0% found this document useful (0 votes)
47 views57 pages

04.10.2024 - RE Wall-VUP 378+576 (R0) - Ltr. No.-323

Uploaded by

bineetmishra1990
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views57 pages

04.10.2024 - RE Wall-VUP 378+576 (R0) - Ltr. No.-323

Uploaded by

bineetmishra1990
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 57

1 2 3 4 5 6 7 8

F
NOMENCLATURE OF DRAWINGS
PROJECT:
STATUS

®
CONSTRUCTION OF Reinforced Earth WALL FOR SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF NH-66 (OLD NH
-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA ON HYBRID
ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
STRUCTURE :- DRAWING STATUS :-
E

E
VUP AT CH: 378+576 ISSUE FOR APPROVAL

DESCRIPTION OF DRAWINGS:-
THE SET OF DRAWINGS FOR THE PROJECT COMPRISE OF FOLLOWING:
A n . DETAILS OF PANEL FACIA DRAWINGS INDICATING THE DIFFERENT TYPE OF PANELS, REINFORCEMENT DETAILS, MATERIAL DETAILS, ETC.
B n . GENERAL ARRANGEMENT DRAWINGS (GAD) INDICATING THE FRONT FACE ELEVATION OF THE STRUCTURE AND RELEVANT DETAILS.
Cn . GENERAL DETAILS DRAWINGS SHOWING CROSS-SECTION, PLAN AND OTHER MISCELLANEOUS DETAILS OF THE STRUCTURE(S)
D

D
Dn . DESIGN SECTION DRAWING SHOWING POLYMERIC STRAP REINFORCEMENT DETAILS AT SELECTED SECTIONS.
En . CONSTRUCTION METHODOLOGY AND SAFETY DRAWINGS.

S.NO. IN THIS
BUNCH DRAWING TITLE DRG NO. SHEET NO. DRG DATE REVISION REMARKS
MARK

C1 PLAN AT TOP OF Reinforced Earth® Wall TAInd-S/22946/378+576/PLAN-01 01 OF 01 13/12/2022 00

GENERAL ARRANGEMENT OF APPROACH RAMP


B1 (RIGHT HAND SIDE WALL - THALIKULAM END)
TAInd-S/22946/378+576/GA-01 01 TO 11 17/05/2024 01
C

C
GENERAL ARRANGEMENT OF APPROACH RAMP
B2 (LEFT HAND SIDE WALL - THALIKULAM END)
TAInd-S/22946/378+576/GA-02 01 TO 11 17/05/2024 01

GENERAL ARRANGEMENT OF APPROACH RAMP


B3 TAInd-S/22946/378+576/GA-03 01 TO 10 17/05/2024 01
(RIGHT HAND SIDE WALL - KODUNGALLUR END)

GENERAL ARRANGEMENT OF APPROACH RAMP


B4 TAInd-S/22946/378+576/GA-04 01 TO 09 17/05/2024 01
(LEFT HAND SIDE WALL - KODUNGALLUR END)

GENERAL ARRANGEMENT OF CLOSING WALL


B5 (VIEW A1- THALIKULAM END)
TAInd-S/22946/378+576/CW-01 01 OF 01 17/05/2024 01

GENERAL ARRANGEMENT OF CLOSING WALL


B

B
B6 (VIEW A2- KODUNGALLUR END)
TAInd-S/22946/378+576/CW-02 01 OF 01 17/05/2024 01

TYPICAL CROSS SECTION,CRASH BARRIER, CORNER


C2 LEVELLING PAD DETAIL GENERAL NOTES & MISC. DETAIL .
TAInd-S/22946/378+576/DET-01 01 TO 02 TO 04 17/05/2024 01

TYPICAL CROSS SECTION,CRASH BARRIER, CORNER


C3 LEVELLING PAD DETAIL GENERAL NOTES & MISC. DETAIL .
TAInd-S/22946/378+576/DET-01 03 OF 03 13/12/2022 00

TYPICAL CROSS SECTION,CRASH BARRIER, CORNER


C4 LEVELLING PAD DETAIL GENERAL NOTES & MISC. DETAIL .
TAInd-S/22946/378+576/DET-01 04 OF 04 17/05/2024 00

D1 DESIGN SECTION TAInd-S/22946/378+576/DS-01 01 TO 04 13/12/2022 00


A

A
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
A1 A2

378+576*(CH)
START OF RE WALL START OF RE WALL
LHS SERVICE ROAD ℄OF EXP. JT. ℄OF EXP. JT. LHS SERVICE ROAD

OF VUP

378593.700*(CH)
378558.300*(CH)
378562.050*(CH) 378589.950*(CH)
℄ OF BEARING. ℄ OF BEARING. LHS WALL TO KODUNGALLUR END
LHS WALL TO THALIKULAM END
REFER DRG NO.


REFER DRG NO. 378562.950*(CH) 378589.050*(CH)
TAInd-S/22946/378+576/GA-04
TAInd-S/22946/378+576/GA-02

'A' 'A'
E

E
TO KODUNGALLUR

TAInd-S/22946/378+576/CW-01

TAInd-S/22946/378+576/CW-02
CLOSING WALL VIEW - A1

CLOSING WALL VIEW - A2


A1

A2
REFER DRG NO.

REFER DRG NO.


D

D
TO THALIKULAM
C

C
'A' 'A'
378558.300*(CH)

378593.700*(CH)
RHS WALL TO THALIKULAM END RHS WALL TO KODUNGALLUR END
DETAIL-'A' REFER DRG NO.
REFER DRG NO. REFER DRG NO.
TAInd-S/22946/378+576/DET-01
TAInd-S/22946/378+576/GA-01 TAInd-S/22946/378+576/GA-03
(SH NO. 02 OF 03)

RHS SERVICE ROAD RHS SERVICE ROAD


START OF RE WALL START OF RE WALL
B

B
PLAN AT TOP OF Reinforced Earth® WALL

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:250 A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 13/12/2022
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/01
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/PLAN-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: R
PLAN AT TOP OF Reinforced Earth WALL
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTE:- LEGEND: TO THALIKULAM TO KODUNGALLUR

378+576*(CH)
CULVERT
℄OF BOX

℄OF VUP
F

F
CULVERT
℄OF BOX
CAUTION :-

GA-01 START OF RE Wall


A1 A2
END OF RE Wall
KEY PLAN
* (N.T.S.)
E

E
START OF RE WALL
MATCHLINE-01

A1
TO THALIKULAM ℄OF EXP.GAP JT.
378562.050*(CH)
℄ OF BRG.
378562.950*(CH)
D

D
TAInd-S/22946/378+576/CW-01
CLOSING WALL VIEW - A1
1

REFER DRG NO.


1
A1

SRL

OGL 3.528*
PILE CAP
TOP LEVEL
3.200 'SP2'
PCC
C

C
LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
NOTE:- TOP 3 LAYERS 6.4M TOP 2 LAYERS 7.2M TOP 2 LAYERS 7.3M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, MIDDLE 5 LAYERS 6.3M MIDDLE 1 LAYER 6.5M MIDDLE 3 LAYERS 6.6M
LENGTH OF POLYMERIC STRAPS
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND BOTTOM 3 LAYERS 5.9M BOTTOM 8 LAYERS 6.4M BOTTOM 6 LAYERS 6.4M
SETTLEMENT REQUIREMENTS ARE SATISFIED REFER DESIGN SECTION-17 REFER DESIGN SECTION-18 REFER DESIGN SECTION-18A
qult = 580.44 kPa qult = 604.52 kPa qult = 628.610 kPa
DISCLAIMER: TOP 3 LAYERS 6.6M
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision DEVELOPED APPROACH ELEVATION (PART 1)
MIDDLE 5 LAYERS 6.3M
(RIGHT HAND SIDE WALL - THALIKULAM END)
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August BOTTOM 3 LAYERS 5.9M
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC REFER DESIGN SECTION-17A
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out. qult = 607.030 kPa
REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:175 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-02 MATCHLINE-01 MATCHLINE-01

TO THALIKULAM DETAIL-'B' REFER DRG NO.


