1.040/1.401/ESD.
018
Project Management
Lecture 17
Project Quality Reviews &
Audits
Spring 2007
Sam
Sam Labi and Fred Moavenzadeh
Massachusetts Institute of Technology
Recall: The 5 Phases of Project
Management
FEASIBILITY
Finance
Evaluation
DESIGN,
PLANNING
Organization
Estimation
Planning
DEVELOPMENT
Monitoring & Control
Project Aberrations
Changes & Claims
Quality & Reviews, & Audits
CLOSEOUT
OPERATIONS
This Lecture
Contents of this Lecture
Quality Performance What are the issues?
Project Reviews
Project Audits What are they?
Quality Performance What are the
Issues?
Who cares? Also, is QP influenced by construction method?
Interrelationships between Quality and the other performance
metrics (Time, Cost)
Quality Control
Quality Assurance
Quality Management
Total Quality Management (TQM)
Note: In recent years increasing focus on Quality, particularly on
federal contracts
4
Project Quality Who
Cares?
Owner
Resident Project Representative
Architects superintendent
Manufacturers
Prefabrication factory inspector
Utility companies
Site inspectors
Project Developer/Contractor
Field manager
Quality manager
Foremen
Other Stakeholders
The general public (or its reps) e.g., Local building department (code compliance)
Safety and health inspectors (U.S. OSHA)
Insurance company inspectors
Financial institution inspectors
How is Quality Related to Construction
Method 1 - Product may be produced
Method?
elsewhere and then brought to site,
Prefab factory
2
Source: Matthew Norman
or Method 2 - product
may be produced at the Site
Source: brian moriarty
So, Is Product Quality Related to Construction
Method?
Many ways of classifying construction methods.
One way is whether Projects physical component are
- created on site (concrete cast in-situ) OR
- created elsewhere and brought to site (precast concrete)
Pre-fabricated components: generally higher quality
Tighter tolerances
Manufactured under tightly-controlled conditions
More rigorous quality control mechanisms
Shortcoming: Longer delay if identify problems!
Site-created components: generally lower quality
Vulnerable to Weather effects, relaxed adherence to standards, etc.
Quality Inspections of Externally-produced
Components
Inspection may occur at the source (factory) or after they are
delivered at the site.
Examples of external sites
Precast concrete plants
Steel plate fabrication plants
Concrete production plants
Welded steel plants
Large, specialized pieces of equipment
Quality checks at external fabrication site OR at project site can
be carried out by Owner (or his rep), or the Contractor
May also monitor product quality DURING transport of the
product
9
Quality Control vs. Quality Assurance: Whats the
Difference?
10
Quality Control vs. Quality Assurance: Whats the
Difference?
Analogy: You Driving on a Freeway
11
Quality Control vs. Quality Assurance: Whats the
Difference?
Analogy: You Driving on a
Freeway
Driving Quality Assurance
Before Driving: adjust seats, mirrors, temp, etc.
During Driving:
Occasional glances at:
- speed gage to ensure speed is not excessive
- side mirror before changing lane
- road sides to read road signs, etc.
No distractive activities (reading, eating, etc.)
These are
preventive
measures
12
Quality Control vs. Quality Assurance: Whats the
Difference?
Analogy: You Driving on a
Freeway
Driving Quality Assurance
Before Driving: adjust seats, mirrors, temp, etc.
During Driving:
Occasional glances at:
- speed gage to ensure speed is not excessive
- side mirror before changing lane
- road sides to read road signs, etc.
No distractive activities (reading, eating, etc.)
During and After Driving: Generate/report data to prove
that necessary precautions were taken and that your
driving did not violate any rules
Driving Quality Control
Swerving to avoid deer crossing the highway
Steering to right if car is straying into left lane
Braking to avoid hitting slowed car in front
These are
corrective
13
Quality Control vs. Quality Assurance: Whats the
Difference?
Quality Assurance- Do it right the first time". Preventive Quality checks.
