Installation Manual COLOR BEST

The document provides standard installation instructions for COLORBEST roofing tiles, detailing the necessary roof accessories, fastening methods, and substrate requirements. It specifies materials, dimensions, and installation techniques for various components such as built-up roofing, eaves edges, and ridges. Additionally, it emphasizes the importance of using genuine materials to ensure durability and compliance with safety standards.

Uploaded by

soblonk jawa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views100 pages

Installation Manual COLOR BEST

The document provides standard installation instructions for COLORBEST roofing tiles, detailing the necessary roof accessories, fastening methods, and substrate requirements. It specifies materials, dimensions, and installation techniques for various components such as built-up roofing, eaves edges, and ridges. Additionally, it emphasizes the importance of using genuine materials to ensure durability and compliance with safety standards.

Uploaded by

soblonk jawa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 100

4.

Standard Installation Instruction


1. Standard Roof Accessories
●To install COLORBEST roofing tiles, use roof accessories that meet the specifications listed in the table below.

Accessory Item Specification


Built-up roofing Material Genuine roofing / equivalent to or greater than Asphalt roofing 940
Metallic Material Genuine accessories / JIS G 3312 (Class 2 for roof) or equivalent, 0.35 mm or more in thickness
accessories
Sheathing caps JIS G 3312 (Class 2 used for roof) or equivalent, 0.28 mm or more in thickness
(*1)
Wall end accessories Recommended to use genuine accessories / prepainted stainless steel (SUS304), 0.3 mm or more in thickness (for rust and corrosion protection)
Salt damage and hot spring areas (Common to all accessories) Recommended to use prepainted stainless steel (SUS304) accessories, 0.3 mm or more in thickness (for rust and corrosion protection)
Fastening nails Used to Wood substrates Genuine nails/screws

Standard Installation Instruction


and screws install roofing tiles
Pearlite steel substrates Genuine nails/screws or stainless steel nails for pearlite steel substrates
(*2)
Hard cement wood chip board substrates (18 mm) Genuine nails/screws or stainless steel countersunk head tapping screws, φ4.0 mm x L30 (35) mm or more
Salt damage and Wood substrates/Pearlite steel substrates Genuine nails/screws or stainless steel annular ring nails, φ3.2 mm x L32 (35) mm or more
hot spring areas
Hard cement wood chip board substrates (18 mm) Genuine nails/screws or stainless steel countersunk head tapping screws, φ4.0 mm x L30 (35) mm or more
Used to Used to fix accessories
fix accessories other than those listed Applicable to all substrates
below Genuine nails/screws or stainless steel (SUS304) threaded nails, φ2.1 mm x 32 mm or more
Used to fix eave edge flashing Wood substrates/Pearlite steel substrates
and corner ridge accessories,
and valley plates Hard cement wood chip board substrates (18 mm) Stainless steel countersunk head tapping screws, φ4.0 mm x L25 mm or more
Used to fix corner Wood substrate/Pearlite steel substrates Genuine nails/screws or stainless steel threaded nails, φ2.1 mm x L32 (35) mm or more
part (*2)
Hard cement wood chip board substrates (18 mm) Stainless steel countersunk head tapping screws, φ4.0 mm x L35 (40) mm or more (*3)
Used to Wood substrates General areas
fix copings Stainless steel nails, φ3.4 mm x L75 or more
Pearlite steel substrates Salt damage and hot spring areas

Hard cement wood General areas


Stainless steel countersunk head tapping screws, φ4.0 mm x L60 mm or more
chip board substrates Salt damage and hot spring areas

Used to Wood substrates General areas


fix ledger strips Stainless steel nails, φ2.7 mm x L50 mm or more
Pearlite steel substrates Salt damage and hot spring areas

Hard cement wood General areas


Stainless steel countersunk head tapping screws, φ4.0 mm x L35 mm or more
chip board substrates Salt damage and hot spring areas

Used to fix free ridge roofing tiles Genuine nails/screws


Copings Resin impregnated wood, etc. Genuine copings (made of high impact polystyrene)
(*4) Wood - Wood with sapwood eliminated wherever possible and less deformation
- Recommended to use preservative-treated wood
Do not use any preservative containing copper. It may cause sheet metal
accessories, nails, and other to corrode.
(To use any ridge coping not treated with preservative, cover it with roofing.)
Adhesive Roof Keeper (one-component modified silicone-based adhesive) or polyurethane-based adhesive
Sealant Roof Keeper (one-component modified silicone-based adhesive) or other one-component modified
silicone-based adhesive, or one-component modified polyurethane-based adhesive

