Example Presentation APVO

The document summarizes the proceedings of an APVO Committee meeting held on July 9th, 2015 to discuss proposed construction and infrastructure works for a mixed development project in Mukim Labu, Negeri Sembilan. It includes details of the developer, consultants, contractor and 11 proposed variation orders to the original project scope and budget. Key aspects discussed are the extension of completion timelines, percentage changes to the contract sum due to the variation orders, and status of claims and payments made to date.

Uploaded by

Abd Aziz Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
521 views

Example Presentation APVO

The document summarizes the proceedings of an APVO Committee meeting held on July 9th, 2015 to discuss proposed construction and infrastructure works for a mixed development project in Mukim Labu, Negeri Sembilan. It includes details of the developer, consultants, contractor and 11 proposed variation orders to the original project scope and budget. Key aspects discussed are the extension of completion timelines, percentage changes to the contract sum due to the variation orders, and status of claims and payments made to date.

Uploaded by

Abd Aziz Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 25

APVO COMMITTEE MEETING

DATE : 9th JULY 2015

PROPOSED CONSTRUCTION AND COMPLETION OF INFRASTRUCTURE


WORKS (PHASE 2 & 9) FOR PROPOSED MIX DEVELOPMENT (RESIDENTIAL
AND COMMERCIAL) ON LOT 32827, 32828, 2774, 2163, 1545 AND
INCLUSIVE OF GOVERNMENT LAND OF 2.84 ACRES (ROAD RESERVE),
MUKIM LABU, DAERAH SEREMBAN, NEGERI SEMBILAN DARUL KHUSUS.
DEVELOPER:
SIME DARBY AINSDALE DEVELOPMENT SDN BHD
10th Floor, Block G, No 2, Jalan PJU 1A/7A, Ara Damansara
47301 Petaling Jaya, Selangor Darul Ehsan

CONSULTANT :
MOHD ASBI & ASSOCIATES
D9-08, Dana 1 Commercial Centre, Jalan PJU 1A/46
47301 Petaling Jaya, Selangor Darul Ehsan

MECHANICAL & ELECTRICAL CONSULTANT :


PE ASSOCIATES SDN BHD
No 23-1, Jalan Seri Sentosa 8A, Taman Seri Sentosa,
58000 Kuala Lumpur
CONTRACTOR:
PEMBINAAN TETAP TEGUH SDN BHD
2nd Floor, Wisma Mainstay,
Jalan Diplomatik, Presint 15,
C-08-02, Block C, Level 8, 62050 Putrajaya.

PROJECT DETAIL
Contract Sum

RM

Original Date of Site Possession


Revised Date of Site Possession
Original Date of Completion
Revised Date of Completion
Revised Date Of Completion ( EOT
No. 3)

11st February 2014


05th May 2014

Contract Period

34 weeks

Liquidated Ascertain Damages (LAD)

RM

Defect Liability Period

18 months

Performance Bond

RM (Expiry Date : 21st June 2016 )

Insurance
Contractor All Risk Policy

Workmen Compensation Policy

Extension of Time
a) No. 1
b) No.2
c) No.3

07th October 2014


29th December 2014
7th Aug 2015

Policy No: ECER-E0031808-BR


Sum insured: RM
Expiry date: 07/10/2014 & Renew until 7/8/2015
Maintenance period: 18 month + 3 month + 14 days
Policy No: WWC-W0113879-BR
Sum insured: RM
Expiry date: 07/10/2014 & Renew until 7/8/2015
30th December 2014 31st March 2015 (92 days)
1st April 2015 8th June 2015 (69 days)
9th June 2015 7th Aug 2015 ( 60 days)

PROJECT COST SUMMARY


Item

APVO Amount
(RM)

Description

Original Contract Sum

Approved APVO No. 1 - 6

New APVO No. 7 - 10

Amount (RM)

Additional
-

Omission
4

Total Variation Order

Percentage of Variation Order

APVO Grand Total :


Percentage of Variation Order :

?
?%

Revised Contract Sum

AUTHORIZATION TO PROCEED WITH VARIATION ORDER TRACKING


APV
O

Description

No.
7

Mackintosh Probe &


Construct RC wall
base at phase 15C
area

Construction of the
road at PLUS area.

Construction of Brick
& R.C Retaining Wall
at at Phase 2A area.

10

11

Construction of SBend for Box Culvert


Crossing at Jalan
Persiaran Ainsdale
Barat.
Horizontal Directional
Drilling works
crossing PLUS
Highway for TNB
33KV/11kV and
Telecommunication.

Requested
/ Proposed
by

Reason of APVO

To constructs the
Consultant retaning wall base due to
soil condition.
Consultant

To get the left in/out from


PLUS highway to Bandar
Ainsdale.

