Pre-ATP Checklist (Final) 6561

1. The document contains a checklist for site acceptance with 25 items to verify, including alarms, grounding, equipment status, hardware installation, labeling, and more. 2. Key site equipment readings like antenna VSWR values, carrier output power levels, and battery voltages before and after power removal are reported. 3. Huawei technicians have verified all checklist items and provided remarks for each one. Readings are within normal and extreme ranges specified.

Uploaded by

Azfar Shabbir
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
314 views4 pages

Pre-ATP Checklist (Final) 6561

1. The document contains a checklist for site acceptance with 25 items to verify, including alarms, grounding, equipment status, hardware installation, labeling, and more. 2. Key site equipment readings like antenna VSWR values, carrier output power levels, and battery voltages before and after power removal are reported. 3. Huawei technicians have verified all checklist items and provided remarks for each one. Readings are within normal and extreme ranges specified.

Uploaded by

Azfar Shabbir
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

S.

No
1 2 3 4 5 6

Checklist
All External Alarms (EAS) are functional and reported to NOC Ensure that E2E Equipment grounding is available & connected - (Standalone sites only) No Equipment alarms on BTS, Rectifier and MW (Cross Check from NOC) Condition of Battery (Swollen/ Normal/ leakage/ any other damage) MDG Available, fully commissioned & Operational (in case of Commercial Power unavailability - Standalone Site) with Operator Air conditioners must be installed, commissioned & operational with functional sequence controller (Indoor Sites) Intermediate BTS or MW chain/ring through which the transmission media of subject site is backhauled should all be in proper Atped & Commercially Launched status. Also, any Microwave Repeater(s) involved in Transmission backhaul of subject site should be in proper operation status with their EAS already reported in NOC. Struts installed for Microwave Dishes > 0.6m in diameter Microwave Link RSL as per Link Budget value. NMS Integration for new site microwave links (RTN Chain/Ring) Proper implementation of RF antenna, feeders and MW dishes VSWR values within acceptable range. Power test values within acceptable range Battery test values within acceptable range BTS installed according to site Site Layout All RF & trunk cables connectors are firmly installed All installed TE equipment is without any physical damage Check that the bending radius of all feeders are greater than 250 mm (no sharp bends) Check sector Swapping Provide and paste the Mux plan/E1 record end to end on Site Site hardware installation & configuration is as per plan, confirm from BSC and on site Microwave equipment is as per Board plan Power cables and Signals cables are routed separately Proper labeling/tagging of E2E connectivity (in case of chain/ring backhauled media)

Huawei Remarks
Not Aplicable(internal all alrams ok) OK OK OK OK N/A

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

OK 0.6M OK OK OK OK OK OK OK OK OK OK OK OK ROT PLAN OK OK OK OK OK

Cell

Cell1

Cell2

Cell3

Antenna VSWR Test result: Feeder VSWR Cell1A 1.26 Cell1B 1.28 Cell1C 1.29 Cell1D 1.31 Cell1E Cell1F Cell2A 1.28 Cell2B 1.3 Cell2C 1.31 Cell2D 1.33 Cell2E Cell2F Cell3A 1.12 Cell3B 1.25 Cell3C 1.31 Cell3D 1.29 Cell3E Cell3F

BAND 900M 900M 1800M 1800M

Carrier TYPE DRFU DRFU DRFU DRFU

Coupling System No combining Combining No combining Combining

ToC Output Power(W) 45W 20W 40W 18W

DRFU ToC Output Power(dBm) 44.52 45.01 44.03 42.55


Measured value 42 41 42 44 41 42 42 44 44 41 42 41

Power Output Range(Normal) 2.0 dB 44.52 ~ 48.52 41.01 ~ 45.01 44.02 ~ 48.02 40.55 ~ 44.55

Power Output Range(Extreme) 2.5 dB 44.02 ~ 49.02 40.51 ~ 45.51 42.52 ~ 48.52 40.05 ~ 45.05

TRX No. DTRU Type Combine Mode Normal Range(dBm) 0 1 2 2 4 5 6 7 8 9 10 11

20W 20W 20W 20W 20W 20W 18W 18W 18W 18W 18W 18W

No Combining No Combining No Combining No Combining No Combining No Combining No Combining No Combining No Combining No Combining No Combining No Combining

41.045.0 41.045.0 41.045.0 41.045.0 41.045.0 41.045.0

40.55 ~ 44.55 40.55 ~ 44.56 40.55 ~ 44.57 40.55 ~ 44.58 40.55 ~ 44.59 40.55 ~ 44.60

Battery No. Before AC off (V) ALL 54.5 Bank 1 54.5 1 13.4 2 13.4 3 13.4 4 13.4 Bank 2 54.5 1 13.4 2 13.4 3 13.4 4 13.4 Bank 3 54.5 1 13.4 2 13.4 3 13.4 13.4 4 Bank 4 54.5 1 13.4 2 13.4 3 13.4 13.4 4 Bank 5 54.5 1 13.4 2 13.4 3 13.4 13.4 4

After AC off 0 min(V)

Discharging 30 min(V)Discharging 60 min(V)

54.3 54.3 13.2 13.4 13.4 13.4 54.3 13.2 13.4 13.4 13.4 54.3 13.2 13.4 13.4 13.4 54.3 13.2 13.4 13.4 13.4 54.3 13.2 13.4 13.4 13.4

53.7 53.7 13.3 13.3 13.3 13.3 53.7 13.3 13.3 13.3 13.3 53.7 13.3 13.3 13.3 13.3 53.7 13.3 13.3 13.3 13.3 53.7 13.3 13.3 13.3 13.3

53.3 53.3 13 13 13 13 53.3 13 13 13 13 53.3 13 13 13 13 53.3 13 13 13 13 53.3 13 13 13 13