Chapter 2 Process Selection Design and Analysis
Chapter 2 Process Selection Design and Analysis
1) Available capacity
2) Expertise
3) Quality consideration
4) The nature of the demand
5) Cost
6) Availability of suppliers
7) Desire to specialize in a particular field of manufacture
8) Control of design secrets
9) Availability of R&D facilities in- house.
10)Reliability of outside suppliers
11)Lead time for procurement versus lead time for in- house manufacture
12)Delivery schedules to me met.
13)Employee preference for particular nature of work.
When to make?
When to buy? 2
PROCESS
A process is any part of an organization that takes input and transforms them into
outputs that, is are of greater value to the organization than the original outputs.
System
3
PROCESS PLANNING
aswathappa
4
MAJOR PROCESS DECISION.
10
11
TYPES OF PROCESS
Based on stages
Buffering
Blocking
•Single stage
Starving
•Multi stage
Bottle neck
Based on order
•Made to order
•Made to stock
•Hybrid
•ETO Engineered to order
•ATO Assembled to order
12
MEASURING PROCESS PERFORMANCE
Tailored clothing
Furniture rental
Fast food restaurant
Plumbing repair
Office cleaning
Health club
Airline flight
Retail banking
Insurance
Weather forecast
Lo Intangible Elements
14 Hi
Levels of Customer Contact
with Service Organizations
Emphasizes encounters
High with service personnel
Nursing Home
HairCut
4-Star Hotel
Management Consulting
Good Restaurant
Telephone Banking
Airline Travel (Econ.)
Cable TV
Subway
• Internet Banking
Mail Based Repairs
Emphasizes encounters
with equipment
Internet-based
Services
Low
15
PROCESS THROUGHPUT TIME REDUCTION
3) Reduce interruption.
16
SYSTEM
17
Description Job Shop Batch process Repetitive (Assembly) Continuous Project Process
Process
Output characteristic Customized goods or Semi standardized Standardized goods or Highly standardized Highly customized
goods & services services goods services services goods or services services
E.g. Machine shop Bakery, class room Assembly line for Steel mill, chemical Dams , Buildings
automobile plant
Volume Low Low to moderate High Very high Very high
Variety Very high Moderate Low Very Low Extremely Low
Equipment flexibility Very high Moderate Low Very Low Low to high
Disadvantages Slow, high cost per Moderate cost per Low flexibility high cost Very rigid, lack of Very difficult to plan
unit , complex unit , moderate of down time variety, cost to change, and control
planning and scheduling complexity very high cost of resources cost and
scheduling downtime 18
time of completion