TAInd-S/22946/378+576/DET-01
(SH NO. 02 OF 03)
E

E
'B'

SRL
D

D
OGL

3.200
PCC 'SP1'
LEVELING 'SP2'
PAD TOP
C

C
CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
TOP 3 LAYERS 6.4M
MIDDLE 5 LAYERS 6.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.9M
REFER DESIGN SECTION-17
NOTE:- qult = 580.44 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND DEVELOPED APPROACH ELEVATION (PART 2)
SETTLEMENT REQUIREMENTS ARE SATISFIED (RIGHT HAND SIDE WALL - THALIKULAM END)

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 02/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-02 MATCHLINE-02
MATCHLINE-03

TO THALIKULAM
E

E
SRL
D

D
OGL

3.200
PCC 'SP1'
LEVELING 'SP2'
PAD TOP
C

C
CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
TOP 5 LAYERS 6.5M TOP 3 LAYERS 6.4M
MIDDLE 2 LAYERS 6.0M MIDDLE 5 LAYERS 6.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.7M BOTTOM 3 LAYERS 5.9M
REFER DESIGN SECTION-16 REFER DESIGN SECTION-17
NOTE:- qult = 542.77 kPa qult = 580.44 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND DEVELOPED APPROACH ELEVATION (PART 3)
SETTLEMENT REQUIREMENTS ARE SATISFIED (RIGHT HAND SIDE WALL - THALIKULAM END)

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 03/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-03 MATCHLINE-03
MATCHLINE-04

TO THALIKULAM
E

E
SRL
D

D
OGL

3.200
PCC 'SP1' 'SP1'
LEVELING
PAD TOP
C

C
CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
TOP 5 LAYERS 6.1M TOP 5 LAYERS 6.5M
MIDDLE 1 LAYER 5.3M TOP 5 LAYERS 6.0M MIDDLE 2 LAYERS 6.0M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.1M BOTTOM 5 LAYERS 5.4M BOTTOM 3 LAYERS 5.7M
REFER DESIGN SECTION-14 REFER DESIGN SECTION-15 REFER DESIGN SECTION-16
NOTE:- qult = 501.55 kPa qult = 538.92 kPa qult = 542.77 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
DEVELOPED APPROACH ELEVATION (PART 4)
(RIGHT HAND SIDE WALL - THALIKULAM END)
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 04/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-04 MATCHLINE-04
MATCHLINE-05

TO THALIKULAM
E

E
D

D
SRL

OGL

3.200
PCC 'SP1'
'SP2' LEVELING 'SP2'
PAD TOP
C

C
CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
TOP 5 LAYERS 6.1M
TOP 4 LAYERS 5.7M MIDDLE 1 LAYER 5.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 5 LAYERS 5.0M BOTTOM 3 LAYERS 5.1M
REFER DESIGN SECTION-13 REFER DESIGN SECTION-14
NOTE:- qult = 490.73kPa qult = 501.55 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND DEVELOPED APPROACH ELEVATION (PART 5)
SETTLEMENT REQUIREMENTS ARE SATISFIED (RIGHT HAND SIDE WALL - THALIKULAM END)

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 05/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-05 MATCHLINE-05

MATCHLINE-06

TO THALIKULAM
E

E
D

D
SRL

OGL

3.200
PCC 'SP1'
'SP2' 2.400 LEVELING
PCC PAD TOP
LEVELING
PAD TOP
C

C
CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
TOP 3 LAYERS 5.6M TOP 3 LAYERS 5.6M
MIDDLE 3 LAYERS 5.0M TOP 3 LAYERS 5.2M MIDDLE 3 LAYERS 5.0M
LENGTH OF POLYMERIC STRAPS
BOTTOM 2 LAYERS 4.8M BOTTOM 5 LAYERS 4.8M BOTTOM 2 LAYERS 4.8M
REFER DESIGN SECTION-12 REFER DESIGN SECTION-11 REFER DESIGN SECTION-12
NOTE:- qult = 456.86 kPa qult = 431.44 kPa qult = 456.86 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, TOP 4 LAYERS 5.7M
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND BOTTOM 5 LAYERS 5.0M
SETTLEMENT REQUIREMENTS ARE SATISFIED
REFER DESIGN SECTION-13
DISCLAIMER: qult = 490.73kPa
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision DEVELOPED APPROACH ELEVATION (PART 6)
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August (RIGHT HAND SIDE WALL - THALIKULAM END)
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 06/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-06 MATCHLINE-06

MATCHLINE-07

378+276*(CH)
BOX
CULVERT
TO THALIKULAM
E

E
℄OF
'SP2'

SRL
D

D
OGL
'D'

2.600
2.400
'SP2' PCC 'SP1'
'SP1' PCC
LEVELING
LEVELING
PAD TOP 3.798* 1.448* PAD TOP
RE PAD/SLAB INVERT
DETAIL 'D' REF. DRAWING NO.
TOP LEVEL LEVEL
TAInd-S/22946/378+576/DET-01
S
(HEEN
T0
O
20
F
.3)

CURVE LENGTH
C

C
® APPROACH LENGTH

®
CONNECTOR

EPDM

TOP 2 LAYERS 4.9M TOP 1 LAYER 5.2M TOP 3 LAYERS 5.2M


LENGTH OF POLYMERIC STRAPS
MIDDLE 1 LAYER 4.7M MIDDLE 2 LAYERS 5.0M TOP 4 LAYERS 4.1M BOTTOM 5 LAYERS 4.8M
TOP 2 LAYERS 4.6M
BOTTOM 4 LAYERS 4.5M BOTTOM 4 LAYERS 4.8M REFER DESIGN SECTION-11
MIDDLE 1 LAYER 4.2M BOTTOM 2 LAYERS 3.8M
REFER DESIGN SECTION-9 REFER DESIGN SECTION-10 qult = 431.44 kPa
BOTTOM 3 LAYERS 3.8M REFER DESIGN SECTION-7
qult = 374.30 kPa qult = 394.84 kPa qult = 333.17 kPa TOP 3 LAYERS 5.6M
REFER DESIGN SECTION-8
MIDDLE 3 LAYERS 5.0M
qult = 367.47 kPa
NOTE:- BOTTOM 2 LAYERS 4.8M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-12
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND DEVELOPED APPROACH ELEVATION (PART 7) qult = 456.86 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED (RIGHT HAND SIDE WALL - THALIKULAM END)

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 07/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-07 MATCHLINE-07

MATCHLINE-08
E

E
TO THALIKULAM

SRL
D

D
OGL

2.600
PCC
LEVELING
PAD TOP

CURVE LENGTH
C

C
® APPROACH LENGTH

®
CONNECTOR

EPDM

TOP 2 LAYERS 4.2M TOP 4 LAYERS 4.1M TOP 2 LAYERS 4.6M


LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 3.8M BOTTOM 2 LAYERS 3.8M MIDDLE 1 LAYER 4.2M
REFER DESIGN SECTION-6 REFER DESIGN SECTION-7 BOTTOM 3 LAYERS 3.8M
qult = 303.17 kPa qult = 333.17 kPa REFER DESIGN SECTION-8
qult = 367.47 kPa

NOTE:- DEVELOPED APPROACH ELEVATION (PART 8)


B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, (RIGHT HAND SIDE WALL - THALIKULAM END)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 08/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-09 MATCHLINE-08 MATCHLINE-08

TO THALIKULAM
E

E
OGL

SRL
D

D
2.600
PCC
LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH

®
C

C
CONNECTOR

EPDM
TOP 1 LAYER 3.7M
MIDDLE 2 LAYERS 3.6M ALL LAYERS 3.6M TOP 2 LAYERS 4.2M
LENGTH OF POLYMERIC STRAPS
BOTTOM 1 LAYER 3.2M REFER DESIGN SECTION-5 BOTTOM 3 LAYERS 3.8M
REFER DESIGN SECTION-4 qult = 283.99 kPa REFER DESIGN SECTION-6
qult = 253.130 kPa qult = 303.17 kPa
DEVELOPED APPROACH ELEVATION (PART 9)
(RIGHT HAND SIDE WALL - THALIKULAM END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 09/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-09 MATCHLINE-09
MATCHLINE-10

TO THALIKULAM
E

E
SRL

OGL

2.600
PCC
LEVELING
PAD TOP
D

D
CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM

ALL LAYERS 3.2M ALL LAYERS 3.3M


LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-2 REFER DESIGN SECTION-3
C

C
qult = 216.17 kPa qult = 231.50 kPa
TOP 1 LAYER 3.7M
MIDDLE 2 LAYERS 3.6M
DEVELOPED APPROACH ELEVATION (PART 10) BOTTOM 1 LAYER 3.2M
(RIGHT HAND SIDE WALL - THALIKULAM END) REFER DESIGN SECTION-4
qult = 253.130 kPa

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 10/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-10 MATCHLINE-10

**END OF RE WALL
AS PER SITE CONDITION

TO THALIKULAM
E

E
SRL

OGL

2.600
PCC
D

D
LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH

®
CONNECTOR

EPDM
C

C
ALL LAYERS 3.2M
LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-2
qult = 216.17 kPa

DEVELOPED APPROACH ELEVATION (PART 11)


(RIGHT HAND SIDE WALL - THALIKULAM END)

NOTE:-
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED
B

B
**
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 11/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTE:- LEGEND: TO THALIKULAM TO KODUNGALLUR

378+576*(CH)
℄OF VUP
START OF RE WALL
GA-02
END OF RE Wall
F

F
CULVERT
℄OF BOX
CAUTION :-

CULVERT
℄OF BOX
A1 A2
KEY PLAN
* (N.T.S.)

