CAPTIVE POWER PLANT
POWER AND STEAM PRODUCTION AND DISTRIBUTION
- MANAVADARIA NAYAN K. (F.O.P.E.) C.P.P. (MECHANICAL MAINTENANCE)
25-JAN-06 2:00P.M.
POWER CAPABILITY
GAS TURBINES (GT) - 7 Nos. 7X30 MW = 210 MW STEAM TURBINES (ST) - 2 Nos. 2X40 MW = 80 MW TOTAL - 290 MW
25-JAN-06 2:00P.M.
STEAM CAPABILITY
HEAT RECOVERY STEAM GENERATOR (HRSG) - 7 Nos. 7X125 TPH = 875 TPH STEAM TURBINES (ST) - 2 Nos.
AUXILLIARY BOILER (AUX. BOILER) - 1 No. 95 TPH TOTAL = 970 TPH
25-JAN-06 2:00P.M.
CONSUMERS
MEG#1, 2, 3 VCM PVC PE#1, 2 POY CRACKER PTA#1,2 PP BUTADIENE OTHERS
25-JAN-06 2:00P.M.
POWER & STEAM DEMAND
POWER :
INSTALLED CAPACITY NORMAL AVAILABLE CAPACITY PRESENT DEMAND SURPLUS FUTURE DEMAND TOTAL SURPLUS - 290 MW (30X7+40X2) - 226 MW (26X6+35X2) - 222 MW - 4 MW - 67 MW - -63 MW (226-222-67)
- 970TPH (125X7+95X1) - 810TPH (120X6+90X1) - 592TPH - 218TPH - 223TPH - -5TPH (810-592-223)
5
STEAM :
INSTALLED CAPACITY NORMAL AVAILABLE CAPACITY PRESENT DEMAND SURPLUS FUTURE DEMAND TOTAL SURPLUS
25-JAN-06 2:00P.M.
NEW PROJECTS
GAS TURBINES - 3 Nos. (#8, 9, 10)
HRSGS
- 3 Nos. (#8, 9, 10)
25-JAN-06 2:00P.M.
FUTURE REQUIREMENTS
POWER DBN - MEG & CRACKER - 4.4 MW BUTADIENE - 3.7 MW POY & PSF - 43.8 MW PTA#3 - 13.3 MW ACETYLENE - 1.8 MW TOTAL - 67 MW STEAM 39 TPH 34 TPH 39 TPH 82.4 TPH 37.7 TPH 223 TPH
25-JAN-06 2:00P.M.
GAS TURBINES & HRSGs
GT #1 & GT #2 - HRSG #1 & HRSG #2:
MAKE - M/S THOMASSEN INTR. OF HOLLAND FUEL - NATURAL GAS, HSD, C-9 BLACK FIRED TURBINES
GT #3 TO GT #9 HRSG #3 TO HRSG #7 :
MAKE - BHEL OF INDIA FUEL - NATURAL GAS, HSD, C-9 & NAPHTHA
HRSG #8 & HRSG #9
MAKE - THERMAX ENGG.
25-JAN-06 2:00P.M.
STEAM TURBINES
STG #1
MAKE - SKODA BOILERS OF HOLLAND TYPE - DOUBLE EXTRACTING CUM CONDENSING
STG #2
MAKE - BHEL OF INDIA TYPE - EXTRACTION CUM INJECTION CUM CONDENSING
25-JAN-06 2:00P.M.
AUXILLIARY BOILER
MAKE - M/S STORK BOILERS OF HOLLAND CAPACITY - 95 TPH TYPE - NATURAL CIRCULATION, FORCED DRAFT
25-JAN-06 2:00P.M.
10
THANK YOU
25-JAN-06 2:00P.M.
11