Quality Control: Fix it when ever it goes or is going wrong
But note!
In recent years, QA is defined to include QC
Newer Definition of QA:
The acts of (i) establishing that product is being delivered according to all specifications,
(2) providing evidence needed to establish confidence that all quality-related activities are
being performed effectively
- Includes that part of project monitoring that covers project quality.
- Covers all activities from design, development, production, installation, servicing and
documentation
- Includes regulation of the quality of raw materials, assemblies, products and
components; services
14
Quality Control vs. Quality Assurance: Whats the
Difference?
Important
Exact definitions of QA-QC may vary from
industry to industry,
agency to agency,
country to country.
15
The Relationships:
Quality Control, Quality Assurance, Project
Monitoring
Project
Monito
ring
Monitoring of other
project
performance
metrics
Quality
Assuranc
e
(time,
money,
etc.)
Monitorin
g of
project
quality
Qualit
y
Contro
l
16
More on Quality Assurance (QA)
Involves regular but random testing of materials and
workmanship (time-based or work-based intervals)
Prevent, identify, and correct quality-related problems
During the production process, QA instructors mostly
provide guidance and leadership to the production
people rather than criticizing their work
17
More on Quality Control (QC)
QC mostly carried out by Contractor, but
the Owners rep. may draw Contractors attention to carry out QC at any
time. Owner also can have his independent testing.
When the QC Division and Production Division belong to same organization,
these parties often have adversarial relationships
The production people often tend to cover and hide their mistakes by nature.
During/after every project activity, Contractor provides Owner with
documentation that the product complies with specifications
18
What is Quality Management?
Initiated and orchestrated by senior managers
Involves all parts of the organization (main C, sub-C, suppliers, etc.)
Through a systematic, comprehensive and well-documented QA process
Rationale: Improved QA serves to enhance all other performance metrics of
the project (time, cost, etc.) in long run
Objective: A zero-defects product
Technique: Preventive as well as corrective -- Ensure quality NOT ONLY by
rejecting failures but ALSO by investigating possible risks and threats to quality
at root sources
19
What is Total Quality Management
(TQM)?
Not just an operational strategy for PM A PM
philosophy
Aimed at continuous improvement of the organization
and personal growth of its individual members
Ensures that the environment surrounding the Product
is viewed in the broadest sense including:
- Quality of Life
- Well-being and satisfaction of all people Involved
- Long-lasting relationships with customers and suppliers etc.
20
Linkages b/n Quality and Key Performance
Tradeoffs
Metrics
Acceleration $(Overtime, shift
work, Rework, higher-end equipment,
better crews etc.)
Need for rework imposes
high expenses
High quality needs can lead
to costly miscalculations
on labor time
Slow progress $
Delayed occupation,
Trying to save $
Higher interest on
Can lead to substitution,
const. loan
lower quality
Loss of tenants
workmanship
Less $ Low progress
Opportunity cost
Resource reduction
Selection of poor quality workers
Default of contractor/subs
Time
Quality level impacts speed of work,
Level of rework
Quality
Quality problems may result from
overtime, shift work, new hires
21
Project
Reviews
Going back to examine the product from the project.
- Has product (or part thereof) been produced?
- When was it done? punctual?
- Was it done right?
- With the needed resources? Within the given time?
Reviews enable us to learn from mistakes as well as successes.
Models used in PM should also be reviewed for their efficacies
Example CPM, WBS/OBS/CBS, fishbone, etc.
Project reviews may be carried out by external parties (e.g. consultants)
However, transience of project activities/teams can impair the
accumulation of institutional knowledge and thus can impede
Project Learning
Source: F. Pena-Mora 2003
22
The Need for Project Reviews
Why do we review projects?
Bridging Gaps
Validation of Work Done
Quality Assurance
Learning
23
More on the Need for Project Reviews
Why construction projects in particular need
formal reviews:
Design and Planning Phase Generating 75 % of the Problems
Encountered in the Construction Site Need for
Understanding and Coordinating the Contract Documents and
Technical Specifications
Current era: construction very fast paced Errors More Likely
Frequent critical reviews are needed more and more to keep up
with the pace.