START OF RE WALL
E

E
MATCHLINE-01 MATCHLINE-01

A1
℄OF EXP.GAP JT. TO THALIKULAM
378562.050*(CH)
℄ OF BRG.
378562.950*(CH)
TAInd-S/22946/378+576/CW-01
D

D
1
CLOSING WALL VIEW - A1

1
REFER DRG NO.

A1

'SP1' SRL

3.528*
PILE CAP OGL
C

C
TOP LEVEL

3.000
PCC
LEVELING
PAD TOP

CURVE LENGTH

APPROACH LENGTH ®

®
NOTE:-
CONNECTOR
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND EPDM
SETTLEMENT REQUIREMENTS ARE SATISFIED TOP 2 LAYERS 7.3M TOP 2 LAYERS 7.2M
MIDDLE 3 LAYERS 6.6M MIDDLE 1 LAYER 6.5M
DISCLAIMER: LENGTH OF POLYMERIC STRAPS
BOTTOM 6 LAYERS 6.4M BOTTOM 8 LAYERS 6.4M
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
REFER DESIGN SECTION-18A REFER DESIGN SECTION-18
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC qult = 628.61 kPa qult = 604.52 kPa
DEVELOPED APPROACH ELEVATION (PART 1)
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.
(LEFT HAND SIDE WALL - THALIKULAM END)

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-01 MATCHLINE-02 MATCHLINE-02

TO THALIKULAM
DETAIL-'B' REFER DRG NO.
TAInd-S/22946/378+576/DET-01
(SH NO. 02 OF 03)
E

E
'B'
D

D
SRL

OGL

3.000
'SP1' PCC
'SP2' LEVELING
PAD TOP

CURVE LENGTH
C

C
APPROACH LENGTH ®

® ®
CONNECTOR

EPDM
TOP 2 LAYERS 7.2M TOP 3 LAYERS 6.4M
MIDDLE 1 LAYER 6.5M MIDDLE 5 LAYERS 6.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 8 LAYERS 6.4M BOTTOM 3 LAYERS 5.9M
REFER DESIGN SECTION-18 REFER DESIGN SECTION-17
qult = 604.52 kPa qult = 580.44 kPa
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, DEVELOPED APPROACH ELEVATION (PART 2)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND (LEFT HAND SIDE WALL - THALIKULAM END)
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 02/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-02 MATCHLINE-03 MATCHLINE-03

TO THALIKULAM
E

E
D

D
SRL

3.000
'SP1' PCC
'SP2' 2.200
LEVELING
PAD TOP PCC OGL
LEVELING
PAD TOP
CURVE LENGTH
C

C
APPROACH LENGTH ®

® ®
CONNECTOR

EPDM
TOP 3 LAYERS 6.4M TOP 3 LAYERS 6.9M TOP 2 LAYERS 7.2M
MIDDLE 5 LAYERS 6.3M BOTTOM 9 LAYERS 6.6M MIDDLE 1 LAYER 6.5M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.9M REFER DESIGN SECTION-19 BOTTOM 8 LAYERS 6.4M
REFER DESIGN SECTION-17 qult = 632.91 kPa REFER DESIGN SECTION-18
qult = 580.44 kPa qult = 604.52 kPa
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, DEVELOPED APPROACH ELEVATION (PART 3)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND (LEFT HAND SIDE WALL - THALIKULAM END)
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 03/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-03 MATCHLINE-04 MATCHLINE-04

TO THALIKULAM
E

E
D

D
SRL

OGL

2.200
'SP2' 'SP1'
PCC
LEVELING
PAD TOP
CURVE LENGTH
C

C
APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 2 LAYERS 7.2M TOP 3 LAYERS 6.4M
MIDDLE 1 LAYER 6.5M MIDDLE 5 LAYERS 6.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 8 LAYERS 6.4M BOTTOM 3 LAYERS 5.9M
REFER DESIGN SECTION-18 REFER DESIGN SECTION-17
qult = 604.52 kPa qult = 580.44 kPa
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, DEVELOPED APPROACH ELEVATION (PART 4)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND (LEFT HAND SIDE WALL - THALIKULAM END)
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 04/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-04 MATCHLINE-05 MATCHLINE-05

TO THALIKULAM
E

E
D

D
SRL

OGL

3.000
PCC
'SP2' 'SP2'
2.200 LEVELING
PCC PAD TOP
LEVELING
PAD TOP
CURVE LENGTH
C

C
APPROACH LENGTH ®

® ®
CONNECTOR

EPDM
TOP 3 LAYERS 6.4M TOP 5 LAYERS 6.5M TOP 5 LAYERS 6.5M
MIDDLE 5 LAYERS 6.3M MIDDLE 2 LAYERS 6.0M MIDDLE 2 LAYERS 6.0M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.9M BOTTOM 3 LAYERS 5.7M BOTTOM 3 LAYERS 5.7M
REFER DESIGN SECTION-17 REFER DESIGN SECTION-16 REFER DESIGN SECTION-16
qult = 580.44 kPa qult = 542.77 kPa qult = 542.77 kPa
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, DEVELOPED APPROACH ELEVATION (PART 5)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND (LEFT HAND SIDE WALL - THALIKULAM END)
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 05/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-05
MATCHLINE-06 MATCHLINE-06

TO THALIKULAM
E

E
D

D
SRL

3.000 OGL
'SP1' PCC
2.200 'SP1'
'SP2' LEVELING
PCC PAD TOP
LEVELING
PAD TOP
CURVE LENGTH
C

C
APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 5 LAYERS 6.1M TOP 4 LAYERS 5.7M
MIDDLE 1 LAYER 5.3M BOTTOM 5 LAYERS 5.0M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.1M REFER DESIGN SECTION-13
REFER DESIGN SECTION-14 qult = 490.73 kPa
qult = 501.55 kPa
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, DEVELOPED APPROACH ELEVATION (PART 6)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND (LEFT HAND SIDE WALL - THALIKULAM END)
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 06/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-06
MATCHLINE-07 MATCHLINE-07

TO THALIKULAM
E

E
378+276*(CH)
BOX
CULVERT
℄OF
D

D
SRL

'D' OGL
3.000 3.000
PCC 'SP1' PCC
'SP2' LEVELING LEVELING
PAD TOP DREDT'F R
AL.IAW NIGNO. PAD TOP
'SP1' 3.771* TA
nS
2dI-/94367/8+57D
6/ET01-
1.421* S(HEEN T0O20F.3)
INVERT LEVEL RE PAD/SLAB
CURVE LENGTH TOP LEVEL
C

C
APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 4 LAYERS 5.7M TOP 3 LAYERS 5.6M TOP 3 LAYERS 5.2M
BOTTOM 5 LAYERS 5.0M MIDDLE 3 LAYERS 5.0M BOTTOM 5 LAYERS 4.8M
LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-13 BOTTOM 2 LAYERS 4.8M REFER DESIGN SECTION-11
qult = 490.73 kPa TOP 1 LAYER 5.2M REFER DESIGN SECTION-12 qult = 431.44 kPa
MIDDLE 2 LAYERS 5.0M qult = 456.86 kPa
NOTE:- BOTTOM 4 LAYERS 4.8M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-10 DEVELOPED APPROACH ELEVATION (PART 7)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND (LEFT HAND SIDE WALL - THALIKULAM END)
qult = 394.84 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 07/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-07

MATCHLINE-08 MATCHLINE-08

TO THALIKULAM
E

E
SRL
D

D
OGL
3.000
PCC
LEVELING 2.200
PCC 'SP2' 'SP1'
PAD TOP
LEVELING
PAD TOP
CURVE LENGTH

APPROACH LENGTH ®
C

C
®
CONNECTOR

EPDM
TOP 1 LAYER 5.2M TOP 3 LAYERS 5.6M TOP 3 LAYERS 5.2M TOP 1 LAYER 5.2M TOP 2 LAYERS 4.9M
MIDDLE 2 LAYERS 5.0M MIDDLE 3 LAYERS 5.0M BOTTOM 5 LAYERS 4.8M MIDDLE 2 LAYERS 5.0M MIDDLE 1 LAYER 4.7M
LENGTH OF POLYMERIC STRAPS
BOTTOM 4 LAYERS 4.8M BOTTOM 2 LAYERS 4.8M REFER DESIGN SECTION-11 BOTTOM 4 LAYERS 4.8M BOTTOM 4 LAYERS 4.5M
REFER DESIGN SECTION-10 REFER DESIGN SECTION-12 qult = 431.44 kPa REFER DESIGN SECTION-10 REFER DESIGN SECTION-9
qult = 394.84 kPa qult = 456.86 kPa qult = 394.84 kPa qult = 374.30 kPa
TOP 3 LAYERS 5.2M DEVELOPED APPROACH ELEVATION (PART 8)
BOTTOM 5 LAYERS 4.8M (LEFT HAND SIDE WALL - THALIKULAM END)
REFER DESIGN SECTION-11
NOTE:- qult = 431.44 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 08/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-08

