07feb UAPdocs
07feb UAPdocs
IAPOA
PRBoA
IAPOA
Note: Laws and regulations are more stringent as these are detailed.
by Archt. Armando Dominador N. ALLI
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
3. What has happened to the UAP Docs since the March 2004 approval of RA 9266?
a. A UAP Task Force under the UAP College of Fellows (CoF) started work on the amendments to the UAP Docs in late 2004; b. The amended UAP Document 200 was officially promulgated by the PRBoA with the requisite PRC approval in mid-2006; c. The draft of UAP Doc 201 (Pre-Design Services) was forwarded to the PRC c. 17 January 2007 and is under PRBoA review; d. The draft of UAP Doc 208 (Selection of the Architect and Methods of Compensation) was forwarded to the PRC c. 23 Jan 2007 and is under PRBoA review; e. The draft of UAP Doc 207 (Design-Construct Services) was forwarded to the PRC c. 14 Feb 2007 and is under PRBoA review; f. The drafts of UAP Docs 202, 203, 204, 205 and 206 as well as UAP Docs 209 and 210 are not yet with the PRC/ PRBoA.
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
c. It is also therefore possible to confine ones offer of architectural services to what is initially or actually required by the Project and/or by the Client i.e. Architects
do not have to offer an entire set of architectural services that carries a higher price tag; Architects therefore have a better chance of getting involved in a project by offering only what is needed.
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
b. Architectural Plan Preparation involves both Pre-Design and Regular Design Services covering Site Analyses, Code Searches,
Architectural and Standards Research, Space Planning, Operational and Use Surveys and Analyses, Architectural Programming including Space-TimeMotion Studies, Space Planning, Furniture and Equipment Layouting, Project Conceptualization, Site Development Planning, Architectural Plan Preparation and like activities;
c. Architectural Design preparation basically cover Regular Design and Contract Documentation Services ranging from architectural plan
refinement/ detailing, specification, estimation, contract document production through tendering and related pre-construction activities; d. For large to very large Projects, Architectural Plan Preparation and Design _____________________________________________________________________________________________________________________________ _________________________ Preparation are undertaken by different Architectural Project Teams.
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
by Archt. Armando Dominador N. ALLI
PRBoA
IAPOA
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
c. When submitting bids for architectural services for either government or private projects, cite both the applicable Intellectual
Property Code of 1997 (RA 8293) and RA 9266 provisions concerning ownership and copyright of the architectural documents;
_____________________________________________________________________________________________________________________________ _________________________
d. Both RA 9266 and its IRR and the IRR of RA 9184 (Government Procurement Reform Act/ GPRA of 2003) prohibit the requirement, preparation and submission of architectural plans as part of the procurement process for consulting services.
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
_____________________________________________________________________________________________________________________________ _________________________
d. the training, stock knowledge, skill sets and applicable experiences of the Architect readily allows him to assume the role of Lead Professional for a building design or site/physical planning consultancy project.
by Archt. Armando Dominador N. ALLI
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
a. Traditionally, some Architects also acted as the Owners Representative for a building or site development project; as such, the Architect is the repository of the Clients trust; b. As Owners Representative, the Architect must therefore strive to protect the Clients interests at all times and must always make sure that these interests are not unduly nor unnecessarily compromised by the competing interests of the Constructor/ Subconstructors or even by the Architects very own interests; c. As the Owners Representative, the Architect must always try to be on the Clients side; however, if the Client is clearly wrong, the Architect must also strive to be impartial to properly balance the interests of the other parties in the Project; otherwise, the Architect
runs the risk of suit from such parties, particularly if the Architect is at fault; and
d. The Architect must also always keep in mind that Client interests are never above public interests which Architects must also uphold.
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
Where applicable, the dual concepts of ownership and copyright (under RA 8293 & RA 9266 & IRRs) must always be injected in the UAP Documents; e. Construction Arbitration and Mediation must be promoted as a mode of relief or Alternative Dispute Resolution (ADR, as prescribed under RA 9285 and its IRR) for all architectural service engagements; these ADR modes should be enshrined in architectural contracts to prevent costly non-time-bound litigation; f. There should be a UAP Document to cover the practice of Architects in Government Service, particularly since RA 9266 Section 35 mandates that all positions in the national and local governments that require the expertise of Architects must be filled by Architects by 10 April 2007; g. There may also be need for a UAP Document that specifically addresses group practice under a sole proprietorship (with associates), partnership, corporation and even joint venture arrangement; and h. UAP and other legitimate offeror Continuing Professional Education (CPD) Programs must lead to architectural practice specializations clearly spelled out in the UAP Documents i.e. interconnect/ interrelate the CPD programs with specializations and the various forms of architectural practice delineated under the UAP Documents. _____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
by Archt. Armando Dominador N. ALLI
PRBoA
IAPOA
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007
PRBoA
IAPOA
Thank You
and a Pleasant Afternoon to You All!
_____________________________________________________________________________________________________________________________ _________________________
Amending the UAP Documents (with Focus on Design Services/ Fees) 23 February 2007