Machine Ordering Process for Dealers
Best Practices for Order Accuracy
for DBS / DBSi dealers
Asia Pacific Distribution Services
Effective August 2010, Second Edition
MAKING PROGRESS POSSIBLE
MAKING PROGRESS POSSIBLE
Contents
Objectives
Grief-Free Orders
New Machine Order Process
Process Flow Chart
Guided Procedures in DBS/EMS
Caterpillar Contacts
Page 2 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Objectives
This initiative aims to have dealers transmit grief-free
orders to Caterpillar, thus eliminating unnecessary delays
in order processing and ensure accurate specifications are
transmitted.
Resend Orders This is Order Accuracy.
Grief-free Orders CAT Grief-free Orders CAT
Dealers Orders & Plant
Logistics
Grief Orders
Orders processing time for your orders are shorter with order accuracy
Page 3 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Grief-Free Orders
What are grief-free orders?
– Complete Information
All orders information must be completed in full before transmitting
to Caterpillar.
– Accuracy
All orders information must be checked correct before transmitting
to Caterpillar.
Grief-free orders allow minimal intervention to process and release
your orders to the plant for production by your Cat order analysts. It
ensures order is configured and shipped as per customer requirement.
Page 4 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
Before you transmit your orders to Caterpillar, ensure the following
information is in place…
A.Authorized Document Type / Number (Pricing Programs such as SPAR /
FOCUS / RPI)
B.Order Pay Terms Code
C.Dealer Order Type (Differentiated Orders)
D.Compatibility Check
E.Shipping Directions
F.Charge To Dealer Code
G.Ship To Dealer Code
H.Order Notes
I.Port of Entry
J.Port of Exit
K.Complete and Accurate Information
For machines listed as Managed Allocation in the availability report, please
contact your respective Caterpillar Sales Support Consultant before
releasing in EMS.
Page 5 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
A. Authorized Document Type/Number(SPAR/FOCUS/RPI)
Best Practices
1) If Authorized Document Type/Number is AVAILABLE at the time of order.
• Transmit the order to Caterpillar with the document number.
2) If Authorized Document Type/Number is NOT AVAILABLE at the time of order.
• Do not use an invalid code to transmit your order. Leave the field Blank.
• Indicate a note in the Order Notes. Example, “SPAR TO BE ADVISED”
• Refer GCSS or contact Caterpillar Sales Support Consultant to obtain the program
number. Once the program number is available at the later stage, use CMOPS
Order Change function (MNTEMCOR) to include it in the order.
3) Authorized Document Type to be used.
• “2” RPI e.g. APDxxxxxx or Wxxxxxxx
• “5” Focus/Core Program e.g. TAxxxxxx or COxxxxxxx
• “5” OTO e.g. OTO that start with Gxxxxx or OTxxxxxx
• “8” SPAR e.g. APxxxxxxxx (the last 6 digits are always number)
* Codes can be setup in MNTSCTAB
Page 6 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
A. Authorized Document Type (SPAR/FOCUS/RPI)
Remember…
1) If your order is under a pricing program and is available at time of order release,
be sure to enter the valid program number before transmitting the order to
Caterpillar else the order change charges may apply.
2) If program number is not available, leave the field blank. Do not transmit your
orders to Caterpillar with an invalid program number. Example “TBA” or “As per
John Doe”. Indicate a note in the Order Notes. Example “SPAR TO BE
ADVISED”.
3) Do not enter expired or invalid program number in the order.
4) Once you have obtained the program number or authorization code, use the
CMOPS Order Change (MNTEMCOR) in EMS and transmit to Cat. Your CAT
order analyst will be informed of the new addition
5) Global Commercial Support System (GCSS) DOES not eliminate the
procedures stated above
Page 7 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
A. Authorized Document Type/ Number (SPAR/FOCUS/RPI)
Select the type of pricing
Auth Doc Number program.
(SPAR, FOCUS, RPI)
Page 8 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
B. Order Pay Terms Code
Best Practices
1. If Order is under Standard Payment term.
Transmit the order to Caterpillar with the standard payment term code.
If you are not aware of the Standard Payment term code, contact
Caterpillar District or Finance Rep for instructions.
