Request For Inspection: Reset Data Print

This document is a Request for Inspection (RFI No. C-371) for a service building project by Saudi Aramco, scheduled for inspection on April 26, 2022, at 10:00 AM. The inspection is required for the Saudi Aramco Submarine Cables Warehouse and involves MRI epoxy coated rebars. The document includes verification from both the proponent representative and the contractor regarding the readiness and compliance of the work for inspection.

Uploaded by

javed iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Request For Inspection: Reset Data Print

This document is a Request for Inspection (RFI No. C-371) for a service building project by Saudi Aramco, scheduled for inspection on April 26, 2022, at 10:00 AM. The inspection is required for the Saudi Aramco Submarine Cables Warehouse and involves MRI epoxy coated rebars. The document includes verification from both the proponent representative and the contractor regarding the readiness and compliance of the work for inspection.

Uploaded by

javed iqbal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Print ReSet Data eMail Data... Save Data...

REQUEST FOR INSPECTION


Saudi Aramco 6717-2-ENG (08/07) (Inspection Department Ref: SAEP 1150 & 309) RFI No. C-371

RPO: 6600046640 BI: 10-02304 W/O: 03 Title: Service Building

To: Inspection Unit/Mr. Abdullah M. Al-Enezi ✔ Civil Mech. Plumb. Comms. Elect. Other

Inspection/monitoring is required on (date) 04/26/2022 at (time) 10:00 prior to installation


For the following location/equipment Saudi ARAMCO Submarine Cables Warehouse at Tanajib Marine Complex, Plant ID # M13.

Work Permit required: Yes ✔ No Project Quality Plan: Hold Point ✔ Witness Point

Proponent representative has verified that the Work is ready for CONTRACTOR has verified that the Work to be inspected is
inspection and conforms to the project requirements. complete and in compliance with the following specifications:

SAES/SAMS/Other # SATIP-Q-001-02/SAIC-Q-1007/2.1
Representative Name: Hmoud T. Al-Qahtani, SAPMT
Signature Date: Contractor/Company Al-Falak Co. (FSA-311)

Telephone: Fax: QA/QC Name Rashid Hussain

QA/QC Signature Date

This form was received by the undersigned Inspection Unit Employee:

Name: Abdullah M. Al-Enezi


� Sign. Date: Time:

Inspector Arrived on site: Inspector Left Site:


Time nearest 1/2 hour

Concurrence S.A. Proponent: Badge#:

Work Description: MRI epoxy coated rebars 10mm dia., 12m length ASTM A775M, ASTM A615M, Gr. 60, Qty. 3.0 MT as per attached documents
PO # 22002212, SDN # 2022-0651, Material technical approval MR # 028, Supplier/Mnf.: Steel Pioneer Factory, Jubail.

Distribution:
Original - Inspection Unit 1st Copy - RPO Proponent 2nd Copy - ID Coordinator 3rd Copy - Construction Contractor