Site General Evaccuation Drill: Petrokemya Abs Project
Site General Evaccuation Drill: Petrokemya Abs Project
Area :PK ABS Project Site Area Date and Time of Drill: 25th November 2013 at 04:50 pm
LIST THE OBSERVATIONS AND THE RECOMMENDATION/ CORRECTIVE ACTIONS TO BE ADOPTED AS A RESULT OF THIS
DRILL: (Contributors Al Naba , Sinopec, HAC, Olayan Descon, Tecnicas Reunidas and PMT EHS)
1.0 – Coordination
No. Observation Recommendation Target Date Responsibility Status
1.1 The ambulance arrives at Should be in a much
AL Naba/ Sinopec Site
the scene 7 minutes after lesser time 5 minutes Next Drill Closed
Clinic
they received the call approximate
2.0 – Evacuation response
2.1 There are several people To improve next
who are slow going to the emergency drill Next drill All Closed
muster point .
3.0 – Medical Response
3.1 The medical team Good operation maintain
responded in a timely such response N/A N/A N/A
manner.
5.0 – Others