MATCHLINE-09 MATCHLINE-09

TO THALIKULAM
E

E
SRL
D

D
OGL

2.200
PCC 'SP2'
LEVELING
PAD TOP
CURVE LENGTH

APPROACH LENGTH ®

®
C

C
CONNECTOR

EPDM
TOP 2 LAYERS 4.9M TOP 2 LAYERS 4.6M TOP 4 LAYERS 4.1M TOP 2 LAYERS 4.2M
MIDDLE 1 LAYER 4.7M MIDDLE 1 LAYER 4.2M BOTTOM 2 LAYERS 3.8M BOTTOM 3 LAYERS 3.8M ALL LAYERS 3.6M
LENGTH OF POLYMERIC STRAPS
BOTTOM 4 LAYERS 4.5M BOTTOM 3 LAYERS 3.8M REFER DESIGN SECTION-7 REFER DESIGN SECTION-6 REFER DESIGN SECTION-5
REFER DESIGN SECTION-9 REFER DESIGN SECTION-8 qult = 333.17 kPa qult = 303.17 kPa qult = 283.99 kPa
qult = 374.30 kPa qult = 367.47 kPa

DEVELOPED APPROACH ELEVATION (PART 9)


(LEFT HAND SIDE WALL - THALIKULAM END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 09/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-09

MATCHLINE-10 MATCHLINE-10
E

E
TO THALIKULAM

SRL

OGL
D

D
2.200
PCC
LEVELING
PAD TOP
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
C

C
TOP 1 LAYER 3.7M
ALL LAYERS 3.6M MIDDLE 2 LAYERS 3.6M ALL LAYERS 3.3M
LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-5 BOTTOM 1 LAYER 3.2M REFER DESIGN SECTION-3
qult = 283.99 kPa REFER DESIGN SECTION-4 qult = 231.50 kPa
qult = 253.13 kPa

DEVELOPED APPROACH ELEVATION (PART 10)


(LEFT HAND SIDE WALL - THALIKULAM END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 10/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-10 **END OF RE WALL
E

E
AS PER SITE CONDITION

TO THALIKULAM

SRL

OGL
D

D
3.000
PCC
2.200 LEVELING
PCC PAD TOP
LEVELING
PAD TOP
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR
C

C
EPDM

ALL LAYERS 3.0M


LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-1
qult = 193.65 kPa
ALL LAYERS 3.3M
REFER DESIGN SECTION-3
qult = 231.50 kPa DEVELOPED APPROACH ELEVATION (PART 11)
(LEFT HAND SIDE WALL - THALIKULAM END)
B

B
NOTE:-
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
DISCLAIMER: IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.
**
REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 11/11
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTE:- LEGEND: TO THALIKULAM TO KODUNGALLUR

378+576*(CH)
CULVERT
℄OF BOX

℄OF VUP
F

F
END OF RE Wall
CULVERT
℄OF BOX
CAUTION :-

GA-03
START OF RE Wall
A1 A2
KEY PLAN
* (N.T.S.)
E

E
MATCHLINE-01 MATCHLINE-01
START OF RE WALL

TO KODUNGALLUR
A2
℄OF EXP.GAP JT.
378589.950*(CH) DETAIL-'B' REFER DRG NO.
℄ OF BRG. TAInd-S/22946/378+576/DET-01
378589.050*(CH) (SH NO. 02 OF 03)

'B'
D

D
TAInd-S/22946/378+576/CW-02
CLOSING WALL VIEW - A2
REFER DRG NO.

1
A2
1

'SP1' OGL
3.750*
PILE CAP SRL
TOP LEVEL
C

C
3.000
PCC
LEVELING
PAD TOP

CURVE LENGTH

APPROACH LENGTH ®

®
NOTE:- CONNECTOR
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND EPDM
TOP 2 LAYERS 7.3M TOP 2 LAYERS 7.2M
SETTLEMENT REQUIREMENTS ARE SATISFIED MIDDLE 3 LAYERS 6.6M MIDDLE 1 LAYER 6.5M
LENGTH OF POLYMERIC STRAPS
BOTTOM 6 LAYERS 6.4M BOTTOM 8 LAYERS 6.4M
DISCLAIMER:
REFER DESIGN SECTION-18A REFER DESIGN SECTION-18
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision qult = 628.610 kPa qult = 604.52 kPa
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC DEVELOPED APPROACH ELEVATION (PART 1)
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out. (RIGHT HAND SIDE WALL - KODUNGALLUR END)

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:175 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-01

MATCHLINE-02 MATCHLINE-02

TO KODUNGALLUR
E

E
D

D
OGL

SRL

3.000
PCC 'SP1'
LEVELING 'SP2'
PAD TOP
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 2 LAYERS 7.2M
MIDDLE 1 LAYER 6.5M
LENGTH OF POLYMERIC STRAPS
NOTE:- BOTTOM 8 LAYERS 6.4M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-18
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 604.52 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED
DEVELOPED APPROACH ELEVATION (PART 2)
DISCLAIMER:
(RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 02/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-02 MATCHLINE-03 MATCHLINE-03

TO KODUNGALLUR
E

E
D

D
OGL

SRL

3.000
PCC 'SP1'
'SP2'
LEVELING
PAD TOP
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 2 LAYERS 7.2M
LENGTH OF POLYMERIC STRAPS
MIDDLE 1 LAYER 6.5M
NOTE:- BOTTOM 8 LAYERS 6.4M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-18
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 604.52 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED
DEVELOPED APPROACH ELEVATION (PART 3)
DISCLAIMER:
(RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 03/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-03 MATCHLINE-04 MATCHLINE-04

TO KODUNGALLUR
E

E
D

D
OGL

SRL

3.000
'SP1' PCC
'SP2' 2.200
LEVELING
PAD TOP PCC
LEVELING
PAD TOP
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 2 LAYERS 7.2M TOP 3 LAYERS 7.6M TOP 3 LAYERS 6.9M
MIDDLE 1 LAYER 6.5M MIDDLE 4 LAYER 7.0M BOTTOM 9 LAYERS 6.6M
LENGTH OF POLYMERIC STRAPS
NOTE:- BOTTOM 8 LAYERS 6.4M BOTTOM 5 LAYERS 6.8M REFER DESIGN SECTION-19
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-18 REFER DESIGN SECTION-20 qult = 632.91 kPa
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 604.52 kPa qult = 648.63 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED
DEVELOPED APPROACH ELEVATION (PART 4)
DISCLAIMER:
(RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 04/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-04 MATCHLINE-05 MATCHLINE-05

TO KODUNGALLUR
E

E
D

D
OGL

SRL

2.200
'SP2' 'SP1' PCC
LEVELING
PAD TOP
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 3 LAYERS 6.9M TOP 2 LAYERS 7.2M
LENGTH OF POLYMERIC STRAPS
BOTTOM 9 LAYERS 6.6M MIDDLE 1 LAYER 6.5M
NOTE:- REFER DESIGN SECTION-19 BOTTOM 8 LAYERS 6.4M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, qult = 632.91 kPa REFER DESIGN SECTION-18
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 604.52 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED
DEVELOPED APPROACH ELEVATION (PART 5)
DISCLAIMER:
(RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 05/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-05
MATCHLINE-06 MATCHLINE-06
E

E
TO KODUNGALLUR
D

D
OGL

SRL

2.200 'SP2'
'SP2' 'SP1'
PCC
LEVELING
PAD TOP
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 3 LAYERS 6.4M TOP 5 LAYERS 6.5M
LENGTH OF POLYMERIC STRAPS MIDDLE 5 LAYERS 6.3M MIDDLE 2 LAYERS 6.0M TOP 5 LAYERS 6.0M
NOTE:- BOTTOM 3 LAYERS 5.9M BOTTOM 3 LAYERS 5.7M BOTTOM 5 LAYERS 5.4M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-17 REFER DESIGN SECTION-16 REFER DESIGN SECTION-15
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 580.44 kPa qult = 542.77 kPa qult = 538.92 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED
DEVELOPED APPROACH ELEVATION (PART 6)
DISCLAIMER:
(RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 06/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-06
MATCHLINE-07 MATCHLINE-07
E

