Total Productive Maintenance
TPM
TPM as a Lean Initiative
Competitive costs require
Spending control Defect control Downtime reduction
TPM = Total Productive Maintenance
Proactive (with all employees involved) Preventive Predictive Planned
Why Change?
ACTIONS:
Reduce defectives / scrap Reduction of lost production time Lowest possible cost by reducing waste
Lean System
Peak Performance Pull system / flow production
Rapid Changeover / Customer-driven lot size
Continuous Waste Reduction Lean Measures
5S
Visual Factory
TPM
Standardized Work
Variation reduction / Six Sigma
In-Station Process Control Leadership by Example & Commitment Employee Involvement & Mutual Respect
7 Wastes
Transportation Excess production Added processes Motion
Waiting Inventory Non-conformance (defectives)
Causes of Waste
Excess Manning
Poor layout and material presentation Rework and extra processes Inconsistent / inefficient work methods
Excess Downtime
Tooling condition Unreliable equipment Long changeovers Incapable process
Defectives - Rework or Replace
Incapable processes or process not compatible with customer expectations or design spec (design for mfg) Tooling condition Operator methods and errors
Causes of Waste
Excess Manning
Poor layout and material presentation Rework and extra processes Inconsistent / inefficient work methods
Excess Downtime
Tooling condition Unreliable equipment Long changeovers Incapable process
Defectives - Rework or Replace
Incapable processes or process not compatible with customer expectations or design spec (design for mfg) Tooling condition Operator methods and errors
What is Waste (Muda)?
Some of the main forms of waste are: Overproduction Waiting for materials, machines, or instruction Transportation or movement Excessive inventory
Inefficient machine processing and/or operation
Producing defects Part or line changeover or machine setup Inadequate housekeeping Miscommunication or inadequate instruction
Identifying Waste in the Workplace
Operational Activity Value added Operations Any process that changes the nature, shape or characteristic of the product in line with customer requirements e.g. Pressing, welding, heat treatment.
This is where we make a profit!
Identifying Waste in the Workplace
Operational Activity Non-Value added Operations Work carried out which is necessary under current conditions, but does not increase product value. e.g. Inspection, tool change, maintenance.
This is where we make a loss!
Value Added and Non-Value Added operations
The objective is to raise the ratio of Value added operations to non-value added operations and eliminate waste.
OPERATOR TIME
WASTE NON-VALUE ADDED
VALUE ADDED
ELIMINATE
MORE TIME FOR OTHER ACTIVITIES
NON-VALUE ADDED
VALUE ADDED
7W The Elimination of Waste
The benefits in eliminating all waste:
Reduced costs Greater Capacity Bottlenecks are identified
7W 7 Types of Waste
1 Over-production
2 Inventory
3 Transportation
4 Process
5 Idle Time 6 Operator Motion 7 Bad Quality
7W 1. Over-production
Producing more than is needed hides a multitude of problems. Excessive set-up times, machine faults, risk of producing obsolete stock.
7W 2. Inventory
Carrying stock attracts cost & storage problems. Storage leads to stacking, racking, sophisticated computers, bar coding & automation, all for an activity that adds no value to the product.
7W 3. Transportation
This may appear unnecessary but does add value. Large transport is easily identified but small transport such as manual labour may not be so noticeable. These can be improved by changes to the work environment.
7W 4. Process
Adds cost but no value - e.g.trimming & moulding to a level that is beyond the required standard adds extra time that customers do not want to pay for.
7W 5. Idle Time
Typically, waiting for
products & services from preceding operations, waiting for work from their previous set-up or waiting for cycles to finish, or meetings to start.
7W 6. Operator Motion
Typically, single handed operations where both should be used, stretching unnecessarily or awkwardly and walking between things. All of these take time or use time poorly, none add value.
7W 7. Bad Quality
Rejects are always produced by systems and procedures created by management. If operators fail it is because the process allowed them to fail through inadequate training or because the process was not capable in the first place.
7W The Elimination of Waste
So, now we understand the 7 wastes, we can: Produce only what is needed; Carry only essential stock; Use transportation more wisely; Produce work to the standard required; Plan our production processes; Put our efforts to the best possible use; Train to make quality work every time!
Effective TPM Eliminates 5 Losses
1. 2. 3. 4. 5.
Equipment breakdowns Defects, scrap, and rework Safety Issues Mini stoppages Reduced speed
What is TPM??
TPM is a Lean tool to optimize the effectiveness of manufacturing equipment and tooling.
1. Starts with 5S / Visual Factory 2. Builds a comprehensive Downtime Database by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Develops Professional Maintenance skills
Operator Autonomous Maintenance
Seven Steps of TPM
Aut. Mgt. Standardization Autonomous Inspection
7 7 6 6 5 5 4 4 3 3 2 2 1 1
General Inspection Initial Standards Countermeasures for Contamination Initial Clean-up
TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance
5S Workplace
A safe, clean, orderly workplace is fundamental to quality, efficiency, and teams
Sort (organize) Shine (clean) Set in order (make orderly and neat) Standardize (visual place for everything) Sustain (maintain the system)
What is 5S and why do we want to do it?
