This addition on the east side of the existing Dennis DeConcini Environment and Natural Resources Building will further interdisciplinary research in earth, environmental, natural resources, atmospheric, mathematical, and related sciences. The building will primarily provide faculty offices, conferencing and support spaces with some related research and instructional dry laboratory and work space. A large classroom addition will meet the UA's critical need to teach an increasing number of students with decreasing State funding for faculty support.
Page 1 of 18 03-8526
D - Design CMR Carr TBD Andrew Comrie
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:
85,140
GSF:
04-8537
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Helentjaris Kraft Corral
131,652
GSF:
85
05-8623
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design CMR Vos TBD
STATUS
The project has been placed in the first year of the FY 2013-2015 Capital Improvement Plan. An RFQ for NASF: Design Professional Services is being finalized and will soon be released to initiate the consultant Current Budget: selection process.
GSF:
0 $100,000 $60,000,000
07-8770
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: AR7 Architects P C Contractor: Core Construction O - Occupancy CMR Johnson Marsh Jim Van Arsdel
STATUS
Buildings are substantially complete and occupied.
212,025
GSF:
132
133
Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements Bryant Bannister Tree-Ring Building
DESCRIPTION Project Status: The Laboratory of Tree-Ring Research (LTRR) has been housed in the West Stadium for more than 70 Project Delivery Method: years, with minimal improvements to their facilities. This project will provide new laboratories and offices to house the LTRR's diverse array of research programs, as well as public outreach and support spaces. PDC Design Project Manager: The project is the first phase of a long-term effort to relocate the entire LTRR into contemporary facilities. PDC Fac Project Manager: Minor renovations of space at the Math East building is included in the project. User Representative:
Page 2 of 18 08-8826
C - Construction CMR Mackey Kraft Tom Swetnam
DP: Richard & Bauer Architecture Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Building pad is about complete. Gas line relocation and temporary water line are complete.Permanent water line relocation review is in progress at C.O.T. Elevator pit and basement level stairwell walls are complete. Caissons are complete. Structural steel frame and metal deck work is in progress. Design work and delta pricing is nearly complete.
17,300
GSF:
45.02
09-8900
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Mackey Bagnoche Tierney
151,000
GSF:
09-8902
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: Mortenson Construction C - Construction CMR Vos Dolan
STATUS
Demolition and site clearing work complete. Foundatiion caissons are complete. Site utility work, foundation grade beams and underground electrical rough-in is onging.
140,589
GSF:
10-8988
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Mackey Bagnoche Tierney
12,100
GSF:
Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements University of Arizona Cancer Center - Phoenix
DESCRIPTION Project Status: This new facility will provide the highest quality cancer research and care with an evidence-based, Project Delivery Method: multi-disciplinary model, along with the modern technologies, and a compassionate patient-centered approach. The building will be located at 625 N. 6th St, on the northwest corner of Fillmore and Seventh PDC Design Project Manager: PDC Fac Project Manager: Streets on the downtown Phoenix Biomedical Campus. User Representative:
Page 3 of 18 10-9001
D - Design Design/Build Carr Bagnoche Tierney
164,614
GSF:
11-9023
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Galda TBD
STATUS
Selection process is underway for facilities programming.
GSF: $43,000 $0
12-9134
D - Design CMR Johnson TBD
Infrastructure Phase 7
DESCRIPTION
Campus infrastructure improvements will support the development of the new Engineering Research Building, Bioscience Research Labs, and other campus growth to occur north of Speedway Boulevard. This infrastructure project will include the development of critical sewer and electrical system capacity increases in the specified area.
12-9135
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design CMR Banks TBD
STATUS
RFQ for design services is being prepared.
GSF: $0 $32,000,000
Apr 2012 Planning, Design & Construction -- Project Status Report - Capital Improvements Bear Down Gymnasium, Renovations and Addition
DESCRIPTION
The Bear Down Gymnasium is a significant West Campus National Historic District structure that requires considerable repairs and upgrades. This project includes the adaptive reuse of the historic facility, as well as a south-side addition. The project could include a variety of health and wellness, research and classroom uses.