E
TO KODUNGALLUR
D

D
SRL

OGL

3.000
PCC 'SP1'
2.200 LEVELING
'SP2'
PCC PAD TOP
LEVELING
PAD TOP
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 5 LAYERS 6.1M TOP 3 LAYERS 5.6M
LENGTH OF POLYMERIC STRAPS
TOP 5 LAYERS 6.0M MIDDLE 1 LAYER 5.3M MIDDLE 3 LAYERS 5.0M TOP 3 LAYERS 5.2M
NOTE:- BOTTOM 5 LAYERS 5.4M BOTTOM 3 LAYERS 5.1M BOTTOM 2 LAYERS 4.8M BOTTOM 5 LAYERS 4.8M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-15 REFER DESIGN SECTION-14 REFER DESIGN SECTION-12 REFER DESIGN SECTION-11
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 538.92 kPa qult = 501.55 kPa qult = 456.86 kPa qult = 431.44 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED
DEVELOPED APPROACH ELEVATION (PART 7)
DISCLAIMER:
(RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 07/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-07

MATCHLINE-08 MATCHLINE-08

TO KODUNGALLUR
E

E
SRL

OGL
D

D
3.000
PCC 'SP1'
'SP2'
LEVELING
PAD TOP

CURVE LENGTH

APPROACH LENGTH ®
C

C
®
CONNECTOR

EPDM

TOP 1 LAYER 5.2M TOP 2 LAYERS 4.9M TOP 2 LAYERS 4.6M TOP 4 LAYERS 4.1M
LENGTH OF POLYMERIC STRAPS
MIDDLE 2 LAYERS 5.0M MIDDLE 1 LAYER 4.7M MIDDLE 1 LAYER 4.2M BOTTOM 2 LAYERS 3.8M
BOTTOM 4 LAYERS 4.8M BOTTOM 4 LAYERS 4.5M BOTTOM 3 LAYERS 3.8M REFER DESIGN SECTION-7
REFER DESIGN SECTION-10 REFER DESIGN SECTION-9 REFER DESIGN SECTION-8 qult = 333.17 kPa
qult = 394.84 kPa qult = 374.30 kPa qult = 367.47 kPa
TOP 3 LAYERS 5.2M
BOTTOM 5 LAYERS 4.8M DEVELOPED APPROACH ELEVATION (PART 8)
REFER DESIGN SECTION-11 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
NOTE:- qult = 431.44 kPa
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 08/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-08

MATCHLINE-09 MATCHLINE-09
E

E
℄OF BOX CULVERT
378+968*(CH)
TO KODUNGALLUR
D

D
SRL

OGL
'D'
3.000 3.000
PCC PCC
LEVELING DETAIL 'D' REF. DRAWING NO. LEVELING
PAD TOP TAInd-S/22946/378+576/DET-01 PAD TOP
S
(HEEN
T0
O
20
F
.3) 2.139*
INVERT
3.889* LEVEL
RE PAD/SLAB
TOP LEVEL
C

C
CURVE LENGTH

APPROACH LENGTH ®

®
CONNECTOR

EPDM
TOP 1 LAYER 3.7M
TOP 2 LAYERS 4.2M ALL LAYERS 3.6M MIDDLE 2 LAYERS 3.6M ALL LAYERS 3.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 3.8M REFER DESIGN SECTION-5 BOTTOM 1 LAYER 3.2M REFER DESIGN SECTION-3
REFER DESIGN SECTION-6 qult = 283.99 kPa REFER DESIGN SECTION-4 qult = 231.50 kPa
TOP 4 LAYERS 4.1M qult = 303.17 kPa ALL LAYERS 3.3M qult = 253.130 kPa
B

B
BOTTOM 2 LAYERS 3.8M REFER DESIGN SECTION-3 ALL LAYERS 3.6M
REFER DESIGN SECTION-7 qult = 231.50 kPa REFER DESIGN SECTION-5
qult = 333.17 kPa qult = 283.99 kPa
DEVELOPED APPROACH ELEVATION (PART 9)
DISCLAIMER:
NOTE:- (RIGHT HAND SIDE WALL - KODUNGALLUR END)
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out. SETTLEMENT REQUIREMENTS ARE SATISFIED

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 09/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-09

**END OF RE WALL
AS PER SITE CONDITION
E

E
TO KODUNGALLUR

OGL

SRL
D

D
3.000
PCC
LEVELING
PAD TOP

CURVE LENGTH

APPROACH LENGTH ®
C

C
®
CONNECTOR

EPDM

ALL LAYERS 3.3M ALL LAYERS 3.2M ALL LAYERS 3.0M


LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-3 REFER DESIGN SECTION-2 REFER DESIGN SECTION-1
qult = 231.50 kPa qult = 216.17 kPa qult = 193.65 kPa

DEVELOPED APPROACH ELEVATION (PART 10)


(RIGHT HAND SIDE WALL - KODUNGALLUR END)
B

B
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC **
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 10/10
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-03
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (RIGHT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTE:- LEGEND: TO THALIKULAM TO KODUNGALLUR

378+576*(CH)
END OF RE Wall

CULVERT

℄OF VUP
℄OF BOX
GA-04
START OF RE Wall
F

F
CULVERT
℄OF BOX
CAUTION :-

A1 A2
KEY PLAN
* (N.T.S.)
E

E
START OF RE WALL
MATCHLINE-01

A2
TO KODUNGALLUR ℄OF EXP.GAP JT.
378589.950*(CH)

℄ OF BRG.
378589.050*(CH)
D

D
TAInd-S/22946/378+576/CW-02
1

CLOSING WALL VIEW - A2


1

A2

REFER DRG NO.


OGL
'SP2'
3.750*
SRL PILE CAP
C

C
TOP LEVEL

3.000
PCC
LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH

®
B

B
CONNECTOR

EPDM DISCLAIMER:
TOP 2 LAYERS 7.2M TOP 2 LAYERS 7.3M The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP
LENGTH OF
MIDDLE 1 LAYER 6.5M MIDDLE 3 LAYERS 6.6M 102-2014/MORTH 5th Revision 3100 section specification. Design parameters
NOTE:- POLYMERIC
BOTTOM 8 LAYERS 6.4M BOTTOM 6 LAYERS 6.4M STRAPS
considered in the design report TAInd-S/22946/R0 dated August 2022 shall be
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-18 REFER DESIGN SECTION-18A validated and executed at site without any deviations. Wherever Water table is
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND DEVELOPED APPROACH ELEVATION (PART 1) present at PCC Levelling pad at site then 500mm Thick (minimum)
SETTLEMENT REQUIREMENTS ARE SATISFIED
qult = 604.52 kPa qult = 628.61 kPa
(LEFT HAND SIDE WALL - KODUNGALLUR END) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-02
MATCHLINE-01 MATCHLINE-01

TO KODUNGALLUR
DETAIL-'B' REFER DRG NO.
TAInd-S/22946/378+576/DET-01
(SH NO. 02 OF 03)

'B'
E

E
OGL
D

D
SRL

3.000
'SP1' 'SP1' PCC
LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH
C

C
® ®
CONNECTOR

EPDM
TOP 3 LAYERS 6.4M TOP 2 LAYERS 7.2M
MIDDLE 5 LAYERS 6.3M MIDDLE 1 LAYER 6.5M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.9M BOTTOM 8 LAYERS 6.4M
REFER DESIGN SECTION-17 REFER DESIGN SECTION-18
qult = 580.44 kPa qult = 604.52 kPa
DEVELOPED APPROACH ELEVATION (PART 2)
(LEFT HAND SIDE WALL - KODUNGALLUR END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 02/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-02 MATCHLINE-02
MATCHLINE-03

TO KODUNGALLUR
E

E
OGL
D

D
SRL

3.000
PCC 'SP1'
LEVELING 'SP2'
PAD TOP

CURVE LENGTH

® APPROACH LENGTH
C

C
®
CONNECTOR

EPDM
TOP 5 LAYERS 6.5M TOP 3 LAYERS 6.4M
MIDDLE 2 LAYERS 6.0M MIDDLE 5 LAYERS 6.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.7M BOTTOM 3 LAYERS 5.9M
REFER DESIGN SECTION-16 REFER DESIGN SECTION-17
qult = 542.77 kPa qult = 580.44 kPa
DEVELOPED APPROACH ELEVATION (PART 3)
(LEFT HAND SIDE WALL - KODUNGALLUR END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 03/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-04 MATCHLINE-03 MATCHLINE-03