2. If Order is under Special (deferred) Payment term.
If Special Pay Terms Code is AVAILABLE at the time of order - Transmit
the order to Caterpillar with the valid special pay term code.
If Special Pay Terms Code is NOT AVAILABLE at the time of order –
Use the Standard Payment term code to enter the order
Do not use an invalid code to transmit your order to Caterpillar
Indicate a note in the Order Notes. Example, “SPECIAL ORDER PAY
TERMS CODE TO BE ADVISED LATER”
Contact Caterpillar district finance rep to obtain the order pay term code.
Once the code is available at the later stage, use CMOPS Order Change
function (MNTEMCOR) to include it in the order.
Page 9 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
B. Order Pay Terms Code
Remember…
1) Use the CMOPS Order Change Function (MNTEMCOR) to amend
the Order Pay Terms Code at the later stage if you need to change
from a Standard Payment Term to a Special Payment Term.
2) Indicate a note in the Order Notes. Example, “SPECIAL ORDER
PAY TERMS CODE TO BE ADVISED”
3) Do not enter invalid information (e.g. 45 days, etc) other than the
term code provided. If unsure of payment code, please approach
your Caterpillar Finance Rep.
4) Do not enter payment term code which has expired.
5) Payment Term Code is always a combination of a 5 digit Alfa-
Numeric format (e.g AZZVZ, AZZ30, etc)
Page 10 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
B. Order Pay Terms Code
Order Pay Terms Code
in alpha numeric
Page 11 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
C. Dealer Order Type (Differentiated Orders)
Best Practices
1) Understand the use of the order type codes:
– C = Customer
– I = Inventory
– R = Rental Replenishment
2) Use order type “C” only when you have confirmed customer
commitments.
3) If you need to change the customer in a “C” order after transmission
to Caterpillar, use CMOPS Order Change (MNTEMCOR) function to
make the change and transmit the change to Caterpillar.
Remember…
1) Do not leave the Dealer Order Type field blank for your orders.
Contact your EMS consultant if you need any assistance.
Page 12 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
C. Dealer Order Type (Differentiated Orders)
Dealer Order Type
Page 13 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
D. Compatibility Check
Best Practices
1) Price Update Job (EMJN5100S followed by EMJN5105A) in EMS
must be run daily. Contact your IT Department to set it up.
2) Do not use Aged Configurations to configure new orders.
3) If you encounter compatibility errors, please check with your
application or engineering team for verification.
Always refer to the web price list for resolving compatibility errors or
pricing changes. The price list is located at:
http://esl.cis.cat.com/multimedia.nsf/$$ESLDocument
4) If the compatibility error remains unsolved despite best effort,
contact your respective APD Product Specialist or Orders Account
coordinator for assistance
Remember…
Do not transmit grief order to Caterpillar if you have not perform the
necessary steps above.
Page 14 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
D. Compatibility Check (Aged Configurations)
The highlight indicates
there might be
something wrong for
this reference number.
This message indicates
that you have out-dated
reference numbers in
your configuration.
Page 15 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
D. Compatibility Check
Resolve the error by :
A. Run the latest price
update job daily
B. Avoid using aged
templates to
configure and
submit orders.
C. Getting your
application or
engineering team to
review again.
Please refer to this document
D. Refer to the web for more information on Error
price list for Codes.
configuring
instructions.
Page 16 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
E. Shipping Directions – Ship before /Ship After/Required Delivery Date
Best Practices
1) For lane 1 orders, ‘ship before’/’ship after’ will be ignored
2) For non-lane 1 orders, ‘ship before’ will be ignored even if it is present, and
‘ship after’ is only allowed for Customer order (order type C)
3) ‘Required Delivery’ date is not used.
Page 17 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
F. Charge To Dealer Code
Best Practices
1) Ensure this field is populated correctly with your dealer buyer code
(dealer code).
2) Please contact your CAT order analyst if you are unsure of which code
to use in the order.
Remember…
1) Do not use the wrong dealer code for your orders.
2) Note that in DBS, the dealer code is defaulted in the field.
Page 18 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
F. Charge To Dealer Code
Charge To Dealer Code
Page 19 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
G. Ship To Dealer Code
Best Practices
1) Please use the appropriate dealer code in the Ship To Dealer Code
field when you wish to ship the equipment to an alternate location.
