VNX5300 Add IO Module
VNX5300 Add IO Module
Your Configuration is: Add Ultraflex I/O module in a DPE Model - VNX5300 Storage Type - VNX for Block (SAN) Document ID -1328554882906
Reporting Problems To send comments or report errors regarding this document, please email: [email protected]. For Issues not related to this document, contact your service provider. Refer to Document ID: 1328554882906 Content Creation Date Mon Feb 06 14:01:47 EST 2012
EMC VNX Series Adding I/O modules and SFPs to the DPE
This document describes how to use the I/O Module and SFP Installation wizard in Unisphere Service Manager (USM) to install the following:
Any I/O modules to an EMC VNX5300 for Block disk processor enclosure (DPE). You must add I/O modules to a storage system in pairs of the same type of module. One module in a pair is for an I/O slot in SP A and the other module in the pair is for the corresponding I/O slot in SP B. Small form-factor pluggable connectors (SFPs) in Ultraflex I/O modules
CAUTION This procedure involves SP reboots coordinated to ensure that at least one SP is running at all times. During an SP reboot, data is unavailable to the front-end or back-end connections that are not duplicated on the peer SP.
Note: Do not completely remove assembly- or enclosure-level hardware from the system or rack unless specifically directed. Figures in this procedure depict hardware completely removed to increase their clarity.
Topics include:
Handling replaceable units....................................................................................................................................3 Summary of tasks for adding I/O modules or SFP modules............................................................................5 Identifying available I/O module slots.................................................................................................................6 Downloading and installing the Unisphere Service Manager..........................................................................8 Running the I/O Module and SFP Installation wizard......................................................................................9 Your comments......................................................................................................................................................10
Provide enough room to work on the equipment. Clear the work site of any unnecessary materials or materials that naturally build up electrostatic charge, such as foam packaging, foam cups, cellophane wrappers, and similar items. Do not remove replacement or upgrade units from their antistatic packaging until you are ready to install them. Gather the ESD kit and all other materials before servicing any units. After servicing begins, avoid moving away from the work site; otherwise, you might build up an electrostatic charge. Use the ESD kit when handling any units. If an emergency arises and the ESD kit is not available, follow the procedures in Emergency procedures (without an ESD kit) on page 3 Use the ESD wristband that is supplied with the server. To use it, attach the clip of the ESD wristband (strap) to any bare (unpainted) metal on the cabinet or enclosure, and then put the wristband around your wrist with the metal button against your skin.
Before touching any unit, touch a bare (unpainted) metal surface of the enclosure. Before removing any unit from its antistatic bag, place one hand firmly on a bare metal surface of the enclosure, and at the same time, pick up the unit while it is still sealed in the antistatic bag. Once you have done this, do not move around the room or touch other furnishings, personnel, or surfaces until you have installed the unit When you remove a unit from the antistatic bag, avoid touching any electronic components and circuits on it. If you must move around the room or touch other surfaces before installing a unit, first place the unit back in the antistatic bag. When you are ready again to install the unit, repeat these procedures.
Do not remove a faulty CRU from the cabinet until you have the replacement available. Handle a CRU only when wearing an ESD wristband (strap).
Attach the clip of the ESD wristband to the ESD bracket or bare metal on a cabinet enclosure. Wrap the ESD wristband around your wrist with the metal button against your skin.
Handle a CRU gently. A sudden jar, drop, or vibration can permanently damage some CRUs. Never use excessive force to remove or install a CRU. Take time to read the instructions carefully. Store a CRU in the antistatic bag and the specially designed shipping container in which you received it. Use the antistatic bag and special shipping container when you need to return the CRU.
CAUTION A sudden jar, drop, or even a moderate vibration can permanently damage some sensitive FRUs.
Never use excessive force to remove or install a CRU. Take time to read the instructions carefully. Store a CRU in the antistatic bag and the specially designed shipping container in which you received it. Use the antistatic bag and special shipping container when you need to return the CRU.
CAUTION Some CRUs have the majority of their weight in the rear of the component. Ensure that the back end of the CRU is supported while installing or removing it. Dropping a CRU could result in personal injury or damage to the equipment.
A0-A1
B0-B1
Important: Always install I/O modules in pairs - one module in SP A and one module in SP B. Both SPs must have the same type of I/O modules in the same slots.
10-Gb/s Fibre Channel over Ethernet (FCoE) with two optical/Active Twin-Ax FCoE front-end (FE) ports for network server FCoE I/O connections. 8-Gb/s Fibre Channel with four optical front-end (FE) ports for server I/O connections (connection to a switch or server HBA). 1-Gb/s Ethernet (1 GbE) with four RJ-45 front-end (FE) ports for server I/O connections (connection to a network switch, router, server NIC or iSCSI HBA) 10-Gb/s Ethernet (10 GbE) iSCSI modules with two optical/Active Twin-Ax iSCSI front-end (FE) ports for network server iSCSI I/O connections (connection to a network switch, router, server NIC or iSCSI HBA).
Table 2 on page 6 lists the I/O modules available for the storage system and the number of each module that is standard and/or optional.
Table 2. I/O modules per SP in DPE Number of modules per SP in a VNX5300 Module 8 Gb FC module: 4 FE ports (0, 1, 2, 3) 1 GbE iSCSI module: 4 FE ports (0, 1, 2, 3)
1
Standard 0
Optional 1
Six ports (four Fibre Channel and two SAS) are embedded in each SP.
Table 2. I/O modules per SP in DPE (continued) Number of modules per SP in a VNX5300 Module 10 GbE iSCSI module: 2 FE ports (0, 1) 10 Gb FCoE module: 2 FE ports (0, 1) 0 1 Standard 0 Optional 1
If the server is running an earlier version of the JRE, select Yes when asked if you want to continue with the installation. The installation wizard prompts you to download and install the latest supported version of the JRE from the Sun website.
If the server is running a later version of the JRE, the installation wizard asks if you want to continue with the installation. Select Yes to continue or No to quit the installation.
Important: If you select Yes, the USM may not work properly with a later JRE version. If you select No, and manually remove the later version of the JRE, other applications that require this version may not work properly.
Your comments
Your comments
Your suggestions will help us continue to improve the accuracy, organization, and overall quality of the user publications. Please send your opinion of this document to:
[email protected]
10
Copyright 2011 - 2012 EMC Corporation. All rights reserved. Published January 2012 EMC believes the information in this publication is accurate as of its publication date. The information is subject to change without notice. THE INFORMATION IN THIS PUBLICATION IS PROVIDED "AS IS." EMC CORPORATION MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND WITH RESPECT TO THE INFORMATION IN THIS PUBLICATION, AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Use, copying, and distribution of any EMC software described in this publication requires an applicable software license. For the most up-to-date regulatory document for your product line, go to the Technical Documentation and Advisories section on EMC Powerlink. For the most up-to-date listing of EMC product names, see EMC Corporation Trademarks on EMC.com. All other trademarks used herein are the property of their respective owners. Corporate Headquarters: Hopkinton, MA 01748-9103
11