TO KODUNGALLUR
E

E
OGL
D

D
SRL

3.000
PCC
LEVELING 'SP1' 'SP2'
PAD TOP

CURVE LENGTH

® APPROACH LENGTH
C

C
®
CONNECTOR

EPDM
TOP 5 LAYERS 6.1M TOP 5 LAYERS 6.0M
MIDDLE 1 LAYER 5.3M BOTTOM 5 LAYERS 5.4M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 5.1M REFER DESIGN SECTION-15
REFER DESIGN SECTION-14 qult = 538.92 kPa TOP 5 LAYERS 6.5M
qult = 501.55 kPa MIDDLE 2 LAYERS 6.0M
DEVELOPED APPROACH ELEVATION (PART 4) BOTTOM 3 LAYERS 5.7M
(LEFT HAND SIDE WALL - KODUNGALLUR END)
REFER DESIGN SECTION-16
qult = 542.77 kPa
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 04/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-04 MATCHLINE-04

MATCHLINE-05

TO KODUNGALLUR
E

E
OGL
D

D
SRL

3.000
PCC 'SP2'
'SP1'
'SP2' LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH
C

C
®
CONNECTOR

EPDM
TOP 3 LAYERS 5.6M TOP 4 LAYERS 5.7M TOP 5 LAYERS 6.1M
MIDDLE 3 LAYERS 5.0M BOTTOM 5 LAYERS 5.0M MIDDLE 1 LAYER 5.3M
LENGTH OF POLYMERIC STRAPS
BOTTOM 2 LAYERS 4.8M REFER DESIGN SECTION-13 BOTTOM 3 LAYERS 5.1M
REFER DESIGN SECTION-12 qult = 490.73 kPa REFER DESIGN SECTION-14
qult = 456.86 kPa qult = 501.55 kPa
DEVELOPED APPROACH ELEVATION (PART 5)
(LEFT HAND SIDE WALL - KODUNGALLUR END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 05/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-05 MATCHLINE-05

MATCHLINE-06

TO KODUNGALLUR
E

E
OGL
D

D
SRL

3.000
'SP1' PCC
LEVELING 'SP2'
PAD TOP

CURVE LENGTH

® APPROACH LENGTH
C

C
®
CONNECTOR

EPDM
TOP 1 LAYER 5.2M TOP 3 LAYERS 5.2M TOP 3 LAYERS 5.6M
MIDDLE 2 LAYERS 5.0M BOTTOM 5 LAYERS 4.8M MIDDLE 3 LAYERS 5.0M LENGTH OF POLYMERIC STRAPS
BOTTOM 4 LAYERS 4.8M REFER DESIGN SECTION-11 BOTTOM 2 LAYERS 4.8M
REFER DESIGN SECTION-10 qult = 431.44 kPa REFER DESIGN SECTION-12
qult = 394.84 kPa qult = 456.86 kPa
DEVELOPED APPROACH ELEVATION (PART 6)
(LEFT HAND SIDE WALL - KODUNGALLUR END)

NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 06/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-06 MATCHLINE-06

MATCHLINE-07
E

E
TO KODUNGALLUR

SRL
D

D
OGL

3.000
'SP1' PCC 'SP2'
'SP2'
LEVELING
PAD TOP

CURVE LENGTH

® APPROACH LENGTH
C

C
®
CONNECTOR

EPDM
TOP 2 LAYERS 4.6M TOP 2 LAYERS 4.9M
MIDDLE 1 LAYER 4.2M MIDDLE 1 LAYER 4.7M
LENGTH OF POLYMERIC STRAPS
BOTTOM 3 LAYERS 3.8M BOTTOM 4 LAYERS 4.5M
TOP 4 LAYERS 4.1M REFER DESIGN SECTION-8 REFER DESIGN SECTION-9
BOTTOM 2 LAYERS 3.8M qult = 367.47 kPa qult = 374.30 kPa
REFER DESIGN SECTION-7 DEVELOPED APPROACH ELEVATION (PART 7)
qult = 333.17 kPa (LEFT HAND SIDE WALL - KODUNGALLUR END) TOP 1 LAYER 5.2M
MIDDLE 2 LAYERS 5.0M
NOTE:- BOTTOM 4 LAYERS 4.8M
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, REFER DESIGN SECTION-10
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND qult = 394.84 kPa
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 07/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
MATCHLINE-07 MATCHLINE-07
E

E
MATCHLINE-08

TO KODUNGALLUR

SRL
D

D
OGL

3.000
'SP1' PCC
LEVELING
PAD TOP

CURVE LENGTH
C

C
® APPROACH LENGTH

®
CONNECTOR

EPDM
TOP 2 LAYERS 4.2M TOP 4 LAYERS 4.1M
ALL LAYERS 3.6M BOTTOM 3 LAYERS 3.8M BOTTOM 2 LAYERS 3.8M
LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-5 REFER DESIGN SECTION-6 REFER DESIGN SECTION-7
qult = 283.99 kPa qult = 303.17 kPa qult = 333.17 kPa

DEVELOPED APPROACH ELEVATION (PART 8)


(LEFT HAND SIDE WALL - KODUNGALLUR END)
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND
SETTLEMENT REQUIREMENTS ARE SATISFIED

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 08/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
E

E
MATCHLINE-08 MATCHLINE-08

℄OF BOX CULVERT


**END OF RE WALL

378+968*(CH)
AS PER SITE CONDITION

TO KODUNGALLUR

SRL
D

D
OGL

3.600 'D'
PCC 3.000
LEVELING PCC
PAD TOP LEVELING
3.862*
DREDT'F R
AL.IAW NIGNO. PAD TOP
TA
nS
2dI-/94367/8+57D
6/ET01- RE PAD/ 2.112*
S(HEEN T0O20F.3) SLAB TOP INVERT LEVEL
LEVEL
CURVE LENGTH

® APPROACH LENGTH
C

C
®
CONNECTOR

EPDM
TOP 1 LAYER 3.7M
ALL LAYERS 3.0M ALL LAYERS 3.2M MIDDLE 2 LAYERS 3.6M LENGTH OF POLYMERIC STRAPS
REFER DESIGN SECTION-1 REFER DESIGN SECTION-2 BOTTOM 1 LAYER 3.2M
qult = 193.65 kPa qult = 216.17 kPa REFER DESIGN SECTION-4
qult = 253.13 kPa
NOTE:- DEVELOPED APPROACH ELEVATION (PART 9)
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, (LEFT HAND SIDE WALL - KODUNGALLUR END)
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND ALL LAYERS 3.6M
SETTLEMENT REQUIREMENTS ARE SATISFIED REFER DESIGN SECTION-5
B

B
qult = 283.99 kPa
**
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 09/09
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/GA-04
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF APPROACH RAMP
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (LEFT HAND SIDE WALL - KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTE:- LEGEND: TO THALIKULAM TO KODUNGALLUR

378+576*(CH)
CULVERT

℄OF VUP
℄OF BOX
F

F
CULVERT
℄OF BOX
CAUTION :-

VIEW-A1
A1 A2
KEY PLAN
* (N.T.S.)
E

E
A1
D

D
C

C
3.200 3.000
PCC 2.800
PCC
LEVELING PCC
LEVELING
PAD TOP LEVELING
PAD TOP
3.528* PAD TOP 3.528*
PILE CAP PILE CAP
NOTE:- TOP LEVEL TOP LEVEL
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES,
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND ® APPROACH LENGTH
SETTLEMENT REQUIREMENTS ARE SATISFIED
®
DISCLAIMER: CONNECTOR
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
B

B
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC EPDM
TOP 2 LAYERS 7.3M TOP 3 LAYERS 6.9M TOP 2 LAYERS 7.3M
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.
MIDDLE 3 LAYERS 6.6M BOTTOM 9 LAYERS 6.6M MIDDLE 3 LAYERS 6.6M
LENGTH OF POLYMERIC STRAPS
BOTTOM 6 LAYERS 6.4M REFER DESIGN SECTION-19A BOTTOM 6 LAYERS 6.4M
TOP 3 LAYERS 6.6M
REFER DESIGN SECTION-18A qult = 662.97 kPa REFER DESIGN SECTION-18A
MIDDLE 5 LAYERS 6.3M
qult = 628.61 kPa qult = 628.61 kPa
BOTTOM 3 LAYERS 5.9M
REFER DESIGN SECTION-17A CLOSING WALL ELEVATION THALIKULAM END
qult = 607.030 kPa (VIEW - `A1')

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/01
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/CW-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF CLOSING WALL
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (VIEW A1- THALIKULAM END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTE:- LEGEND: TO THALIKULAM TO KODUNGALLUR

378+576*(CH)
CULVERT

℄OF VUP
℄OF BOX
F

F
CULVERT
℄OF BOX
CAUTION :-

VIEW-A2
A1 A2
KEY PLAN
* (N.T.S.)
E

E
A2
D

D
C

C
3.000 3.000
2.800
PCC PCC
PCC
LEVELING LEVELING
LEVELING
PAD TOP 3.750* 3.750* PAD TOP
PAD TOP
PILE CAP PILE CAP
TOP LEVEL TOP LEVEL