Page 4 of 18 12-9151
D - Design Banks TBD
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Tyndall Avenue Enhancement
DESCRIPTION Project Status: Tyndall Avenue Enhancements is a joint project with the City of Tucson to improve multi-modal circulation Project Delivery Method: on the street. Extent of the project is from 6th Street to University Boulevard. Reconstruction of the PDC Design Project Manager: campus street will include new pavement, curbs, bicycle lanes, sidewalks, pedestrian crossings, and PDC Fac Project Manager: landscape. The Tucson Dept. of Transportation is managing this project. The project is funded by a federal transportation grant. The University budget is for matching funds. User Representative:
Page 5 of 18 01-8316
O - Occupancy Design/Bid/Build Novak Kraft
08-8847
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: C - Construction P/DBF Banks Banks Blandeburgo
STATUS
Installations at Student Recreation Center, McClelland Hall, McClelland Park and Mary Roby Gymnastics NASF: buildings are operational. Current Budget: Final design is documentation for the Villa Del Puente solar project is being reviewed.
10-8958
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction P/DBF Banks Banks Bruce Wright
DP: Wood, Patel & Associates Inc Contractor: S Q P Construction dba Safety Quality Produ STATUS
Phase II construction is in progress.
10-8983
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design McCormick McCormick
STATUS
Draft GeoDatabase completed and work is underway on revised version; data elements from collaborating departments being integrated. Design for internal Interactive Web Map is underway, building on prototyping for a public web map. CAD integration tasks have begun.
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Park Student Union
DESCRIPTION Project Status: The Park Student Union has been serving the southwest quadrant of campus since the mid-1960s. The Project Delivery Method: on-campus residential population of this area is continuing to increase and evolve. A recent expansion of PDC Design Project Manager: the Park Union provided additional space, but was not successful in re-positioning the PSU within the PDC Fac Project Manager: market. Additionally, the original 1960s facility remains in need of significant improvements. User Representative:
Page 6 of 18 10-8990
D - Design Gajdorus TBD Joe Sottosanti
GSF:
0 $90,000
10-8991
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Vos Dolan
GSF:
10-9016
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction Mackey Wilt Heineking
GSF: $31,625 $0
11-9024
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design McCormick TBD
STATUS
A project consultant has been selected and a project scope is being refined.
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Mathematics Facility, Planning Analysis
DESCRIPTION
Planning study to review the space requirements and explore alternatives for accommodating the Department of Mathematics and related departments. The review will include campus planning and growth options within the context of the University's Comprehensive Campus Plan.
Page 7 of 18 11-9025
D - Design Galda TBD
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:
STATUS
Program is substantially complete, with administrative review pending.
11-9028
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Novak Novak
STATUS
Developing landscape treatment options.
11-9030
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Mackey Mackey
STATUS
Consultant has been selected.
GSF: $46,000
11-9031
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Helentjaris Kraft
DP: Burns Wald-Hopkins Shambach Architects Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
The project is complete.
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Steward Observatory, IT Closet Upgrades
DESCRIPTION
Project will upgrade the existing IT Closets in rooms 251, 353A, 453 and 551. Consideration is under investigation to add rooms 208, 314 and 420. This work will include Cooling, Outlets and Grounding.
Page 8 of 18 11-9032
O - Occupancy Job Order Contract Cousy Cousy David Lane
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: Sturgeon Electric Co Inc
STATUS
The project is completed
GSF:
11-9033
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: O - Occupancy Banks Banks Blandeburgo
STATUS
Construction is complete.
11-9034
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Design/Bid/Build Banks Banks
DP: Turner Structural Engineering Co Contractor: LVI Environmental Services Inc STATUS
Equipment removal is complete.
11-9036
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Carr Carr
DP: Burns Wald-Hopkins Shambach Architects Contractor: Hickam Arnold and Associates LLC dba Hick STATUS
Construction Documents for Phase 2, Second Floor are in progress. Security camera installation and exterior lighting resolution is underway.
20,600
GSF:
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Cannon-Douglass House, Rehabilitation
DESCRIPTION Project Status: Historic preservation of the Cannon-Douglass House located at 1189 E Speedway Boulevard. The Project Delivery Method: Cannon-Douglass House is on the National Register of Historic Buildings and will be restored for use for PDC Design Project Manager: CALA. Offices, student and program space. PDC Fac Project Manager: User Representative:
Page 9 of 18 11-9038
O - Occupancy Job Order Contract Carr Carr
DP: Burns Wald-Hopkins Shambach Architects Contractor: Division II Construction Co Inc STATUS
Project is completed, Close-out is in progress.
1,545
GSF:
11-9049
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Banks Banks Robert Sommerfeld
GSF:
0 $235,000 $404,000
AHSC, Renovate Surgery Offices 4th & 5th Floors Phases 3 & 4
DESCRIPTION
Conversion of old lab and office space into offices on the 4th floor of Clinical Sciences at Arizona Health Sciences Center (AHSC) for the Department of Surgery Transplant, ENT and Plastic Surgery sections will improve space efficiency, provide much needed space for recently hired researchers and faculty, and consolidate office and support for several surgery programs.
