IEC 61850 Testing

The document discusses IEC 61850 testing which includes: 1. Interoperability, functionality, and performance testing of devices to evaluate communication and functions. 2. Impact studies using detailed models to evaluate effects of devices on power systems. 3. Site commissioning to ensure integration, interoperability, and functionality of protection/control schemes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views10 pages

IEC 61850 Testing

The document discusses IEC 61850 testing which includes: 1. Interoperability, functionality, and performance testing of devices to evaluate communication and functions. 2. Impact studies using detailed models to evaluate effects of devices on power systems. 3. Site commissioning to ensure integration, interoperability, and functionality of protection/control schemes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 10

IEC 61850 Testing

25 AGUSTUS 2017

Tim Proyek PLN Pusenlis


IEC 61850-Conformance Testing

www.pln.co.id |
IEC 61850-Testing

1. Interoperability Testing
Perform single device testing, multiple device interoperability testing and system integration testing:
• Single device IEC 61850 testing covering both station bus and process bus
• IEC 61970 / IEC 61968 CIM testing
• Interoperability testing
• System integration and testing
2. Functionality Testing
Evaluate the functions of the DUT as specified and its response under the following conditions:
•  Single device protection setting, timing, zone reach testing
• Multiple devices protection scheme testing involving communication
• Single / multiple devices local / remote control schema, interlocking testing
3. Performance Evaluation
Co-ordination with utilities to define performance evaluation criteria, and to conduct performance evaluation in terms of latency delay, priority
handling and fall-over handling.  This applies to communication systems, as well performance evaluation on:
• Substation communication architectures
• Substation automation systems
• Energy management systems
• Distribution management systems
• Protection and control schemes

www.pln.co.id |
IEC 61850-Testing

3. Performance Evaluation
Co-ordination with utilities to define performance evaluation criteria, and to conduct performance evaluation in terms of latency delay, priority handling and fall-over
handling.  This applies to communication systems, as well performance evaluation on:
• Substation communication architectures
• Substation automation systems
• Energy management systems
• Distribution management systems
• Protection and control schemes
4. Impact Studies
By using detailed transient-based power system component models in the RTDS for impact studies, current and voltage signals from the RTDS are amplified and
injected into the DUT along with the digitally generated current / voltage / binary signals.
 Response from the DUT is fed back into the RTDS, where the simulation continues in real time to evaluate the impact of the DUT on the entire power system. The
scope of these impact studies includes:
• Single device and its impact on the power system
• Coordinated multiple devices and their impact on the power  system
• Interoperation schemes and their impact on the grid
5. Site Commissioning
One-stop site commissioning covering all aspects of:
• Integration test to ensure the entire Substation Automation System functions interactively
• Interoperability test to ensure the inter-relay protection / control schemes work as designed
• Functionality test to ensure the device / system functions effectively. This includes checking all set-points, verifying zone-reach and confirming time delays
associated with the scheme.