® APPROACH LENGTH

®
CONNECTOR
NOTE:-
B

B
BEFORE ANY RE WALL CONSTRUCTION ACTIVITY COMMENCES, EPDM
IT SHALL MANDATORILY BE ENSURED THAT THE SBC AND TOP 2 LAYERS 7.3M TOP 3 LAYERS 6.9M TOP 2 LAYERS 7.3M
SETTLEMENT REQUIREMENTS ARE SATISFIED MIDDLE 3 LAYERS 6.6M BOTTOM 9 LAYERS 6.6M MIDDLE 3 LAYERS 6.6M
LENGTH OF POLYMERIC STRAPS
BOTTOM 6 LAYERS 6.4M REFER DESIGN SECTION-19A BOTTOM 6 LAYERS 6.4M
DISCLAIMER: REFER DESIGN SECTION-18A qult = 662.97 kPa REFER DESIGN SECTION-18A
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision qult = 628.61 kPa qult = 628.61 kPa
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC CLOSING WALL ELEVATION KODUNGALLUR END
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.
(VIEW - `A2')
REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 1:150 A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044
RTR
INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/01
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/CW-02
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK AS PER P&P FRL's UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE:
GENERAL ARRANGEMENT OF CLOSING WALL
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 (VIEW A2- KODUNGALLUR END)
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

NOTES:

START OF RE WALL A1 A2

℄OF EXP.GAP JT. 'P'


F

F
R
REINFORCED EARTH FILL PROPERTIES RETAINED BACKFILL PROPERTIES
R
A. REINFORCED EARTH FILL B. RETAIN EARTH FILL
℄ OF BRG. PCC
LEVELING
PAD TOP g g

TYPICAL ELEVATION- X-X


SCALE 1:100
E

E
®

DETAIL P
SCALE 1:10

REFERENCE OF VARIOUS POINTS IN ELEVATION VIEW


WITH RESPECT TO THE CRASH BARRIER (SCALE 1:100)
START OF RE WALL
D

D
A1 A2

℄OF EXP.GAP JT. d

℄ OF BRG. POLYMERIC STRIP REINFORCEMENT SPECIFICATION


'C' Properties Test Method Unit Minimum average roll value

Ultimate ASTM D6637 kN 25 30 40 50 60 70 80 90 100


X Tensile Strength

Width mm 49 49 49 49 49 49 49 49 49

REFERENCES:
C

C
X
DRAWING IS PREPARED ON THE BASIS OF FOLLOWING CLIENT DRG. NO.
1.o A
C u
(N
tA
PF
D
IL
O
A
NR
M A
T) TAKEN FROMD R
N
A
E
G
OC.O M6
07
H
8
/0
3
9
W
/P
R 3
K
&
2
8
/03
L
P
7
-/9-
TYPICAL LEVELING PAD DETAIL D
AT
E
R
A
D2
P
E
L
R
,C
VIE
IT
D
HRO UGC
H
EN
L
IE
T
M
DL
A
2T
0
IE
2
8
.3
D
0
.
2. GAD OF VUP TAKEN FROM DWG NO. URS/NH66/STR/VUP/378+575/GAD/01 REV.00
SCALE 1:20
DATED 20.05.2022 (R E
CV
E
IB
D
C
E
Y
N
ML
ID
T
L
A
2T
0
IE
2
8
).2
D
9
.
3. ABUTMENT AND PILE CAP TOP LEVEL TAKEN FROM DWG NO. URS/NH66/STR/VUP/378+575/SUB-01
REV.00 DATED 31.05.2022 (R E
CV
EIB
D
C
E
YN
M
L
ID
T
L
A2
T
0
IE
2
8
).2
D
9
.
d 4. FRLs, SRLs, CAMBER AND GLs E X
(CF
E
O
LR
MR
A
E
TC
)V
E
IT
D
HR
OU
GC
H
E
N
LIE
T
M
DL
A
2
T
0
IE
2
8
.3
D
0.
5. BOX CULVERT DETAILS
1. CH. 378+276 TAKEN FROM DWG. NO. URS-NH66-BC-378+276-GAD-01 REV- 00 DATED 17.05.2022
2. CH. 378+968 TAKEN FROM DWG. NO. URS-NH66-BC-378+968-GAD-01 REV- 01 DATED 01.08.2022
RECV
EIB
D
C
E
Y
N
M
LID
T
L
A
2T
0
IE
2
8
.3
D
0
.
6. UPDATED-CRASH BARRIER TAKEN FROM DWG NO. URS/NH66/STR/MISC/TYP/01
REV.00 DATED 16.09.2022 R E
C
VE
IB
D
C
EY
N
M
L
ID
TL
A
2
T
0
IE
2
9
.2
D
0
.
7. TCS DETAILS TAKEN FROM DWG NO. A ECO M
607
H
8
/0
3
9
W
/TC
K
2
/0
L
S
-/2- REV.00 DATED APRIL- 22
REC
V
EIBD
C
E
YN
M
L
ID
T
L
A
2T
0
IE28
.3
D
0
.
B

B
8. REVISED DATA & CONFIRMATION ON PRELIMINARY DRAWINGS RECEIVED BY CLIENT EMAIL
DATED 17.11.2022 & 21.11.2022.
9. REVISED FRLs, E X
(C
F
E
OLR
MR
A
E
TC
)V
E
IT
D
HR
O U
G CH
E
N
L
IE
TM
D
L
A2
T
0
IE
4
5
.1
D
3
.
TYPICAL SECTIONAL DETAIL BETWEEN ABUTMENT
AND CLOSING WALL DISCLAIMER:
SCALE 1:100
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision d
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC DETAIL AT "C"
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out. SCALE 1:50

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DET-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK REFERENCES UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE: TYPICAL CROSS SECTION,CRASH BARRIER,LEVELLING
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 PAD DETAIL GENERAL NOTES & MISC. DETAIL .
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

ABBREVIATION:-
F

F
FINISH ROAD LEVEL
(FRL)

BOTTOM OF CRASH
BARRIER

TOP OF COPING
E

E
BEAM

BOTTOM OF FRICTION
SLAB / NIB

d
d
D

D
TYPICAL CRASH BARRIER
(R/F DETAIL BY OTHERS)
TYPICAL SLIP JOINT DETAIL
SCALE 1:10

d
d
C

C
d

°
90
DETAIL-'B' TYPICAL COPING DETAIL
SCALE 1:100

BOX CULVERT TOP SLAB


B

B
DETAIL D d
SCALE 1:20

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August TYPICAL CORNER DETAIL-'A'
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC SCALE 1:20
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 01
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 02/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DET-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
01 17.05.24 BSC RK SK RE WALL FACIA AREA UPDATED TITLE:
DRAWING STATUS:
CONCESSIONAIRE: TYPICAL CROSS SECTION,CRASH BARRIER,LEVELLING
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 PAD DETAIL GENERAL NOTES & MISC. DETAIL .
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
C
L OF PROPOSED MEDIAN

LHS RHS
E

E
PCC PCC
® ®
LEVELLING LEVELLING
PAD TOP PAD TOP
TYPICAL CROSS SECTION
(FOR REWALL WHERE GROUND WATER TABLE IS NOT
PRESENT AT SHALLOW DEPTH BELOW LEVELING PAD)
D

D
SCALE 1:125

C
L OF PROPOSED MEDIAN

LHS WALL RHS WALL


C

C
B

B
PCC PCC
LEVELLING ® ® LEVELLING
PAD TOP PAD TOP

DISCLAIMER: TYPICAL CROSS SECTION-I


The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision 3100 section specification. Design (FOR REWALL WHERE GROUND WATER TABLE IS AT
parameters considered in the design report TAInd-S/22946/R0 dated August 2022 shall be validated and executed at site without any deviations. SHALLOW DEPTH BELOW LEVELING PAD)
Wherever Water table is present at PCC Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out. SCALE 1:125
REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 13/12/2022
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 03/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DET-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: TYPICAL CROSS SECTION,CRASH BARRIER,LEVELLING
00 13.12.22 RTR RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 PAD DETAIL GENERAL NOTES & MISC. DETAIL .
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
C
L OF PROPOSED MEDIAN

LHS WALL RHS WALL


E

E
PCC PCC
LEVELLING ® ®
LEVELLING
500

500
PAD TOP PAD TOP
TYPICAL CROSS SECTION-II
(FOR REWALL WHERE GROUND WATER
TABLE IS ABOVE OR NEAR TO LEVELING PAD)
SCALE 1:125
D

D
PERFORATIONS Ø6mm
APPROX. 12 STAGGERED
HOLES PER RUNNING METER/PER ROW
D E VE L OP E D
F ER PL
RE AN
X= =
c
=
= =

Q Q

=
=

d d
=
=
C

C
a b

PERFORATIONS Ø6mm
APPROX. 12 STAGGERED
HOLES PER RUNNING
METER/PER ROW

Ø 160mm SEMI PERFORATED


PVC WRAPPED WITH
NON-WOVEN GEOTEXTILE
(MIN. 142 GSM)

DETAIL-'SP2'
DETAIL-'SP1'
TOP PLAN AT SEMI PERFORATED PIPE SECTION Q-Q SCALE 1:20
SCALE 1:20
B

B
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 17/05/2024
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 BSC RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 04/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DET-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: TYPICAL CROSS SECTION,CRASH BARRIER,LEVELLING
00 17.05.24 BSC RK SK ISSUE FOR APPROVAL ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66 PAD DETAIL GENERAL NOTES & MISC. DETAIL .
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
PCC PCC PCC PCC
LEVELLING LEVELLING LEVELLING LEVELLING
PAD TOP PAD TOP PAD TOP PAD TOP
(TYP.) (TYP.) (TYP.) (TYP.)