To split the vertical level


Consultant between Jalan Ainsdale
1/2 & Jalan Ainsdale
Barat with Phase 2A.
Consultant

S-Bend for Culvert


Crossing as required by
SAINS.

Instruction from P.E.A to


using Horizontal
Consultant
Directional Drilling
Method for Highway
Crossing Works
TOTAL OF APVO

Rate
Contract
and
Agreed
Rate
Contract
and
Agreed
Rate
Contract
Rate

Agreed
Rate

Agreed
Rate

Contracto Consultant
Amount
r
Recommenda
Recommend
Quotation tion
ed (RM)
(RM)
(RM)

KEY AND LOCATION PLAN

OVERALL LAYOUT PLAN

PHASE 9

PHASE 2
PHASE 2

PHASE 9

APVO 7. MACKINTOSH PROBE & HARDCORE


UNDER R.C WALL
Mackintosh Probe &
300mm hardcore under
R.C Wall.

Mackintosh probe & R.C Wall


Location at Phase 15C.

APVO 7. MACKINTOSH PROBE & HARDCORE


UNDER R.C WALL

Reinforced Concrete Wall Details


with 300mm thk. Hardcore

APVO 7. MACKINTOSH PROBE & HARDCORE


UNDER R.C WALL

R.C Wall

APVO 8. CONSTRUCTION OF ROAD AND


RELATED WORKS AT PLUS AREA.
Left In/Out from PLUS
Highway
to Bandar Ainsdales

Soil Nailing & R.C


Wall
For Slope Treatment

Left In/Out from PLUS


Highway
to Bandar Ainsdales Petrol
Station and Phase 15C
Left In/Out For Road Layout Plan at PLUS Highway Area

APVO 8. CONSTRUCTION OF ROAD AND


RELATED WORKS AT PLUS AREA.

Typical Details of PLUS Slope Treatment (R.C Wall and Soil Nailing)

APVO 8. CONSTRUCTION OF ROAD AND


RELATED WORKS AT PLUS AREA.

Left In/Out from PLUS Highway to Bandar Ainsdales

APVO 8. CONSTRUCTION OF ROAD AND


RELATED WORKS AT PLUS AREA.

Left In/Out from PLUS Highway to Bandar Ainsdales Petrol Station and Phase
15C

APVO 8. CONSTRUCTION OF ROAD AND


RELATED WORKS AT PLUS AREA.

Soil Nailing & R.C Wall For Slope Treatment

APVO 9. R.C WALL AND BRICK WALL AT PHASE


2A AREA
PERSIARAN AINSDALE UTAMA

Brick Wall
R.C Wall

SD
A
L
E 2 /1

B
LE
DA
IN S
NA
RA
SI A
AT
AR

R.C Wall and Brick Wall Layout Plan At Phase 2A Area

JLN
AIN

R
PE

PHASE 2A

APVO 9. R.C WALL AND BRICK WALL AT PHASE


2A AREA

R.C Wall Detail

APVO 9. R.C WALL AND BRICK WALL AT PHASE


2A AREA

Typical Brick Wall With P.C Block Drain at Phase 2A Area

APVO 9. R.C WALL AND BRICK WALL AT PHASE


2A AREA

R.C Wall at Phase 2A Area and Persiaran Ainsdale Barat

APVO 9. R.C WALL AND BRICK WALL AT PHASE


2A AREA

Brick Wall at Phase 2A area and Jalan Ainsdale 2/1

APVO 10. WATER PIPE S-BEND FOR CULVERT


CROSSING
R
PE
LE
DA
IN S
NA
T
RA
SIA BARA

Water Pipe SBend

PHASE 2A

Proposed Water Pipe S-Bend as Required by SAINS

APVO 10. WATER PIPE S-BEND FOR CULVERT


CROSSING

Water Pipe To be Provided with S-Bend

APVO 11. HDD WORKS CROSSING PLUS


HIGHWAY FOR TNB & TELECOMMUNICATION
INFRAWORKS
Y
WA
I GH
SH
PL U

TNB 33KV Cable


Line
TNB 11KV Cable
Line

Symphonet Ducting

Horizontal Directional Drilling works crossing PLUS Highway for TNB


33KV/11kV and Telecommunication.

STATUS OF CLAIMS AND PAYMENT


Claim
No.

Claimed
Month Amount
( RM)

Aug. 14

Oct. 14

Dec. 14

March'15

Apr' 15

June'15

Date
Claimed

Amount
Certificate
(RM)

Amount
Paid (RM)

Date Paid

24

THANK YOU