries, footwear units, and more. - Infrastructure will include roads, water, sewage, electricity and a 20 MLD common effluent treatment plant. - The total estimated cost is Rs. 278.17 crore to be funded through government grants and contributions. - Several milestones have been achieved including land identification, surveys, and preliminary reports. Environmental clearance is pending while design and construction will begin once approvals are received.

Uploaded by

Sahil Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Progress of Proposed

Mega Leather Park


at Senpurab Para,
Kanpur, UP

September 18, 2018


Project Details

Project Name

• Mega Leather Park


Location

• Village Sen Purab Para near Ramaipur in Kanpur Nagar District


• Proposed site is at a distance of about 15 Kms from Kanpur.

Land

• 417 acres of land has been identified, whereas only 300 acres will be allocated for the
development of MLP.

Nature of Activities

• House leather tanneries, footwear units, finishing and made ups units

SPV

• Kanpur Integrated Leather & Footwear Park Limited

2
Special Purpose Vehicle
• Name: Kanpur Integrated Leather & Footwear Park Limited

• CIN: U19200UP2018PLC105975

• Date of Incorporation: 05.07.2018

• Directors:
– Ranvir Prasad
– Kamlesh Kumar Yadav
– Sharat Chandra Mishra
– Rakesh Jha

3
Preliminary Proposal Details

INFRASTRUCTURE COMPONENTS
S. No Infrastructure Components
Physical Infrastructure
 Road network
 Water Supply System
 Sewerage & Effluent Collection System
1 Core Infrastructure  Storm Water Drainage System
 Street Lighting System
 Electrical Distribution System
Environmental Infrastructure
 Common Effluent Treatment Plant
 Administration offices, Investor and supplier services
centre
 Park management & Security offices
Social/HRD and R&D
2  Parking Facilities
Infrastructure
 R&D Centre
 Trade Centre
 Training centre & Testing labs

4
Preliminary Proposal Details

COMMON INFRASTRUCTURE
Infrastructure Details

Arterial Roads 30m, 24m & 21m wide roads

Storm water drainage Approximately 20km long

Water supply 20 MLD

Electricity 15 MW

Sewage 150 kLD

Effluent Collection & Treatment 20 MLD

5
Preliminary Proposal Details

TOTAL PROJECT COST


Sr. No. Particular Rs Lakhs
1 Land Development 1492
2 Core Infrastructure 16721
3 Social Infrastructure 2492.5
4 Production Infrastructure 6273.0
5 Consultancy Charges 809.33
6 Pre-Operative Expenses 30
Total Project Cost 27816.97

MEANS OF FINANCE
Means of Finance Rs Lakhs % Age
Grant from GOI 12500.00 44.94
Contribution from UPSIDC 15317.00 55.06
27817.00 100.00

6
Proposed Plot size and number of Units

Plots Number Area (acre) Plot Size (M) Total Area

Large Units 10 5 200 X 100 50

Medium Units 56 1 80 X 50 56

Small Units 71 0.5 60 X 35 36

Note: The number of plots for different industries will be discussed in the next
stakeholders meeting and than final decision will be taken on this.

7
Area Program

Land Use Percentage Area (acres) Area (m2)

Industrial Plots 47% 142 574654

Roads & Parking 13% 40 161874

Green Space 15% 47 190202

Common Amenities 5% 16 64749

Common Utilities 8% 24 96175

Production Infra 6% 20 80573

Total 100% 300 1214055

8
Proposed CETP

• A CETP of 20 MLD has been proposed in the MLP.


• Treated effluent discharge shall be mixed with STP treated water and will be
sent to proposed 210 MLD Bingawan STP treatment plant 6km away.
• Sludge generated in treatment process will be disposed in secured land
provided by UPSIDC.
• The CETP funding will be applied under the Indian Footwear Leather and
Accessories Development Programme (IFLADP) of DIPP.
• The CETP shall be constructed in different modules: First a 5MLD, then
10MLD and finally another 5MLD CETP shall be implemented at site.
• A conceptual design of the CETP have been submitted to UPSIDC for
perusal and approval. Once approved, the detailed project report will be
prepared in consultation with IIT Kanpur.

