East Silver Spring: Master Plan Review
East Silver Spring: Master Plan Review
www.zoningmontgomery.org
BACKGROUND
ZONING CODE REWRITE
In 2007, the Montgomery County Council directed the Planning Department to undertake a comprehensive zoning ordinance rewrite. Last rewritten in 1977, the current 1,200 + page code is viewed as antiquated and hard to use with standards that have failed to keep pace with modern development practices. With only about four percent of land in the County available for greenfield development, the new zoning code can play a crucial role in guiding redevelopment to areas like surface parking lots and strip shopping centers. An updated zoning code is important for achieving the kind of growth Montgomery County policymakers and residents want. The Montgomery County Planning Department is working in coordination with Code Studio, a team of nationally recognized consultants; a citizen panel, known as the Zoning Advisory Panel (ZAP); and other County agencies to improve the zoning code. The ZAP was appointed by the Planning Board to weigh in on the projects direction and advise staff.
Initial sections of the new code are drafted by Code Studio, and are subsequently analyzed and edited by planners based on feedback from ZAP, county agency representatives, residents and other stakeholders. The Zoning Code Rewrite drafts continue to undergo multiple reviews and revisions in preparation for the distribution of a public draft of the new code expected in summer 2012. The comprehensive public draft will then be presented to the Planning Board and, ultimately, the County Council as part of a public review process.
www.zoningmontgomery.org
EXAMPLES:
Agricultural And Rural
Rural Density Transfer (RDT) Agricultural Conservation (AC)
Residential, Detached Unit (R-60) Residential, Detached Unit (R-40) Residential, Mobile Home Development (RMH)
Residential
Industrial
Light Industrial (I-4) Proposal based on November 22, 2011 ZAP Review Draft
www.zoningmontgomery.org
Conversion Decision Criteria for C-1, Convenience Commercial Current Max FAR: None (90% Coverage) Current Max Height: 30 average at finished grade along the building up to 45
Then
Then
Then
www.zoningmontgomery.org
The Master Plan recommends preserving the existing residential character of East Silver Spring by providing a wider range of housing types in the area, encouraging maintenance of the housing stock, protecting historic resources, and limiting the concentration of special exception commercial uses along the highways between commercial centers. The Plan also recommends improving the neighborhoods commercial centers by revitalizing University Boulevard and expanding commercial uses in the Flower Village and Clifton Park Crossroads commercial centers. Protection of East Silver Springs community facilities, environmental resources, and parks are recommended through a variety of measures. The Plan advocates renovating existing facilities and providing new facilities for recreational programs, supporting an urban forestry concept, and improving community access to Northwest Branch and other stream valley parks.
University Boulevard Streetscape Concept
Lastly, the Master Plan seeks to ensure neighborhoodfriendly circulation and transportation opportunities. The Plan recommends supporting a system of sidewalks, paths, and bikeways for pedestrian use, improving traffic circulation, and expanding transit services.
Proposal based on November 22, 2011 ZAP Review Draft
www.zoningmontgomery.org
ZONE CONVERSION
The East Silver Spring Planning Area currently has 11 zones: 2 commercial and 9 residential.
Existing Residential: R-40: Residential, Detached Unit R-60: Residential, Detached Unit R-90: Residential, Detached Unit RT-8: Residential, Townhouse R-12.5: Residential, Townhouse R-10: Multiple-Family, High Density R-H: Multiple-Family, High-Rise Planned R-20: Multiple-Family, Medium Density R-30: Multiple-Family, Low Density Existing Commercial: C-1: Convenience Commercial O-M: Office Building, Moderate Intensity
The existing R-60 and existing R-40 have almost identical standards for detached houses. These zones will combine to form the proposed RMD-6 (Single-Family, Medium-Density) zone. The existing R-90 will convert to the propsed RMD-9 (Single-Family, Medium-Density) zone. The existing RT-8 will convert to the proposed TLD (Townhouse, Low-Density) and the existing RT-12.5 will convert to the proposed TMD (Townhouse, Medium-Density) zone. The R-10 and R-H, both multi-family residential zones, will be combined to form the proposed RHD-1 (Multi-Family, High-Density) zone. The R-20 will convert to the proposed RHD-2 zone (Multi-Family, Medium-Density) and the R-30 will convert to the proposed RHD-3 zone (Multi-Family, Low-Density). The existing C-1 zone will convert to the proposed zones (CRN or CRT) based on the location and context for each of the parcels located in the C-1 zone. Each parcels proximity to auto-centric localities, village and town centers, and detached residential neighborhoods was considered in the conversion decision, with the overall goal to retain currently allowed heights and densities and maintain context sensitivity. The existing O-M zone has typically consisted predominantly of office uses and will convert to the proposed Employment Office Zone (EOF) with a 1.0 FAR and 45 ft. maximum height limit.
www.zoningmontgomery.org
ZONE CONVERSION
Acres
42.1 1162.6 33.2 2.1 22.2 104.9 9.4 79.4 51.9 7.7 0.1
Acres
1204.7
Percent
79.5
Grand Total
1515.5
Grand Total
1515.5
www.zoningmontgomery.org
ZONE CONVERSION
www.zoningmontgomery.org
www.zoningmontgomery.org
Townhouse
RT-8 RT-12.5
Multi-Family
R-30 R-20 R-10 R-H
Long Branch Sector Plan
(underway)
Commercial
C-1 O-M
www.zoningmontgomery.org
Townhouse
TLD TMD
Multi-Family
RHD-3 RHD-2 RHD-1
Comm/ResNeighborhood
CRN
Comm/ResTown
CRT
Employment, Office
EOF
www.zoningmontgomery.org