MEP works involve mechanical, electrical, and plumbing systems in construction projects. There are several key stages: 1. The design stage where consultants prepare tender packages for the owner with drawings, specifications, and a bill of quantities for contractors to bid on. 2. The tender stage where contractors submit financial and technical offers and the owner chooses the lowest cost, technically qualified contractor. 3. The approval stage where the contractor submits shop drawings and material details for the consultant and authority approval before installation. 4. The site works stage where the contractor supplies materials, requests inspections, and installs the MEP systems according to approved shop drawings and designs. 5. Final handover of

Uploaded by

Manoj Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views14 pages

MEP Works Overview

MEP works involve mechanical, electrical, and plumbing systems in construction projects. There are several key stages: 1. The design stage where consultants prepare tender packages for the owner with drawings, specifications, and a bill of quantities for contractors to bid on. 2. The tender stage where contractors submit financial and technical offers and the owner chooses the lowest cost, technically qualified contractor. 3. The approval stage where the contractor submits shop drawings and material details for the consultant and authority approval before installation. 4. The site works stage where the contractor supplies materials, requests inspections, and installs the MEP systems according to approved shop drawings and designs. 5. Final handover of

Uploaded by

Manoj Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 14

MEP WORKS

OVERVIEW
MEP MECHANICAL ELECTRICAL PLUMBING

consultant

contractor project owner

Authority
having
jurisdiction
MEP PREPARING AND DESIGNING STAGE

Projects
Needs tender drawings to be submitted to authority having
jurisdiction for reviewing and approving so the owner can
start his project.
MEP PREPARING AND DESIGNING STAGE

Consultants
Prepares tender package for the owner of the project.
Tender package Contains:
 design drawings
 Bill of quantity (BOQ)
 Vendor list
 Method of measurements
 specification
MEP TENDERS

Tender work
The owner searching for a contractor with the lowest cost
and best technicalities.
So all possible contractors submits there offers with two
component:
 Financial offer
 Technical offer
And this is up to the contractor
MEP APPROVALS

approvals

From authority
From
having
consultant
jurisdiction

Design
Materials Shop drawing
drawing
approval approval
approval
MEP APPROVALS

By the Prepared by
Design drawing

Shop drawing
consultants the contractor
Can be read by Can be read by
engineers only workers in site
Is a guide for work
the project Draw with
coordination
Actual sizes
MEP APPROVALS

• Material approval
All suppliers and manufacturers of any thing (technical offer).
• Shop drawing approval
Submitted from the contractor to the consultant for reviewing
and approving
MEP APPROVALS

Civil defence

Authority Water
having distribution
jurisdiction companies

Electric
company
MEP SITE WORKS

By the contractor
1. Supplying
2. Material inspection request MIR
3. Storing
4. Installation
5. Inspection requests IR
MEP SITE WORKS

By the contractor
1. Supplying

‫وكيل‬
‫مصنع‬ ‫مورد‬
‫وموزع‬
MEP SITE WORKS

MIR
Submitted by the contractor to the consultant for being sure
that each peace is just like the approved materials in the
technical offers.

IR
By the contractor to the consultant after installation to
review and be sure that the installations are just like
approved shop drawings.
Consultant work in site is called supervision.
MEP HAND OVER

After finishing all the systems in the project the contractor


hands it over to the owner with the approval from the super
visor.
And from this a guarantee and maintenance year starts.