9
Proposed CETP

 Effluent collection is done by 3 different streams each 15km


long after pre-treatment:
o Soak Liquor

o Spent Chrome Liquor

o Wash Effluent

 Treatment system:
o Cleaner Production – Fleshing and Desalting.

o Chrome Recovery System

o Common Effluent Collection System

10
Milestones achieved
• Inception Report - Feb 2018
• Option Study Report – March 2018
• Draft Preliminary Project Report - March 23rd ,2018

• Final Preliminary Project Report submitted to DIPP for in-principle approval under MLFAC sub
scheme on March 27, 2018
• Preliminary Survey for land demarcation - April 26th to May 4th , 2018

• Boundary mapping- May 8th ,2018

• Draft of Revised Preliminary Project Report (excluding CETP) – May 23rd ,2018

• Final Revised Preliminary Project Report to DIPP– May 25th ,2018

• Pre-feasibility report for EIA in MoEF&CC – May 31st ,2018

• Topographical Survey- 1st June to 7th June, 2018

11
Project Progress
 The land demarcation has been completed and the drawings have been
submitted.

The topographical survey of the land is complete and the drawings have been
submitted.

Revised Preliminary Proposal has been submitted to DIPP, evaluation is in


progress by NPC

A conceptual master plan for 300 acres of land has been prepared and is under
development. (attached in next slide)

The detailed engineering of the common infrastructure will be started after


UPSIDC approval.

12
Conceptual Site Plan

13
Environmental Clearance
IL&FS Clusters has appointed Perfact Enviro solutions Pvt. Ltd. for EIA study.
 EIA Consultant has completed the process of Baseline data collection for 450 acres of the land
The consultants have submitted Form-1 and Pre-feasibility for TOR.
Our proposal was dismissed in the EAC meeting on 25th June, 2018 on the grounds that the
committee member haven’t got enough time to scrutinize the reports as the proposal comes in
Ganga Basin.
Our proposal was deferred in the EAC meeting held on 26th July, 2018, as the EAC members
needed commitment from the P.S. (industries or environment) that the Jajmau tanneries will be
shifted to the Mega Leather Park.
Via minutes of meeting of 26th July, 2018 meeting MOEF&CC have seeked some details and
documents. An action plan have been submitted in consultation with perfact group and submitted
to UPSIDC for comments.

14
Pending Requests

• Undertaking from govt. of UP for EC

• Land acquisition and possession

• Transition of land to notified industrial land

• Additional work order for 150 acres EC

• Release of Fees

• Review and approval of CETP design

• Permission for commencing Detailed Design of common infrastructure

• Demarcation of the 300 acres in which MLP is to be developed out of 417


acres.

15
Pending Fees

Sr. No. Completion of component Percentage Amount Status


/milestone of total (Rs.)
amount to
be released

1 Option Study Report 5% 1,57,699 Pending

2 Submission of draft preliminary 10% 3,141,399 Pending


report as per the scope of work
specified in TOR Phase I

3 Final Preliminary report as per the 10% 3,141,399 Pending


scope of work specified in TOR
Phase I

Total amount of Invoices (Inclusive of Taxes) 7,853,498 Pending

16
NTBCL Building,
Toll Plaza, DND Flyway,
Noida-201 301. (U.P)
ANNEXURE

18
Resources Required as per RFP

Sr. No. Staff Minimum Experience Minimum Number


Required Required

1 Master Planner 7 years 1

2 Team Leader 15 years 1

3 Other Key Professional 10 years 1

4 Other professional support staff 7 years 3

5 Survey/ other staff 5 years 1

19
CLE Letter to IL&FS Cluster

20
Invoice for Option Study Report

21
Invoice for Draft Preliminary Report

22
Invoice for Final Preliminary Report

23

You might also like