Process Approach
Process Approach
• Father of Quality
• Understanding of the system
• Understanding variation
• Taught Japan after WWII and transformed quality
• In 1980 transformed American Quality revolution
• The foundations of Six Sigma
2
Basis of ISO Management Systems
3
PDCA
• If the check shows the •Establish objectives and
plan that was processes necessary to
implemented in DO is an deliver results in
improvement, then it accordance with the
becomes the new target expected outcomes
(targets)
Act Plan
Check Do
• Study the actual results • Implement the plan,
and compare against the execute the process and
expected results to collect data for
ascertain any gaps measurement and
Analysis
Process Approach – Management System Standards
PLANNING OF PROCESSES
A
C E F
B D
Documentation
Contracts review Purchasing
Processes
Corrective Actions
Management Inspections & Testing HSE
Processes
Delivery
Phase
Establishing the process – Planning
Governance Structure
• establish authority, responsibility and accountability for managing
processes
• understand the organization’s capabilities and determine resource
constraints prior to action
Establishing the process – Planning
Process inputs can be tangible or intangible. Inputs may come in the form of
people, equipment, materials, parts, assemblies, components, information,
money, and so on (see Figure below). The process transforms, changes, or
converts the inputs into an output. Inputs are the thing(s) that will be
transformed and the transformation mechanisms.
Objectives
Machine, Material Objectives, targets and Plan
Equipment, software, hardware,
tools, materials and substances
With
what
Location/Infrastructure
Access, working
conditions,
Weather Process
Conforming
Input
(Sequence of activities) Output Product/
Service
Method & Criteria
Procedures, Standards,
Method Statement
Man Monitoring
Training, Competency , skills,
Inspections, testing, analysis
experience, knowledge
and evaluation
Interacting activities
This part is usually not covered in the procedures, that how and
what will be done in case of conflicting activities. However, review
of procedure by interested parties/stakeholders prior to
implementation and meetings among the process owners can be
considered as measures to resolve these conflicts and these
conflicts may pose risk to the management system.
Transformation
Processes are responsible for the changes that take place within a system. Some call this
changing or a transformation. A process is developed solely to transforms inputs into
outputs, this transformation or change takes place as a series of activities or steps that
lead to a desired result (intended outcome).
The balancing and equilibrium of inputs and outputs is called the Law of Conservation.
The Law of Conservation requires that the sum of the inputs equal the sum of the
outputs for a given process. For example, the uncut metal plate input equals the
fabricated bracket, plus scrap and metal filings. The third principle is that the Law of
Conservation applies to a defined process. For processes to work, inputs and outputs
must be in balance. If process elements are out of balance, the objectives would not be
achieved and the process would not be effective. The output objective demands certain
inputs and if you don’t have sufficient inputs, the outputs will never be achieved.
18
Needs & Expectations of Interested Parties
The related roles i.e. who performs, who inspects, who approve
and who deliver etc. should be determined for each activity,
according to the assigned role responsibilities are determined e.g.
what is required for performing, inspecting and approving an
activity or set of activities. If the person performing, inspecting or
approving an activity or set of activities can take certain decisions
to ensure conformity of the process, it is called authority related to
the activities.
There are many other inputs to a process (other than the object of the
transformation) that make it possible to complete the transformation. It is
convenient to categorize these inputs as Process Elements. The process
elements can be divided into six groups that contain all the factors that make up
a process.
The six groups are people, equipment, environment, materials, measures, and
methods.
Process outcomes
• Management involvement
• Implementing the monitoring & measurement activities
• Communication & Awareness
• Training
• Change management.
Control of Process
In most cases, it is desirable to control processes to avoid negative
consequences. The amount or level of control varies depending on
the risk and acceptability of undesirable outcomes.
The control on process is established by:
Method
For management to control a process or activity, it must establish a
predetermined method. Without it, there is no basis to adjust or
improve the process. Predetermined methods can include:
International Standards, plans, procedures, work instructions,
checklists, outlines, diagrams, flow charts, step-by-step software
program code, process maps, and so on.
Process Control
Criteria
The essential requirement for any control system is that there is a feedback information
loop from the process output. The feedback information is used to adjust the process or
make decisions about the output (before the next process or before the customer
receives it).
Common cause variation is the variation that exists because of the way the
process was designed (by management) and is managed. It refers to the many
sources of variation that are normally present within a process. For example,
consider how long it takes you to drive to work (assuming your process for doing
so is the same from day to day). Suppose, on average, it takes 20 minutes to get
to work. It doesn't take, however, 20 minutes each day. Suppose you know that,
in general, it will take between 15 minutes and 25 minutes to get to work. Some
days it may take 22 minutes; other days 18 minutes; others 24 minutes, etc.
Process Variation
The difference between each day's time and the average, most of
the time, will not be alarming to you. You realize that the
differences are due to the traffic, speed you drive, etc. All these
causes are called common cause variation. They represent the
normal variation in your process of getting to work.
Special causes of variation are not part of the way the process is managed and
are considered abnormalities. This means that something that normally doesn't
occur has happened. Consider the driving to work example. If you get a flat tire
on the way to work, you will not arrive at work in the normal span of 15 to 25
minutes. This is a special cause. Its effect on the process is measurable.
For example, if you have a flat tire, it might take 60 minutes to get to work. This
is definitely out of the normal range of 15 to 25 minutes and is directly
attributable to having a flat tire. Other possible special causes for driving to work
would include adverse weather conditions and traffic congestion due to an
accident. Special causes are sporadic in nature and cannot be predicted.
However, they are usually easily discovered.
Process Variation
The approach to variation in this case is to look at what variation is due to
common causes and what variation is due to special causes. It is important to
distinguish between the two because the responsibility for process improvement
depends on what type of variation is present. In general, special causes are not
part of the process and can be discovered. It is usually the responsibility of the
front-line personnel to find and eliminate special causes.
Special causes are often related to one machine, one person, one type of raw
material, sudden change in environmental conditions, etc.
Common cause variation, on the other hand, is part of the system or process. To
decrease common cause variation, you must change the system. This is
management's responsibility. Only management, not the front-line personnel,
has the authority to change the system or process.
Monitoring, Measurement, Analysis & Evaluation
Measure the process performance against the determined:
-Sequence - International Standards, Procedures/ Process Maps
-Method – International Standards, Procedures, Process Maps
-And criteria – Inspection and Test Plans, Checklists, Inspection reports
-Objectives – Achievement of objectives
orders enquiry
Order to enquiry No. of orders received Target achievement Evaluation report
Marketing analysis
warranty cost
Warranty costs Cost incurred Actual vs target Warranty cost report
analysis
Qty. planned vs
Works done % of completion meeting the milestones Progress report
achieved
Production
number of hours
Rework hours % of rework Target Reworked hours report
reworked
Improvement
Implement actions
5
Review & Analyze
Effectiveness of
actions taken