5S is short for: Sort, Set in Order, Shine, Standardize and Sustain 5S represents 5 disciplines for maintaining a visual workplace (visual controls and information systems).
These are foundational to Kaizen (continuous improvement) and a manufacturing strategy based "Lean Manufacturing" (waste removing) concepts. 5S is one of the activities that will help ensure our companys survival.
5S
1. Sort - All unneeded tools, parts and supplies are removed from the area 2. Set in Order - A place for everything and everything is in its place 3. Shine - The area is cleaned as the work is performed 4. Standardize - Cleaning and identification methods are consistently applied 5. Sustain - 5S is a habit and is continually improved Also - Work areas are safe and free of hazardous or dangerous conditions
Some 5S Examples
After 5S - Cleaned, organized and drawers labeled (less time and frustration hunting)
Before 5S
5S Examples - Sort, Set in Order
See the difference? 1. Sort - All unneeded tools, parts and supplies are removed area 2. Set in Order - A place for everything and everything is place from the in its
5S Examples - Shine
3. Shine - The area is cleaned as the work is performed (best) and\or there is a routine to keep the work area clean.
5S Examples - Standardize
4. Standardize - Cleaning and identification methods consistently applied are
Departments have weekly 5S tours
Every job has duties that use Sort, Set in Order and Shine We all have common duties to do our part to keep all areas of the plant in shape - breakroom, restrooms, locker area, parking lot, etc
5S Examples - Sustain
5. Sustain - 5S is a habit and is continually improved
5S is a simple concept with powerful results. You will get additional information on 5S so that you will be well equipped.
Our experience is that the more we do 5S the better the work environment becomes: cleaner, safer, more organized, the work is easier, less confusion and less stress.
Use the 5S (work\home\play) - The more you use it the easier it becomes and life just gets better and better.
The Good, Bad and the Ugly
First the Bad and the Ugly - Life Without 5S
The Good
Some New Words
Red Tag-Process for tagging, removing and disposing of items not needed in the work area. Lean Manufacturing-concepts that seek continuous improvement by removing waste in processes Some Japanese words you need to know: Kaizen-(pronounced ki zen) - improvement Kaizen Event and 5S Event-Planned improvements to a specific area or process (usually take 3 to 5 days). 5S Events focus on making 5S improvements. Muda-(pronounced moo da) - waste Gemba-(pronounced gim ba) - workplace
New Words
Kanban-(pronounced kon bon) - Pull type inventory control system. Items are only produced to meet customer needs. The request to produce more is signaled from an upstream operation and/or customer orders. Value Stream Map - A diagram of all processes needed to make and deliver the product to the customer.
OTHER PROBLEM SOLVING TOOLS
TOC-Short for Theory of Constraints. Problem solving and constraint management methods. Use the 5 Step form of TOC to solve problems that you will encounter in your continuous improvement efforts.
Improvement (Kaizen) Principles
Get rid of all old (false) assumptions. Don't look for excuses, look for ways to make it happen . . Don't worry about being perfect even if you only get it half right start NOW! It does not cost money to do KAIZEN. If something is wrong Fix it NOW. Good ideas flow when the going gets tough. Ask "WHY" five times - get to the root cause. Look for wisdom from Ten people rather than one. Never stop doing KAIZEN.
TPM starts with 5S
You cant see problems clearly when the workplace is in disarray Cleaning and organizing the workplace helps the team to uncover problems Making problems visible is the first step of improvement Clean machines and workplace create pride & Safety
Downtime Visual Controls Visual or audio alerts
Abnormality obvious at a glance (e.g. stoppage, reject, control fault) Alerting Maint and team leaders Provide real time scoreboard for employees
Machine down light visible from aisle Production status board (e.g. actual counts vs. goal) Scrap counts and downtime minutes Located in clear view in shop (not in control room) Simple, self regulating, & employee managed
TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory
2. Builds a comprehensive downtime data base by cause, frequency, and duration
3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance
Categorize at a minimum by Equip, Tooling, C/O, Other Segmented bar graph for E-T-O lost time Subcategories for Equip (e.g.)
Hydraulic / pneumatic Mechanical / lubrication Electrical / controls Shot-end components Slides Cores Inserts Ejector pins
Downtime Database
Subcategories for Tooling (e.g.)
Subcategories for Other (e.g.)
