Problem Resolution Process
Problem Resolution Process
Ltd
Problem Description: Describe the problem (Only one problem per report at a time. File separate reports for multiple problems) Setup Figures etc as applicable Configuration details as a defined in the table Local System mode Clock VBD 8:1, 10:1 etc enable/disable If Enabled, VBD Max Calls Remote System mode Clock VBD 8:1, 10:1 etc enable/disable If Enabled, VBD Max Calls
Steps to reproduce the problem Describe the steps; use bullets/numbers for the steps Related logs Attach the logs or give link Example: Link: \\brahmavidya\ For log file names, use self descriptive names and dates. Dont use log1, log2 etc which are repetitive Additional details Further clarifications, observations etc may be added here. Please give the date when these details were added. Company Confidential August 29, 2008
Telsima Communications Pvt. Ltd Document History Version Created by Number 1.0 Mahadevan, Balaji and Srinivas CV Approved by Mahadevan Approved Date 29 Aug 2008