BIDDING DOCUMENTS Bidding Requirements Contract Forms
Contract Conditions
Specifications Drawings
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
CONTRACT DOCUMENTS Contract Forms Contract Conditions Specifications Drawings
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
PROJECT MANUAL
Bidding Requirements
Contract Forms Contract Conditions Specifications
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
Bidding Requirements
invitation instruction information bid form bid bond
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
Contract Forms
agreement performance bond
payment bond
certificates
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
Contract Conditions
general supplementary
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
Specifications general siteworks concrete masonry metals wood and plastics thermal&moisture protection doors&windows finishes specialties equipment furnishings special construction conveying systems mechanical DOCUMENTS electrical OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
BIDDING DOCUMENTS
Bidding Requirements
Contract Forms Contract Conditions Specifications Drawings architectural structural sanitary mechanical DOCUMENTS electrical OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
CONTRACT DOCUMENTS
Contract Forms
agreement performance bond payment bond certificates
Contract Conditions
general supplementary
Specifications Drawings
BASIC PROVISIONS
Contracting Parties Scope of Work Architects Services Architects Fee and Manner of Payment Owners Responsibilities Expenses Chargeable to both parties Project Supervision Estimates Ownership of Documents Successors and Assigns Arbitration Acknowledgement and Jurat
AGREEMENTS
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
architectural - Perspective
Location Plan Vicinity Map Floor Plans Elevations Sections Foundation Plan Footing Details Beam & Column Details Floor Slab Details Floor Framing & Details Roof Framing & Details
sanitary
- Water Distribution System - Drainage System - Liquid and Solid Waste
mechanical
- air-conditioning system - movement systems
structural
electrical
- lighting system - power distribution system
PLANS
OWNER-ARCHITECT AGREEMENT UAP DOCUMENT NO.401
The Parties Art.1. Scope of Work Art.2. Time of Completion and liquidated damages Art.3. The Contract Amount
Art.4. Payments
Art.5. The Contract Documents Art.6. Performance and Payment Bonds
Art.7. Taxes, Licenses, Permits and Fees
Art.8. Insurance and other Conditions
OWNER-GENERAL CONTRACTOR AGREEMENT UAP DOCUMENT NO.402
purpose&importance of specifications
a written document that provides information required for proper construction or material and equipment procurement, which cannot be placed in the drawings
architect as specification writer
qualifications of a specifications writer types of specs
16-division uniform construction index
3-part format elements of specs. composition
spec. language
step by step specification writing
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307
purpose&importance of specifications architect as specification writer
scope of work materials to be used method of installation quality of workmanship
qualifications of a specifications writer types of specs 16-division uniform construction index 3-part format elements of specs. composition spec. language step by step specification writing
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307
The 16-division uniform construction index:
1- General Requirements 2- Sitework 3- Concrete 4- Masonry 5- Metals 6- Wood and Plastics 7- Thermal and Moisture Protection 8- Doors and Windows 9- Finishes 10- Specialties 11- Equipment 12- Furnishings 13- Special Construction 14- Conveying Systems 15- Mechanical 16- Electrical
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307
part 1: general
-scope -description of systems -reqts of regulatory agencies -qualifications -submittals -mock-up -product handling -environmental conditions -protection -operating instructions -extra stock -alternates -measurement and payment
the three-part section format:
part 3: execution part 2: product
-materials -mixes -equipment -fabrication -source quality control -condition of surfaces -preparation -installation -field quality control -adjusting -patching -cleaning -schedules
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307
types of specifications:
performance specifications descriptive specifications brand name specifications - closed - open reference specifications combination
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING UAP DOCUMENT NO.307
scheduling techniques
bar chart s-curve
linked bar chart
line balance critical path method
importance of time management contract stipulations labor paid by hour/day equipment rental by hour/day
liquidated damages
D 3 I .5 A 2 B 2 G 1 H I .5 J 1 C 3 E 4 F 6 2 K 3 J
pert-cpm
activity
network duration event
dummy activity
critical path float/slack early start
late start
late finish
PROJECT SCHEDULE
bar-chart
ITEMS COST OF TOTAL COST DESIGN & WITH LABOR MATERIALS & ADD-ONS 1,000,000 332,000 100,000 222,800 1,012,494 488,640 3,831,600 252,500 3,261,800 696,000 5,375,954 239,790 87,000 287,410 1,430,411 18,618,399 11,794,756 PROJECTED MONTHLY ACCOMPLISHMENT PROJECTED CUMULATIVE ACCOMPLISHMENT % ACCOMPLISHMENT 30,413,155 30,413,155 1,332,000 1,332,000 4.38% 2,466,312 3,798,312 12.49% 5,202,420 5,359,970 6,192,457 5,647,208 4,212,788 9,000,732 14,360,702 20,553,159 26,200,367 30,413,155 29.59% 47.22% 67.58% 86.15% 100.00% 1,000,000 332,000 168,231 374,820 1,703,333 822,046 6,445,955 424,784 5,487,373 1,170,891 9,044,044 403,402 146,361 483,514 2,406,401 601,600 1,203,200 601,600 390,297 212,392 374,820 1,277,500 425,833 822,046 2,148,652 212,392 1,829,124 780,594 2,214,681 3,414,681 403,402 146,361 483,514 3,414,681 1,829,124 1,829,124 2,148,652 2,148,652 MONTH 0 MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6 DESIGN PREPARATION PRE-CONSTRUCTION SITEWORKS UTILITIES CONCRETE MASONRY METALS WOOD AND PLASTIC THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES EQUIPMENT FURNISHINGS MECHANICAL AND ELECTRICAL 1,000,000 332,000 168,231
17,286,399
29,081,155
s-curve
S-CURVE
% ACCOMPLISHMENT
120 100 80 60 40 20 0 Series1 1 4.38 2 12.49 3 29.59 4 47.22 MONTH 5 67.58 6 86.15 7 100 Series1
line balance