Operator error Materials
Minimum Downtime Tracking
Other
Downtime by Cause 3500 ton Bay (avg min/shift per Machine)
120 100 80 O T E
Tools
Minutes 60 40
Equip
20 0 1Q02 2Q02 Jun Jul Aug Sep Oct Nov Dec
TPM is Planned, Predictive, & Preventive 1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration
3. Predicts and prevents downtime by PM system
4. Expands role of Operator as first point of early warning and prevention 5. Professional Maintenance
Rate/hr vs. target or historical normal output (B/W) Database MP2 / maintenance history statistical probability (frequency & duration) Physical prediction of impending failure Sound (bearing) Temperature (cooling water) Flash (core pins) Shot monitoring system SPC on part geometry Hydraulic pressure (ejector pins) Spindle loads (amps) Fluids / Lubrication analysis (milipore) Vibration Signature Analysis
Predictive Maintenance Tools
Preventive Maintenance System
History of downtime by major machine & tool Downtime measurement & tracking Mean Time Between Failures Average downtime Pareto of causes at component level (eg L/S or temp sensor) Cost to maintain Develop PM cards based on frequency of failure and magnitude of average lost time (start small & grow) Limit & prox switches Shot tip / sleeve Critical frame and cylinder mounting bolts Expendable tools Valves, hoses, packing, seals PMs have instruction, schedule/frequency & sign-off PMs / repairs done in window of opportunity when machine is down Cycle count or date based execution of PMs (eg cutter change) PM status visual (work completed / not completed)
TPM is Planned, Predictive, & Preventive
1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system
4. Expands role of Operator as first point of early warning and prevention
One point lessons for operator awareness Creates OMP (Operator - Maintenance Partnership) Operator performs checks, problem solving, and improvements 5. Professional Maintenance
TPM
Production Operators Clean & Check Observe Categorize Production Planning & Control Schedule P.M.
Active Planned Maintenance Process
Manufacturing Engineers Equipment Planning Equipment Studies
Quality Engineers Standards & Calibrations
OMP -
Operator Maintenance Partnership
Operator training in TPM Operator basic equip inspection & tooling checks Operator basic cleaning Operator lubrication check One point lessons (capture knowledge) TPM Board & TPM Tags (proactive operator involvement)
TPM
TPM Tag System
Problem communication tool to and from maintenance, tool room, and production
Identify abnormal machine conditions Record problem discovered by operator Record problem found during scheduled PM Status tracking system of requested repairs TPM visual management tool (hang tags) Repair history for future problem solving
TPM Tag used for recording problem & fix
Blue Tag-Operator or Maint responsible to repair Red Tag- Safety-related request (priority)
Tag Process
Operator/Supervisor 1. Abnormality Identified 2. Fill out Tag Red= Safety Blue= Prod/Maint 3. Hang C-tag as close to the defect as possible 4. Hang A &B Tags on the TPM Tag status board by Machine location and area of responsibility to correct. 5.Maintenance evaluates problem. If fixed immediately go to 6. If parts or time needed, maint pulls A tag from board. The A tag is MWO. The B tag is posted on the Maint WO status section of the TPM Board with est. timing. 6.After work is completed, maintenance completes back side of A tag and places both the A & B tag in the work completed box 9. Production management reviews the information. Also reviews the comments and takes actions if required. Places tag in history file box located in the office Tag information is recorded and reviewed for continuous improvement of PM database by Production and Maintenance; Repeat operator tags may indicate Maint needs to investigate. Production Management Maintenance
7. Operator/Supervisor check to see if work was done.
8. If OK, Operator/ supervisor removes C tag from machine and places ABC tags in Completed box. If not OK, tags stay and maint is contacted. Contact noted on tag.
TPM is Proactive, Predictive, Preventive & Planned
1. Starts with 5S / Visual Factory 2. Builds a comprehensive downtime data base by cause, frequency, and duration 3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early warning and prevention
5. Professional Maintenance
Professional Maintenance
Equip Safety Skill building Cross-training Area Maintenance WC MRO stores Maint Mgmt System Down alarms Radios Planned PM
Operator Autonomous Maintenance 7 Steps
T P M
Aut. Mgt. Standardization Autonomous Inspection
7 7 6 6 5 5 4 4 3 3 2 2 1 1
OIL
General Inspection Prepare Temporary Standards Countermeasures for Contamination Initial Clean-up
TPM
Initial Focus
5S
TPM I Step 1 Step 2 Step 3
TPM II Step 4 Step 5 Step 6 Step 7
prerequisite for TPM I
STEP 3: Prepare Temporary Standards
This step is to enhance the equipment reliability & maintainability.
Temporary Check Sheet For Clean-Up, Lubrication, Start-up, and Shut-down:
What items need to be done Who will perform the check How often to check Where the location is to be checked What to use for the inspection or cleaning Target time to complete the task
TPM = Total Productive Maintenance
TPM Summary
Peak Performance
Proactive (all employees involved) Preventive Predictive Planned
Continuous Waste Reduction
TPM is an integral part of JLF Total Quality production System
5S
Visual Factory
TPM
Standardized Work
TPM is a Lean tool for Quality and Productivity