Value Engineering
Value Engineering
INDUSTRIAL ENGINEERING
Value Engineering
What is value engineering?
Value Engineering (VE) is an organized effort directed
at optimizing a products relationship between its
functional need(s) and the cost(s) to meet that need
while meeting or exceeding quality requirements.
It is a formal attempt to assure the highest value of a
product by delivering all required functions at the
lowest overall cost
value = function/cost
In easy words, value is different things to different people.
Designer equates it to the reliability, purchaser to price of
the item, and production person to the cost of
manufacture.
Types of values:
Cost value- sum of all costs occurred in manufacturing
Exchange value- measure of all the properties, and
features of the product possible of trading with other
products
Use value- constitutes the amount of its cost included to
make the product work
Esteem value- amount of cost included into the product
to enhance its appeal
E.g.- a car bumper has less use value and high esteem
value ,however ,a gudgeon pin has high use value but
low esteem value.
Showing application of VE
(against SCRUM)
Why to apply VE
(VE versus Other Cost Reduction Techniques)
Generally, traditional tech. are post-production oriented as
against VE which is applied at design stage
Other techniques try to reduce cost from existing processes
,whereas VE never considers any process as it is function
oriented
VE gives 30-40% cost reduction as against 10-15% by
other conventional methods
The cost reduction is cost based i.e. it tries to reduce cost in
any manner, but in VE function has to be maintained so
product is obtained at lowest cost without sacrificing its
quality and performance
Selection of product
(factors influencing selection and justification)
Justification
There must not be any major changes in product or
item under study during study period
The proposed changes are likely to be implemented
Components are large in number(quantity or cost)
Functions in Value
engineering
Function is that part of value engineering which
has to be maintained while minimizing cost. So,
function provides us with constraints for VE.
There are two types :
Primary function-is the basic purpose for which
the product exists .i.e. the basic function of a pen is
to communicate the idea.
Secondary function-is the one that supports
primary function.
Alternative Solutions
1. Speculation
The objective here is to generate alternative ways of
achieving functions defined in the previous step
Done by the process of brain storming
2. Evaluation of alternatives
The various alternatives listed in speculation phase are
developed and examined for practicability and relative cost
In case of doubts, appropriate expert is to be consulted. The
detailed alternatives are to be developed taking into
consideration the investment in tooling, savings, etc.
3. Presentation of alternatives
At this stage one or possibly two alternatives will
remain. The outcome of the team findings is
presented to line management to decide the best
way to use line results of these exercises.
Principles of VE
Do not use a part that does not contribute to the
value of the product
Do not chose a part whose cost is not proportional
to its usefulness
Accept the change only if the quality is maintained
Use standards wherever possible
Use the material part best suited for the purpose
Purchase must be done if necessary instead of inhouse manufacturing
Bibliography
Industrial engineering, by Martand Telsang
Chand publication )
Wikipedia.com
Youtube.com
( S.