Rising requirements for high quality and corporate effectiveness
24
Other Benefits of Project Reviews
Other effects:
- Knowledge Transfer
- Team Building
These are positive side-effects rather than pursued goals
Team Building is a much desired side effect particularly for
projects that are highly segmented (such as construction
projects)
25
Project Review How to do
it?
Specific Approaches (Tools) for reviewing projects
Peer Reviews
Project Meetings and Walkthroughs
Inspection
Any combo of the above
26
Project Meetings A Useful Tool for Project
Review
Purposes and Types of Project Meetings
Assessing what has been done, what has
happened?
Reviews Discussion
May also include inspections Visual validation
Assessing why it has happened: Audits
How have resources been used?
27
How to Conduct a Successful Project Meeting
Schedule your meetings well ahead of time to increase likelihood of
participation
Meetings should have well-defined purpose and agenda
Keep project meetings very impersonal!
Goal is to focus on problems rather than people
Discuss process rather than ad-hoc decisions
Keep focus on needs of project
Avoid holding meetings that are perceived as witch hunting or challenging
some project party or team member
Recriminating meetings
do not make progress
can lead to ongoing rifts among personnel
can lead to defensiveness and emotions that can overwhelm rational analysis
28
Some Categories of Project
Reviews
Level of the Review: Technical vs. managerial
What is the orientation? Work output-oriented vs.
process-oriented
Status of the Reviewers: Internal review vs. peer
review
Tool for the Review: Meetings, Inspections, etc.
29
Project Reviews at Technical
Level
Focus on
Technical problems and issues
Interdependencies b/n design and construction methods
Typical technical review program at project start-up
System requirements review
System design review
Preliminary design review
Typically, project reviews become more technical over time
30
Project Reviews at Management
Level
Focus on overall practices and process
Communication Channels
Information Coordination
Teamwork Effectiveness
Client Relationships
Supervision Efficiency
Reliability
Contract Management
Learning Programs
Overall and general (not specific) levels attained for the performance
measures
Cost
Quality
Safety
Performance
31
Technical vs. Managerial Reviews
FEASIBILITY
DESIGN,
PLANNING
DEVELOPMENT
CLOSEOUT
OPERATIONS
Pea-Mora ,et. al., 2003
32
Output-Oriented vs. Process-Oriented
Reviews
Work output-oriented reviews
Seek to identify issues with completed work
Primarily focused on shorter-term issues
Process-oriented reviews
Seek to identify problems with processes
Tend to be focused on longer-term
Can recourse to higher-order reviews
Reviews could be comprised of both
33
Project Reviews by Peers
An alternative to Project Review by Internal personnel
Informal review conducted among specialists in the same field,
focused on a particular project aspect
Focus is on work rather than project team
Benefits:
Early Discovery of Mistakes and Reduction of Rework
Avoidance of Similar Pitfalls in the Future
Enhancement of Team Spirit
Promotion of Learning
Documentation Limited to Memos and Duration not Exceeding
30 to 60 Minutes
34
Project Review by
Inspection
Inspection viewed as one form of formal technical reviews
A formal review: technical or managerial personnel analyses of
the quality of
an original piece of work product
the process itself
Inspection in construction: substantial completion, final
completion,
Importance of documentation and formalism to foster feedback
and diffusion of learned lessons
35
Project Review What form does it
take?
Major Forms of Overall Project Reviews:
Value Engineering Review
Constructability Walkthroughs
Substantial Completion Inspection
Final completion inspection
Each of these forms may involve one of
more review tools previously discussed
36
Forms of Major Project Reviews I Value
Engineering
Value engineering is the process of:
Identifying and quantifying the performance of various systems in
the design of a facility;
Evaluating the costs and benefits of alternative solutions that
achieve similar or better performance for the same or lower costs
Reviews are necessary for two reasons:
Need of extensive communication and collaboration
Uncertainty in the construction industry
37
Forms of
Overall
Project
Reviews
Constructabilit
II y
Walkthroughs
38
Forms of Overall Project Reviews III Substantial
Completion Inspection
Is a formal inspection that follows the contractors request and
a subsequent number of walkthroughs towards the end of the
works.