2) Therefore, the Charge To Dealer code and Ship To Dealer code may
not always be the same.
3) Please contact your CAT order analyst if you are unsure of which code
to use in the order.
Remember…
1) Do not use the wrong dealer code for your Ship To Dealer Code field.
2) Note that in DBS, the dealer code is defaulted in the field. Please
remember to change the code if you wish to ship to an alternate
location.
Page 20 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
G. Ship To Dealer Code
Ship To Dealer Code
Page 21 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
H. Order Notes
Best Practices
User Order Notes to indicate:
1) Any special ordering and shipping instructions
2) Freight quotations to be applied (e.g. CAPL-XXXXXX). If quote has
expired, please request for a revised freight quote from your CAT
Logistics Analyst.
Page 22 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
H. Order Notes
Remember…
1) Do not include conflicting or contradicting information in the order notes
against the information entered in the fields.
2) Information stated in the Order Notes should match with the
information entered in the fields.
3) Mandatory information to be indicated in Order Notes:
Pricing Program if still pending
Order Pay Terms Code if still pending
Freight Quotation Number if applicable
Page 23 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
H. Order Notes
Advise your Pricing
Program status and
Freight Quotation Order Pay Terms Code
Number must be status
included if any.
Page 24 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
I. Export/Import Booking - Port of Entry Code
Best Practices
1) You are required to key in the Port of Entry codes. Please refer to the page
on Port of Entry Codes to obtain the port codes:
http://www.unece.org/cefact/locode/service/location.htm
Page 25 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
I. Export/Import Booking - Port of Entry Code
Remember…
1) Do not leave the Port of Entry field blank for your orders
2) There should not be any spaces in the codes.
For example, a port code in Singapore should be entered as
“SGSIN” instead of “SG SIN”.
Page 26 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
I. Export/Import Booking - Port of Entry Code
Port of Entry codes field
can be maintained via here.
Page 27 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
I. Export/Import Booking - Port of Entry Code
Port of Entry Code field
Page 28 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
J. Export/Import Booking - Port of Exit Code
Best Practices
1) Leave the Port of Exit empty. Caterpillar will default The Port of Exit
code for your order based on Origin of Goods of the machine.
2) In special situations when order needs to be shipped from a
designated Port of Exit, please contact your respective Cat Order
Analyst separately to determine the feasibility.
Page 29 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
J. Port of Exit Code
Port of Exit Code field
Page 30 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
New Machine Order Process
K. Complete and Accurate Information
Best Practices – Which is more efficient?
1) Time spent in obtaining complete and accurate order
information before transmitting to Caterpillar…
is more efficient than…
2) Transmitting non-complete and inaccurate order information to
Caterpillar which may delay the orders by up to 2 weeks.
Page 31 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Page 32 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
EMMENU - MNTEMORD
Page 33 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
1. Basic Order A = Merchandising Programs
B = Order Pay Terms Code
B
A
Page 34 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
1. Basic Order C = Dealer Order Type
(Differentiated Orders)
Page 35 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
1. Basic Order D = Compatibility Check
Page 36 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
2. Shipping Directions E = Freight & Routing Code F = Charge To Dealer Code
G = Ship To Dealer Code
E
E
E
Page 37 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
3. Order Notes H = Order Notes
Page 38 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Guided Procedures
5. Export/Import Booking J = Port Of Exit
I = Port Of Entry
Page 39 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
Caterpillar Contacts
Matters Region Name Contact No.
By Request Form Only
CMOPS/Web- APD Orders Helpdesk Services
All
MOCS Issues APD_Orders_ [email protected]
APDNet business tools
Orders & Processes
orders account information
Other Orders Issues All Caterpillar Order Analyst for dealers
https://apdnet.cat.com/cda/l
ayout?m=7860&x=7
Orders & Logistics – Desmond Chng
All +65-68287-283
Freight Issues
[email protected] Payment terms All Caterpillar District Finance Rep.
Caterpillar Machine Sales Support
SPAR/FOCUS All
Consultant
Page 40 CATERPILLAR CONFIDENTIAL: YELLOW
MAKING PROGRESS POSSIBLE
This presentation material is available here:
https://apdnet.cat.com/cda/layout?m=18486
1&x=7&mode
Page 41 CATERPILLAR CONFIDENTIAL: YELLOW