Lecture On-Importance of Materials Testing
Lecture On-Importance of Materials Testing
MATERIALS TESTING
PHYSICAL CHEMICAL
COURSE OVERVIEW
OBJECTIVES
METHODOLOGIES
PARTICIPANTS
* EVALUATION
* RECOGNITION
Cement
* Compressive Strength
* Specific Gravity
* Fineness
* Determination of Slump
Paints
MODULE IV
• Sampling and Testing of Asphaltic Materials and
Asphalt Mix
Duration : 6 - working days
Asphaltic Materials
* Asphalt Cement
* Emulsified Asphalt
* Cutback Asphalt
Ascertain that all materials incorporated into the works pass the
requirements of DPWH Standard Specifications for Highways,
Bridges and Airports and strictly comply with the schedule of
Minimum Testing Requirements.
Submit test reports and other pertinent quality control reports within
the required time frame.
T. Urmaza
S. Orate CLARITA C. FLORES
J. Tagalo Engine e r V
J. B e rgonio
C. de la Cruz ATTESTED :
Witnessed by:
Const. Of 2 Storey RGR Type Sch. Bldg. At Dona Ma. Platon Laurel, Aya, Talisay, Bats.
Project : Const. Of Circumferential Road Around Lake Taal, Agoncillo, Bats.
Completion of Aya-Tranca-Talisay Road, Talisay, Bats.
Kind of material : Reinforcing Steel Bar ( 16 mm dia., deformed )
Sample identification : DMP- 5
Quantity represented : 10,000 kgs.
Sampled at : Stockpile at jobsite
Original source : Top Steel
Supplied by : Revere Construction & Supply
Proposed use : for concrete reinforcement
Spec's Item No. : PNS 49 Grade 275 NW
Sampled by : F. Opena,Lab. Tech. II DPWH-Bats. 3rd DEO 06-08-06
(Name & designation) (Office) (Date)
Submitted by : Ma. B. M. Marquez - do - 6-14-06
(Name & designation) (Office) (Date Received)
Lab. No. : 1718-06 ( Paid under OR No. 2595342 )
Witnessed by:
(Date)
TEST REPORT ON CONCRETE MASONRY UNITS
Project :
Construction of 2 Storey RGR Type Sch. Bldg. At Dona Ma. Platon Laurel, Aya, Talisay, Bats.
Type of Unit :
Concrete Hollow Blocks (Non Load Bearing) 4" thick
Quantity represented :
10,000 pcs.
Sampled at :
Stockpile at jobsite
Original source :
Allied
Supplied by :
REVERE Construction & Supply
Proposed use :
for walling
Spec's Item No. :
ASTM C-129 ( Non- Load Bearing )
Sampled by :
N. Magnaye Revere Cons't. & Supply 06-08-06
F. Opena,Lab. Tech. II DPWH-Bats. 3rd DEO 06-08-06
(Name & designation) (Office) (Date)
Submitted by : Ma. B. M. Marquez - do - 6-16-06
(Name & designation) (Office) (Date received)
Lab. No. : 1720- 06 ( Paid under OR No. 2595342 )
SAMPLE I.D. TESTS REQUIREMENTS RESULTS
T. Urmaza
A. Emperador CLARITA C. FLORES
J. Tagalo Engine e r V
J. Bergonio ATTESTED:
Witne s s e d by :
Project : Concreting of Road, Barangay II, San Carlos City, Negros Occidental
Sample identification : CRBII-01
Quantity represented : 2000 bags
Sampled at : Jobsite
Manufactured by : Taiheiyo Cement Phils., Inc., San Fernando, Cebu City
Brand : Grand Portland Cement
Supplied by : Kuntel Construction
Spec's Item No. : ASTM C-150
Sampled by : R.dela Cruz/J.Yanson DPWH-Neg. 1st EDO/Kuntel Const. 6-16-06
: (Name & designation) (Office) (Date)
Submitted by : N.A. Noble-Engr. III DPWH-Neg. 1st EDO Neg. Occ. 6-20-06
: (Name & designation) (Office) (Date received)
Lab. No. : 1741-06 (Paid under OR # 2595384)
TESTS REQUIREMENTS RESULTS
Magnesium Oxide (MgO), % 6.0 Max. 1.30
Sulfur Trioxide (SO 3), % 3.0 Max. 2.47
Loss on Ignition, % 3.0 Max. 4.70*
Insoluble Residue, % 0.75 Max. 1.10*
Air Content of Mortar, % 12.0 Max. -
Fineness : Amount Passing
No. 0.075 mm Sieve, % - 99
Autoclave Expansion, % 0.8 Max. 0.03
Time of Setting : Gilmore Test
Initial set, min. 60 Min. 120
Final set, min. 600 Max. 253
Compressive Strength, Avg. mortar
cubes, Mpa:
3 days 12.0 Min. 19.0
7 days 19.0 Min. 17.5
28 days 28.0 Min. 23.0
Specific Gravity - 3.09
REMARKS: * Sample fails to meet Specification requirements.
Tested by: Checked by:
P. Malonzo
B.A. Minano
E. Cruz CLARITA C. FLORES
E. Flores Engineer V
M. S. Gianan ATTESTED :
Witnessed by:
Witne s s e d by:
Selection of Materials
Materials shall be obtained from approved materials sources and should be
known in advance so that the required tests can be made to avoid delays in the
construction due possible rejection of unacceptable properties of materials so
that an approved corrective measures could be immediately implemented to
correct the quality of materials prior to its usage.
Handling and Storage of Materials
Is the process of selecting a part (sample), which will be used to judge the
whole (lot). Sampling of construction materials should be done on the
delivered materials at the project site and not in the place where it was
purchase.
Testing and Inspection in the construction works compliments with each other
and should be done both at the right time as the work progresses.
This practice shows that relationship of personnel in the project are in poor
situation. Construction and Materials personnel have no harmonious relation
and do not cooperate to each other during the implementation of the project.
• Incorporation of Materials into the works without Quality Tests
Construction materials are being incorporated into the works without the
benefit of quality tests.
Testing of materials were not timely done as the work progresses. Testing
are done as only compliance to the requirement of the project for billing
purposes.
Test Reports of materials are not authentic and contains doubtful results.
Materials samples of good quality were taken from good source and not
on the actual delivered materials on site.
Status of monthly test reports are bloated by reporting higher number of test
performed but not yet done just to comply to the required scheduled tests.