11-9051
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction Job Order Contract Carr Kraft Souza
GSF:
11-9054
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Banks Banks Bowles
GSF:
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Pharmacy, IT Closet Upgrades
DESCRIPTION Project Status: Upgrades to the Pharmacy building will offer increased telecommunications capabilities. Rooms 221 and Project Delivery Method: 319B will be converted from storage and office space to dedicated telecommunications rooms. Work will PDC Design Project Manager: include electrical and HVAC upgrades, and replacement of a moveable partition wall with a permanent PDC Fac Project Manager: wall. User Representative: DP: Contractor: Sturgeon Electric Co Inc STATUS
Construction is completed
Page 10 of 18 11-9056
O - Occupancy Job Order Contract Cousy Cousy D. Lane
298
GSF:
11-9057
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: C - Construction CMR Gajdorus Gajdorus Stephen DeLong
DP: M3 Engineering & Technology Corp Contractor: Lloyd Construction Co Inc STATUS
Tray 1 is essentially complete. The irrigation system, the personnel transporter, and the load cells, remain to be installed. Structural steel for Tray 2 has been erected. Installation of steel deck is in progress. Cement board, waterproofing, and soil and intrumentation placement will follow.
11-9058
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Johnson Wilt
DP: AAD: Fitch Inc. dba Fitch Inc. Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Patio shade structure and infrastructure documents being completed for final review and pricing.
11-9061
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Desman Associates Contractor: D - Design Job Order Contract Gajdorus TBD Mike Delahanty
STATUS
Construction documents are complete, and are being reviewed by the University. The selected JOC Contractor is pricing the project.
228,803
GSF:
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Main Library, Bookends Cafe Renovations
DESCRIPTION Project Status: The proposed project is in the Main Library, Building 55, 1510 E. University Boulevard. The scope of Project Delivery Method: work is to upgrade and expand the Bookends Caf to create exterior dining space on the east side of the caf, enclose a portion of the west patio dining to expand the interior footprint of the caf, add a grill and PDC Design Project Manager: PDC Fac Project Manager: re-organize the food prep and product layout. User Representative:
Page 11 of 18 11-9063
D - Design Johnson Dolan
11-9071
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: D - Design Vos TBD Sotosanti
STATUS
The project status and schedule mirrors the status and schedule of the Project 09-8902 Arizona Stadium NASF: North End-Zone Expansion. SU Food Service tenant improvements will be designed and constructed to Current Budget: support the larger stadium expansion project.
11-9073
D - Design Vos Kraft
1,776
GSF:
11-9074
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: Sturgeon Electric Co Inc O - Occupancy Job Order Contract Kraft Kraft
STATUS
The two new parking lots on the north side of Campus are paved and open. Lighting is completed. Resurfacing of six existing parking lots and the repaving of the entrances to the Sixth Street and Park Avenue Garages are completed.
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Arizona Stadium, Renovate Suites 224,325B,325C
DESCRIPTION
Install electric operable windows and shades in three skybox seating areas at the Arizona Stadium, including the President's Suite 325B, Rodgers' Suite 224 and Alumni Suite 325C.
Page 12 of 18 11-9087
O - Occupancy Job Order Contract Dolan Dolan
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:
GSF:
12-0574
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Banks Banks John Adams
STATUS
Structural design documentation is being reviewed.
GSF: $2,000
12-9090
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Job Order Contract Gajdorus TBD Debby Shively
STATUS
A design consultant has been selected, and the fee is being finalized. Initial image concepts will be developed. An updated layout, fixture package, and budgetary estimates, will be prepared for review by the UA Bookstore and their partners at Intercollegiate Athletics.
1,500
GSF:
12-9094
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Banks Banks Dante Lauretta
DP: A B A Architects P.C. Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Clean Room construction is in progress.
GSF:
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Wm J Parker Agricultural Research Complex, Finish Shell Space Phase II
DESCRIPTION Project Status: The William J. Parker Agricultural Research Complex was constructed with a significant amount of shell Project Delivery Method: space, so the facility could be quickly adapted to evolving future research demands. Some of that shell space was completed several years ago. This project will finish the remainder of the available space, as PDC Design Project Manager: PDC Fac Project Manager: well as develop new exterior dairy facilities, to address the current needs of the College of Agriculture and Life Sciences. User Representative:
Page 13 of 18 12-9095
D - Design CMR Gajdorus TBD Robert Collier
55,700
GSF:
55,700 $30,000
12-9098
D - Design Job Order Contract Johnson Wilt
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:
DP: Merry Carnell Schlecht Inc Contractor: R W Burkel Contracting Inc STATUS
Demolition has begun. Construction to start April, 2012.