The project manager, the owner, the engineer and the
architect inspect the (almost) completed project, and decide
whether it is suitable for occupancy for its intended purpose.
The SCI is a formal, contractually prescribed review, with
important legal significance.
Often serves as trigger for release of retainage
Sometimes followed by final completion inspection
39
Summary
Approaches, Functions, and Forms for Project
Review
Approaches for Project Reviews: In form, formality and
functionality, these range from informal peer reviews to
contractually prescribed inspections with legal significance.
Key functions of Project Review: (1) Where has project reached
and how/when, (2) quality assurance, and (3) knowledge transfer
and learning.
Forms of Project Review established by the construction industry:
Value engineering reviews, Constructability walkthroughs and
Substantial completion inspections.
40
Project Audits What are they?
Definition: A thorough examination of the management of a
project (methodology and procedures, records, properties, budgets
and expenditures, and degree of completion. (Meredith and Mantel, 2006)
Difference:
Project Review: What problems are there? When did they occur? How severe?
Project Audit: Detailed form of Project Review
Mostly, Why did the problems occur? More formal and more documented.
Audits are the most formal and comprehensive form of project review.
Goal here is to understand why project is in its current state
Project audits may be for the entire project or only for parts thereof
Project audits present the best opportunity for formal learning.
41
Contents of a Project Audit
Current status of the overall project: Why work actually
completed does or does not match the planned level of
completion?
Future status: Likelihood of any changes in schedules, cash
flows, etc. Why?
Status of critical activities: Why the current and predicted status
of tasks could make or break the project
A critical examination of project management issues at all
management levels
42
Contents of a Project Audit
(contd)
Risk assessment and analysis: What is the potential for project
failure or monetary loss?
Lessons learned from (or to) other similar projects
Assumptions, limitations and quality of data used in the audit
Comments and conclusions by the author of the audit
43
Who Needs the Audit?
The project manager, who seeks unbiased and comprehensive
information from groups or individuals within the project
organization.
The organization, which seeks to identify the errors made, track
their causes, and learn not to repeat them.
The client, who can relate the value of project development to
their own actions and decisions.
Any external stakeholders or sponsors of the project; financial
institutions, government agencies, consumer groups,
environmental or religious organizations and social groups.
44
Financial, Management and Project Audits
Meredith J.& Mantel S., 2000
45
Focus on Project Auditing
Scopes
Pea-Mora ,et. al., 2003
46
Causal Relationships examined in
a Project Audit
What is affecting What?
47
Causal Relationships examined in
a Project Audit
Causal Relationships and the Dynamic Interaction between
Schedule Cost Quality
Staff Experience & Skill Quality Productivity
Project Requirements Organization Culture
Stakeholders Value Perception Value Delivery
Schedule, Cost and Quality Strategic and Tactical Decisions
Product-Specific Requirements Work Breakdown Structure, Organizational
Breakdown Structure, Product Development Model
Information Flow & Record-keeping Work Breakdown Structure, Organizational
Breakdown Structure
Monitoring Configuration Corrective Actions Time Delays Ultimate Effects
Resource Planning Cost Schedule Performance
Hiring Policy Cost Quality Performance
Financial Strategy Explicit and Implicit Constraints Imposed Strategic and
Tactical Decisions
48
Project Audit Essentials
It is essential that a project audit
Succeeds in serving as a Learning Tool that consists of
Two Separate Processes:
Generation of the Lesson
Adoption of the Lessons by the Organization or Project Team
Consists of some key ingredients such as:
An effective Audit Team
Unfettered Access to Project Records
Communication With Project Personnel and Others
Ability of Audit Team to investigate Exogenous Causes of Project
problems
The Audit Should be Truthful and Honest
Auditing Performance of Project Personnel
Audit Report Distribution
49
The Need for Communication With
Personnel during an Audit
Free flow of information from project personnel to
audit team
Two reasons for communication problems:
Unavailability of certain personnel
Distrust towards the audit team
Personnel mental and psychological training to audits
(pre-announced scheduling can help!)
