Project Management
Project Management
Project Management
Operations Management
William J. Stevenson
8th edition
17-2
Project Management
CHAPTER
17
Project
Management
McGraw-Hill/Irwin
17-3
Project Management
INTRODUCTION
17-4
Project Management
17-5
Project Management
PHILOSOPHICAL FOUNDATIONS OF
PERT & CPM
17-6
Project Management
17-7
Project Management
1.
2.
3.
17-8
Project Management
5.
17-9
Project Management
Project Management
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
MILESTONE CHART
Task 1
Task 2
Task 3
Task 4
Figure 2
PERT NETWORK
Task 1
Task 2
Task 3
Task 4
Figure 3
CPM
Activity time estimates are probabilistic three Activity times are deterministic. A single
different time estimates, based on the
time estimate is made for each activity.
concept of probability of completing the
activity are made for each activity.
Activity costs are not explicitly provided.
PERT
PERT
As PERT is a probalistic model; and factor of
uncertainties involved in the time required to complete
work activities.
PERTs originator decided three different time estimates:
Figure 17.8
to
Activity
start
Optimistic
time
tm
te
Most likely
time (mode)
tp
Pessimistic
time
Activity-on-arrow (AOA)
Activity-on-node (AON)
Activities
Events
NETWORK CONVENTIONS
Network Conventions
a
c
c
b
c
Dummy
activity
Path
Critical path
Critical activities
Slack
Variance
2
(t
t
)
p o
36
= variance
to = optimistic time
tp = pessimistic time
Activities
A Determine equipment needs
B Obtain vendor proposals
Immediate Predecessors
C Select vendor
A, B
D Order system
F Layout warehouse
H Interface computer
I Install system
D, F, G
D, F
K Test system
I, J
17-32 Project
Management
Table
17.2:
Activity
Optimistic a
Most Probable m
Pessimistic b
11
12
10
10
Variance 2
Activity
.11
1.78
.11
1.78
.44
.11
1.78
.11
1.78
.11
.11
Activity
Earliest
Start
Earliest
Finish
Latest
Start
Latest
Finish
Slack
(LS-ES)
Critical
Path
13
15
12
12
12
15
12
15
11
11
15
15
18
15
18
15
19
16
20
18
20
18
20
20
22
20
22
Activity
Earliest Start
Time
A [0, 3]
3
Earliest Finish
Time
Expected Activity
Time
35
Figure
17.8: R.C. Coleman Project with
17-36 Project Management
Latest Start and Latest Finish Times in
Parentheses
AOA
Locate
facilities
Order
furniture
4
Furniture
setup
2
Remodel
Interview
Hire and
train
Move
in
AON
Locate
facilities
Furniture
setup
Move
in
Remodel
S
Interview
Hire and
train
Time Estimates
Deterministic
Probabilistic
Example 1
Figure 17.5
8 weeks
ate s
c
Lo ilitie
fac
er e
d
r
O
tu r
i
n
fu r
Rem
od e
l
11 weeks
re
n i tu
Fur p
u
set
Deterministic
time estimates
6 weeks
3 weeks
In
te
rv
i
4 weeks ew
in
a
r
t
nd
a
re
Hi
9 weeks
Move
in
1 week
Example 1 Solution
Critical Path
P a th
L e n g th
S la c k
(w e e k s )
1 -2 -3 -4 -5 -6
1 -2 -5 -6
1 -3 -5 -6
18
20
14
2
0
6
Computing Algorithm
Network activities
ES: early start
EF: early finish
LS: late start
LF: late finish
Used to determine
Expected project duration
Slack time
Critical path
Example 5
Optimistic
time
2-4-6
b
3-5-7
e
6
32- g
4-6-8
h
Pessimistic
time
5
32- c
4
3
1a
3-4-5
d
Most likely
time
5-7-9
f
-6
4
3- i
Path Probabilities
Z =
Example 6
17
Weeks
1.00
a-b-c
Weeks
10.0
d-e-f
16.0
Weeks
1.00
g-h-i
13.5
Weeks
Figure 17.11
Total
cost
Expected indirect costs
Shorten
CRASH
Cumulative
cost of
crashing
Shorten
Optimum
Example 7
10
2
f
9
4
d
Advantages of PERT
Identifies
Critical activities
Slack activities
1
Limitations of PERT
4
2
142 weeks
3
CA Super Project
Harvard Total Manager
MS Project
Sure Track Project Manager
Time Line
Advantages of PM Software
Imposes a methodology
Delays
Increased costs
Project termination
Risk Management
57
58
60
61
(A1)
63
64
65
= 1.66
weeks
T
22
Expected Completion Time (22
Weeks)
=
1.66
(Prob.