1,000
GSF:
12-9099
D - Design Job Order Contract Gajdorus TBD Steve Kozachik
GSF: $200,000
12-9100
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: O - Occupancy Job Order Contract Johnson Dolan
DP: AAD: Fitch Inc. dba Fitch Inc. Contractor: Martin Lang Construction LLC dba Lang Wya STATUS
Project is complete and closed out.
960
GSF:
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Biomedical Research Laboratory, MRI Equipment Installation
DESCRIPTION
Renovation of space at the Biomedical Research Laboratory for installation of MRI equipment for the Department of Radiology.
Page 14 of 18 12-9121
D - Design Job Order Contract Banks Banks Angie Souza
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative:
12-9122
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: D - Design Vos TBD Perrin
STATUS
Pre-finalized draft of Feasibility Study completed and is pending final review and approval of ICA prior to issuing finalized Study.
GSF: $123,000
12-9125
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: D - Design Job Order Contract Lynn Lynn Bruce Hille
DP: G L H N Architects And Engineers Contractor: Sun Mechanical Contracting Inc STATUS
Drawings completed and Construction is proceeding
6,000
GSF:
12-9126
D - Design Job Order Contract Johnson Wilt
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Arizona Stadium, South End Zone Seating Expansion
DESCRIPTION
Extension of the existing south end zone seats to replace bleachers (Red Zone) removed to install the new video board.
Page 15 of 18 12-9130
D - Design CMR Vos TBD
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Heery International Inc Contractor: Mortenson Construction
STATUS
Construction Documentation and Permitting complete. Construction pricing is pending with construction to be scheduled parallel with the North End-Zone Expansion project's seating expansion.
12-9131
D - Design Lynn Lynn Ruddy
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:
STATUS
Design Complete - JOC proposal being prepared
12-9136
D - Design Gajdorus TBD
12-9138
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Rob Paulus Architects, Ltd. Contractor: D - Design Carr TBD
STATUS
The development of a conceptual program and graphics for fundraising purposes is underway.
GSF: $50,000
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Education, World of Words Renovate 4th Flr Library
DESCRIPTION Project Status: Renovation of approximately 5,88 sf of existing fourth floor space (formerly Education Library) into a Project Delivery Method: library for the Colleges' International Collection of Children's and Adolescent Literature (World of Words). Spaces include collection, reading, special collection, art studio and classroom and support spaces. The PDC Design Project Manager: PDC Fac Project Manager: project is funded by the College of Education. User Representative: DP: Contractor: STATUS
The project is awaiting Budget Authority for the Design Phase.
Page 16 of 18 12-9139
D - Design Carr TBD
GSF:
12-9140
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Johnson TBD
12-9141
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Lynn TBD Alex Blandeburgo
STATUS
Data collection is proceeding
12-9142
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: C - Construction Job Order Contract Marker Marker David Lane
STATUS
Preconstruction Meeting is complete and the NTP has been issued.
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Schaefer Building, Humidity Control Modifications
DESCRIPTION Project Status: Modification of the Poetry Center Special Collections / Archive Areas at the Schaefer Building to enhance Project Delivery Method: the existing HVAC system capability and performance, and provide more stringent and accurate humidity PDC Design Project Manager: control. PDC Fac Project Manager: User Representative: DP: Contractor: STATUS
Work order issued
Page 17 of 18 12-9146
D - Design Job Order Contract Lynn Lynn
12-9148
D - Design Galda TBD
$0
12-9149
D - Design Dolan Dolan
GSF: $0
12-9150
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor: D - Design Job Order Contract Gray Gray
STATUS
The off-cycle Construction Decision Package and the request for funding have been submitted for approval.
GSF: $0
Apr 2012 Planning, Design & Construction -- Project Status Report - CDP Red Rock / Campus Agricultural Centers, Install PV Arrays
DESCRIPTION
The department of Planning, Design & Construction will provide design, engineering and inspection services for the installation of photovoltaic arrays at the Red Rock and Campus Agricultural Centers.
Page 18 of 18 66-9673
C - Construction Banks Banks Ryan
Project Status: Project Delivery Method: PDC Design Project Manager: PDC Fac Project Manager: User Representative: DP: Contractor:
STATUS
Installation of Red Rock PV systems and Campus Agricultural Center is complete and operational. PV system for West Campus Agricultural Centers is in design.
GSF: $30,000 $0
68-3842
C - Construction Banks Banks Steve Husman
STATUS
Greenhouse construction is complete.
GSF: $1,500