DESIGN SECTION-1 DESIGN SECTION-2 DESIGN SECTION-3 DESIGN SECTION-4


(PANEL HEIGHT=2.0m) (PANEL HEIGHT=2.4m) (PANEL HEIGHT=2.8m) (PANEL HEIGHT=3.2m)
(H1=2.0m, H2=0.6m) (H1=2.4m, H2=0.6m) (H1=2.8m, H2=0.6m) (H1=3.2m, H2=0.6m)
qult = 193.65kPa qult = 216.17kPa qult = 231.50kPa
E

E
qult = 253.13kPa

PCC
LEVELLING PCC PCC PCC
PAD TOP
LEVELLING LEVELLING LEVELLING
(TYP.) PAD TOP PAD TOP PAD TOP
(TYP.) (TYP.) (TYP.)
D

D
DESIGN SECTION-5
(PANEL HEIGHT=3.6m) DESIGN SECTION-6 DESIGN SECTION-7 DESIGN SECTION-8
(H1=3.6m, H2=0.6m) (PANEL HEIGHT=4.0m) (PANEL HEIGHT=4.4m) (PANEL HEIGHT=4.8m)
qult = 283.99kPa (H1=4.0m, H2=0.6m) (H1=4.4m, H2=0.6m) (H1=4.8m, H2=0.6m)
qult = 303.17kPa qult = 333.17kPa
qult = 367.47kPa
C

C
PCC PCC PCC
LEVELLING LEVELLING LEVELLING
PAD TOP PAD TOP PAD TOP
(TYP.) (TYP.) (TYP.)

DESIGN SECTION-9 DESIGN SECTION-10 DESIGN SECTION-11


(PANEL HEIGHT=5.2m) (PANEL HEIGHT=5.6m) (PANEL HEIGHT=6.0m)
(H1=5.2m, H2=0.6m) (H1=5.6m, H2=0.6m) (H1=6.0m, H2=0.6m)
B

B
qult = 431.44kPa
qult = 374.30kPa
qult = 394.84kPa
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 13/12/2022
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 01/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DS-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: DESIGN SECTIONS
ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
PCC PCC PCC
E

E
LEVELLING LEVELLING LEVELLING
PAD TOP PAD TOP PAD TOP
(TYP.) (TYP.) (TYP.)

DESIGN SECTION-12 DESIGN SECTION-13 DESIGN SECTION-14


(PANEL HEIGHT=6.4m) (PANEL HEIGHT=6.8m) (PANEL HEIGHT=7.2m)
(H1=6.4m, H2=0.6m) (H1=6.8m, H2=0.6m) (H1=7.2m, H2=0.6m)
qult = 490.73kPa
qult = 456.86kPa qult = 501.55kPa
D

D
C

C
PCC PCC PCC
LEVELLING LEVELLING LEVELLING
PAD TOP PAD TOP PAD TOP
(TYP.) (TYP.) (TYP.)

DESIGN SECTION-15 DESIGN SECTION-16 DESIGN SECTION-17


(PANEL HEIGHT=7.6m) (PANEL HEIGHT=8.0m) (PANEL HEIGHT=8.4m)
(H1=7.6m, H2=0.6m) (H1=8.0m, H2=0.6m) (H1=8.4m, H2=0.6m)
qult = 538.92kPa
qult = 542.77kPa qult = 580.44kPa
B

B
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 13/12/2022
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 02/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DS-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: DESIGN SECTIONS
ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
E

E
PCC PCC
LEVELLING LEVELLING
PAD TOP PAD TOP
(TYP.) (TYP.)

DESIGN SECTION-18 DESIGN SECTION-19 DESIGN SECTION-20


(PANEL HEIGHT=8.8m) (PANEL HEIGHT=9.2m) (PANEL HEIGHT=9.6m)
(H1=8.8m, H2=0.6m) (H1=9.2m, H2=0.6m) (H1=9.6m, H2=0.6m)

qult = 632.91kPa
qult = 604.52kPa qult = 648.63kPa
D

D
C

C
PCC
LEVELLING
PAD TOP
(TYP.)

DESIGN SECTION-21
(PANEL HEIGHT=10.00m)
(H1=10.0m, H2=0.6m)
B

B
qult = 683.73kPa

DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 13/12/2022
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 03/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DS-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: DESIGN SECTIONS
ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
F

F
E

E
PCC PCC PCC
LEVELLING LEVELLING LEVELLING
PAD TOP PAD TOP PAD TOP
(TYP.) (TYP.) (TYP.)

DESIGN SECTION-18A DESIGN SECTION-19A


DESIGN SECTION-17A
(PANEL HEIGHT=8.8m) (PANEL HEIGHT=9.2m)
(PANEL HEIGHT=8.4m)
(H1=8.8m, H2=0.6m) (H1=9.2m, H2=0.6m)
(H1=8.4m, H2=0.6m)
qult = 662.970kPa
qult = 607.030kPa qult = 628.610kPa
D

D
C

C
DISCLAIMER:
The design and drawing of RE wall is issued as per BS 8006-1: 2010 /IRC SP 102-2014/MORTH 5th Revision
PCC 3100 section specification. Design parameters considered in the design report TAInd-S/22946/R0 dated August
LEVELLING 2022 shall be validated and executed at site without any deviations. Wherever Water table is present at PCC
PAD TOP
(TYP.)
Levelling pad at site then 500mm Thick (minimum) GSB/Granular Filling as per TCS-I&II shall be carried out.

DESIGN SECTION-20A
(PANEL HEIGHT=9.6m) NOTES:
(H1=9.6m, H2=0.6m)
B

B
qult = 667.740kPa

REVISIONS CLIENT:

NATIONAL HIGHWAYS AUTHORITY OF INDIA


PROJECT:
CONSTRUCTION OF Reinforced Earth® WALL FOR
TERRE ARMEE INDIA PROJECT NO. SCALE SHEET SIZE REV.

(Ministry of Road Transport & Highways) SIX LANING FROM THALIKULAM TO KODUNGALLUR SECTION OF (REINFORCED EARTH INDIA PVT. LTD.) 22946 AS SHOWN A3 00
NH-66 (OLD NH-17) FROM DESIGN CH. 369.015 (EX. KM 382.300) TO E-11, BLOCK-B1 EXTENSION,
DESIGN CH. 397.750 (EX. KM 411.850) IN THE STATE OF KERALA DRAWN CHECKED BY APPROVED DATE
DESIGN CONSULTANT: MOHAN CO-OPERATIVE INDUSTRIAL ESTATE,
M/s URS SCOTT WILSON PVT. LTD. ON HYBRID ANNUITY MODE UNDER BHARATMALA PARIYOJANA.
TERRE ARMEE MATHURA ROAD, NEW DELHI-110044 INITIAL FINAL
KN 13/12/2022
3rd Floor, Building No.-8A, DLF Cyber City, Tel: +91 11 46457600-7601, F +91 11 46457630 RTR RK SK
A

A
STRUCTURE: Leaders in Innovation and Technology
Gurgaon-122002,Haryana,India
www.terrearmeeindia.com DRAWING NO. SHEET No.
CONTRACTOR:
VUP AT CH 378+576 04/04
P ROPRI E TARY AND CONF IDE NT IAL TAInd-S/22946/378+576/DS-01
SHIVALAYA CONSTRUCTION CO. PVT. LTD.
TITLE:
DRAWING STATUS:
CONCESSIONAIRE: DESIGN SECTIONS
ISSUE FOR APPROVAL
KODUNGALLUR HIGHWAYS PVT. LTD NH-66
REV DATE DRN CHK REW AMENDMENTS
1 2 3 4 5 6 7 8

You might also like