Compromise between friendliness and
professionalism of the audit team
50
Auditing the Performance of Project
Personnel
Evaluation of Personnel Performance
Productivity, creativity, commitment, quality , response to unplanned
situations , leadership, teamwork, adoptability to the project and
organizational culture and relationships with other personnel.
Evaluation Often Viewed As criticism and threat to the Profession
Solution:
Focus on Situations, Not Individuals
Personnel Performance Taking Into Account the Organizational
Structure and the Culture of the Organization
51
Audit Report
Distribution
Selective report distribution
Importance of defining a distribution list for the
report early in the life-cycle of the audit
Comprehensibility of the report to all the
addressees
Implementation of information technology in
report distribution
52
Phases of a Typical Project Audit
Initiation
Planning
Execution
Reporting and Release
53
Phase 1 : Initiation
Setting of the Pursued Goals
Formal Determination of Audit Scope: length, formality,
the recipient list and the parameters of the project
Tasks Involved:
Determination of the goals of the audit
Expert Team Formation.
Establishing the Purpose and the Scope of the Audit.
Notification of the Project Team
54
Phase 2: Planning
Three Major Work Elements:
Determine the cost, time and technical constraints that do or
will govern the auditing effort
Determine the means and methods to be used in the audit
Agreeing on a performance baseline
This Step Includes:
building the questionnaires , the checklists and the data
gathering forms
planning an interview schedule
55
Phase 3: Audit Execution
Investigation Starts With Data Collection
Investigation Follows With Data Analysis and Investigation,
Focusing On:
Assessment of the Project Organization, Management, Methods and
Controls
Statement of both Current and Former Status
Preliminary Statement of Forecasted Project Status
Working Quality Assessment
Delivered Quality Assessment
Lessons Learned Action Plan
Audit Execution Followed by Self-Scrutiny Review
56
Phase 4 : Report Preparation and
Release
Audit Report should conform to the audit requirements and
needs
Report should be released according to the distribution plan
Importance of planning the logistics of report preparation and
release
The policies for conducting and distributing the report:
- balancing political correctness
- ease of assimilation of the lessons
- truthfulness
- brevity.
57
Phase 5: Finishing up the Project
Audit
Three Essential Steps:
Audit Database and Document Filing by audit service
management division
Post-Audit Consulting: the last chance for the project team to
discuss with and learn from the auditors
Audit Program Evaluation. The effectiveness, quality,
sophistication and depth of the audit are examined.
- the problems the audit team encountered during their job
are also listed
58
Project Audit
Report
A formal document presenting all the work done and the
conclusions reached
Table of Contents for a Typical Audit Report:
Introduction: Project and Audit Scope, Objectives and Circumstances
Current Project Status: entire project ecosystem
Future Projection
Recommendations about changes in technical approach, budget and
schedule for the remaining tasks
Risk Assessment and Analysis:
Limitations and Assumptions of the Audit : listing of Time, depth, lost
records, negative attitudes, focus in specific directions, assumptions and
poor inputs
59
Project Audits Summary
Use Project Audits to reveal the interactions between elements in the
project ecosystem and their effects on the project.
Also to investigate the project (or a part of it). In doing so, they must be
honest and objective. Only then will they be useful.
Plan audits carefully: Establish a baseline for comparison, but be open to
in-depth investigation if necessary. If the project is long or complex, plan
the Audit as a continuous learning processes.
Make audits worthwhile: Introduce the auditing procedure as an integral
part of the product development process. Teach people to appreciate it
and learn from it. It works for them, not against them.
60
Questions?
61