T<25)
0.5
0.4649
22
Time (Weeks)
25
68
69
0.45
0.5
0.05
1.64
te = 22
Tim
e
QUESTION 1
Given the information provided in the
accompanying network diagram, determine each of
the following:
a.The length of each path;
b.The critical path;
c.The expected length of the project;
d.Amount of slack time for each path;
e.Compute activity slack times for the precedence
diagram
72
73
Activity
Earliest Start
Time
A [0, 3]
3
Earliest Finish
Time
Expected Activity
Time
74
75
76
78
79
(A1)
81
82
83
= 1.66
weeks
T
22
Expected Completion Time (22
Weeks)
=
1.66
(Prob.
T<25)
0.5
0.4649
22
Time (Weeks)
25
86
87
0.45
0.5
0.05
1.64
te = 22
Tim
e
89
90
91
93
QUESTION 2
The network diagram for a project is shown in the
accompanying figure, with three time estimates for
each activity. Activity times are in months. Do the
following:
a.Compute the expected time for each activity and the
expected duration for each path;
b.Identify the critical path;
c.Compute the variance for each activity and the
variance for each path;
d.Find the probability that the project will be completed
within 17 months of its start;
QUESTION 2
e.
f.
g.
h.
The
Normal
Crash
1-3-6
45
30
1-2-5-6
42
32
1-2-4-5-6
44
34
Crash
Effort
Cost
Normal
Effort
Time
FIRST CRASH
Start our analysis with the normal critical path.
There are only two uncrashed activities on the
normal critical path (i.e.; 1-3 and 3-6);
Activity 1-3 is the least expensive activity
($200/week), and hence crash it by 5 weeks. (see
transparency). This reduces path 1-3-6 to 40
weeks and changes the critical path to (1-2-4-5-6)
44 weeks.
SECOND CRASH
There are four uncrashed activities on (1-2-4-5-6)
the new critical path i.e.; (1-2, 2-4, 4-5, & 5-6).
Of these activity 1-2 is the least expensive (i.e.;
$200/week); (see transparency). Hence we crash it
by 3 weeks.
The critical path is still 1-2-4-5-6; but it has
decreased to 41 weeks.
THIRD CRASH
There are three uncrashed activities on the current
critical path (2-4, 4-5 and 5-6).
Of these activities 2-4 and 5-6 are least expensive
$400/week). We can crash any of them; however,
we crash activity 5-6 as it yields a larger reduction
in completion time (3 weeks). As shown in table.
This changes the critical path to 1-3-6 (40 weeks).
FOURTH CRASH
There is only one uncrashed activity (i.e.; 3-6) the
current critical path. We crash it by 10 weeks (as
shown in the transparency) and the critical path is
again 1-2-4-5 (38 weeks).
Of these activities 2-4 and 5-6 are least expensive
$400/week). We can crash any of them; however,
we crash activity 5-6 as it yields a larger reduction
in completion time (3 weeks). As shown in table.
This changes the critical path to 1-3-6 (40 weeks).
FIFTH CRASH
SIXTH CRASH
SEVENTH CRASH
3)
4)
i.
ii.
Activity
Normal
Crash
Cost ($)
1-2
1600
1-3
10
3000
2-4
2600
2-5
18 weeks total
4900
3-6
24 weeks total
8640
4-5
12
6000
5-6
4500