Key To Pipeline: Bilge System
Key To Pipeline: Bilge System
SL. NO DESCRIPTION
1 BILGE PUMP
2 FIRE, BILGE AND BALLAST PUMP KEY TO
3 GENERAL SERVICE PUMP PIPELINE
4 EDUCTOR
5 STARBOARD FORWARD BILGE SUCTION
6 PORT FORWARD BILGE SUCTION
7 E.R. AFT CENTRE LINE BILGE SUCTION
8 E.R. AFT BILGE SUCTION
9 BILGE HOLDING TANK
10 OILY WATER SEPARATOR
11 15 PPM MONITORING CELL
12 DISCHARGE TO FIRE LINE
13 EMERGENCY BILGE SUCTION
14 SEA SUCTION
15 OVERBOARD DISCHARGE VALVES
16 TO BILGE OIL TANK
17 TO SHORE CONNECTION ON DECK
18 FROM BILGE PUMP TO BILGE HOLDING TANK
19 DIRECT BILGE SUCTION (S)
16
17 15 6
15
10 12
11
1 2
14
13
Hold
Bilge
8 Valves
14
18
19
9 3
7
24 BILGE SYSTEM
15 5
OBD V/V
THREE-WAY VALVE
OWS
INLET
WASTEOIL
TANK (40 M3)
BILGE HOLDING
TANK(42 M3)
BALLAST SYSTEM
SL. NO DESCRIPTION
1 E.R. BALLAST PUMP - PORT KEY TO
2 E.R. BALLAST PUMP - STARBOARD PIPELINE
3 PUMP ROOM BALLAST PUMP - PORT
4 PUMP ROOM BALLAST PUMP - STARBOARD
5 BALLAST RING MAIN PIPELINE
6 ‘P’ & ‘S’ SIDES OF RING MAIN ISOLATING VALVES
15
1
6 3
6
12
5
14
2
BALLAST SYSTEM
13 4
10
15
8
9
7
TO AND FROM DB TANKS 25
OIL TANKER CARGO PUMPING SYSTEM - ON DECK
7 # 3 TANKS 16 INTERCONNECTION
BETWEEN # 2 & # 3 CARGO
PUMPS
8 # 4 TANKS 17 MANIFOLD
18
14 13 12 15 5
16 8
7 6
17
OIL TANKER CARGO PUMPING SYSTEM - ON DECK
9
6
4 8
5
7 3
FUEL OIL BUNKERING SYSTEM
8 OVERFLOW TANK
9 DB TANK
10 QUICK CLOSING VALVE
1
14 2
10
13
15
7 P
5
12
11
5
6
4
22 T
P
FUEL OIL BUNKERING SYSTEM 1
10
MAIN BUNKER LINES 2
BUNKER SUCTION LINES
9
OVERFLOW LINES 8
Safety arrangements in FUEL OIL BUNKERING SYSTEM:
1. Pressure gauge.
2. Thermometer.
3. Overflow tank.
4. System relief valve.
5. Quick closing valve.
6. All bunker tanks located inside engine room have overflow
arrangement to overflow tank.
7. Flame traps on bunker tank air vents.
8. Marpol sampling line.
20
FUEL OIL TRANSFER SYSTEM
SL. NO DESCRIPTION SL. NO DESCRIPTION
OVERFLOW LINE TO
9 18 TO MAIN ENGINE
OVERFLOW TANK
13
2 14
9
10 6
12 2
11 5
7
2 7
8
8
18
3
4 17
1 15
27 2 16
FUEL OIL TRANSFER SYSTEM
Safety arrangements in Fuel Oil Service System:
1. Quick closing valve ( remote operation)
2. Overflow from Service tank to settling tank
3. Overflow from settling tank to Overflow tank /high level transfer
pump cut-off.
4. Provision of two duplex pumps.
5. Pressure regulating valve.
6
SL. DESCRIPTION
NO
1 SEA CHEST
3 ER HYD.
DRAIN VV
6
8 RELIEF VV.
DRAIN VV
ER HYD. RELIEF VV.
EMERGENCY
FIRE PUMP
2 DUAL PURPOSE PUMPS-FIRE & SEA CHEST
GS/ BILGE & BALLAST/ SW ETC.
FRESH WATER HYDROPHORE SYSTEM
SL. NO DESCRIPTION SL. NO DESCRIPTION
1 FILLING FROM FRESH WATER GEN. 18 DR. WTR. TO ENGINE ROOM
2 FEED WATER TANK 19 CALORIFIER – STEAM / ELECTRIC
3 ‘P’ & ‘S’ F.W. STORAGE TANKS 20 HOT WATER CIRCULATING PUMP
4 FILL. LINE FROM FWG TO F.W. STOR. TKS. 21 HOT WTR. TO E.R.- ME&AE T/C CLNG.ETC.
5 FILLING LINE FROM DECK 22 HOT WTR. TO ACCOMMODATION
6 DRAINS TO BILGES/BILGR TANK 23 HOT WTR. CIRC. LINE RETURN
7 TO HYDROPHORE F.W. P/P’S 24 F.W. TO ACCOMMODATION – SAN./WASH.
8 SUCTION FILTERS 25 TO HOTWELL/CASCADE TANK
9 HYDROPHORE FRESH WATER PUMPS 26 TO MAIN ENGINE EXPANSION TANK
7 8 9 10
20
23
24
25
27 26
6 28
34 29
32 1 30 31
10
FIRE PUMPS ARRANGEMENT
5 7
10
3 6 8
9
2 1
6
5
1
4
3
7
PROCEDURES FOR EVALUATING PUMPS