Tandem Lift

This document summarizes the lifting of a 24 MT load using two cranes. Crane I is a Linkbelt LS 418J with a maximum boom length of 60.96 meters and lifting capacity of 31.8 MT. Crane II is a Manitowoc 3900W series 2 with a maximum boom length of 76.2 meters and lifting capacity of 28.58 MT. The load will be lifted in parallel using slings rated to lift 31.82 MT per side, then positioned and secured at heights of 27.6 meters and 23.7 meters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
33% found this document useful (3 votes)
3K views

Tandem Lift

This document summarizes the lifting of a 24 MT load using two cranes. Crane I is a Linkbelt LS 418J with a maximum boom length of 60.96 meters and lifting capacity of 31.8 MT. Crane II is a Manitowoc 3900W series 2 with a maximum boom length of 76.2 meters and lifting capacity of 28.58 MT. The load will be lifted in parallel using slings rated to lift 31.82 MT per side, then positioned and secured at heights of 27.6 meters and 23.7 meters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Load description Conveyor Gallery

Dimension 21.0 x 7.5 x 4.5 Meter


Weight 24.0 MT

21 .0 Mtr

Rigger position
CRANE II CRANE I
CRANE - I CRANE - II
Link belt – LS 418J Manitowoc - 3900W series 2
Basic boom – 15.2 Meter Basic boom – 18.28 Meter
Maximum boom – 60.96 Mtr Maximum boom – 76.2 Meter

4.5 Mtr

7 .5 Mtr
CRANE LIFTING CAPACITY

LINKBELT ( CRANE I) MANITOWOC (CRANE II)


Boom Length 39.62 Meter 54.86 Meter
Operating radius 09 Meter 10 13.7 Meter (45’)
Lifting capacity in above radius 31.8 MT 28.58 MT
Weight of the load – 24 MT
Weight of the accessories – 1.5 MT
Total weight to be lift – 25.5 MT
75% of weight in total load 19.1 MT 19.1 MT
% of load crane to be lift 60% 66%
SLING LIFTING CAPACITY

LINKBELT ( CRANE I) MANITOWOC (CRANE II)


Sling 25 MM IWRC x 2 Nos 25 MM IWRC x 2 Nos
Length 06 Meter 06 Meter
Type of hitch Basket hitch Basket hitch

3 H/L x SWL x 2
2.9
.99 x 8 x 2 = 15.91
.3
Lifting capacity of the slings – 31.82 MT / side
SEQUENCE

1. Parallel lifting of the load

2. Move forward to get the position parallel to trestles

3. Lift the load up to the height 27.6 Meter

4. Position the load at higher elevation side

5. Lower the load up to the height 23.7 Meter

6. Position the load at lower elevation side

7. Bolting and welding of the load at both sides

8. Removal of slings
FINAL POSITION

27 .6 Mtr 23 .7 Mtr