*1: The hemming and seaming height of permanent portions should be 2 to 3 mm. (See pages 16 to 18 for details.)
*2: Length of fastening nails and screws (unit: mm) Used to install roofing tiles Used to fix corner part
Type of roofing tile Annular ring nail Tapping screw Nail Screw
COLONIAL and SAVORY 32 30 32 35
All COLORBEST series 35 35 35 40

*3: If the screws that fix the corner part come into contact with their substrate, use shorter screws to fix the ridges to the hard cement wood chip board.
*4: Wood dimensions (unit: mm)
Verge Flat ridge Corner ridge Wall arrangement

Ranking beam Coping Coping Ridge direction Roof slope direction


Type of roofing tile Specification of accessory
*5 *5 *5 Coping Ledger strip Coping
Metallic accessories 18×45 18×90 18×90 18×90 18×45 18×90
COLONIAL and SAVORY Free Ridge
18×90 18×45 18×45
and Free Ridge GLASSA
Metallic accessories (18~21)×45 18×90 18×90 18×90 21×45 18×90
PROUD, RAYCIOUS,
Free Ridge
GLASSA 600, and SUPERIOR II 21×90 21×45 21×45
Grain-like GLASSA

*5: Ledger strips should be used for Free Ridge, Free Ridge GLASSA, Free Ridge Grain-like GLASSA, and Free Ridge Natural Grain-like GLASSA roofing tiles.

51
4. Standard Installation Instruction
2. Standard Installation Instructions for Substrates

Item Standard Installation Instructions

Wooden framework construction, Wood-frame construction Plywood substrate


(Two-by-four) method

●Space between rafters should be 500 mm or less.


●Sheathing should be free from any significant difference in level,
unevenness, deflection, and gap.
Standard Installation Instruction

Standards: Differences in level should be 3 mm or less.


Unevenness should be 3 mm or less per space between
rafters.
Sheathing
●There should be no loose nails from substrates and no protrusions
of metal fittings.
●Sheathing as per roof substrate standards should be used (see
page 50).

Rafter
500 or less
500 or less

Noncombustible substrate Hard cement wood chip board substrate

Example: Used for 30-minute fire resistant roofing construction


1) 30-minute fire resistant roofing construction, (ii) Quasi-fireproof
construction 2 300
300 or less
●Space between rafters should be 606 mm or less. or less
●Dimensions of rafter: Made of channel steel measuring 100 × 50×
Purlin: [ - 100×50×20×2.3
20 × 2.3 mm or more
●Sheathing: Hard cement wood chip boards of 18 mm or more in
thickness
Prior check items (Nichiha “Century” fireproof sheathing)
●Hard cement wood chip boards should be free from any difference 606 or less
in level and gap.
Standard: Differences in level should be 3 mm or less.
●There should be no loose nails from substrates.
606 or less
2) Any construction other than 1)
●Follow the standards for the “wooden framework construction”; Fireproof coating (1-hour fire resistant)
to be used in cases where a distance
provided, however, that, in case of space between rafters exceeding between the floor surface and the bottom
Countersunk head end of the beam is 4 m or less
500 mm, space between the rafters should be 606 mm or less and tapping screws (Notification No. 1399 of the Ministry of
the thickness of plywood sheathing should be 15 mm or less. (φ4.0 mm x L30 mm or more) Construction, year 2000)

Concrete-based substrate Concrete-based substrate

●Use pearlite mortar as substrate.


●T he pearlite mortar substrate should be 40 mm or more in
thickness.
●Make the surface of the pearlite mortar substrate smooth wherever
possible.
Standard: Differences in level should be 3 mm or less. Surface level
Approx. control ruler
Unevenness should be 3 mm or less per width of 500 (joint bar)
1.5 to 2.0 m
mm.
●Install with concrete joint bars (surface level control rulers) at 40 or more
spaces of 1.5 to 2.0 m in order to disperse substrate contraction
and make adjustment of upper surface level.
●The substrate should bear nail holding force of 344 N (35 kg) per
nail and allow for driving the nail in order to install roof tiles.

52
4. Standard Installation Instruction
3. Standard Installation Instructions for Built-up Roofing

Item Standard Installation Instructions

●Make lateral laying in principle from the eaves edge to


the ridge.
●Overlap built-up roofing by 100 mm or more in the roof
slope direction (longitudinal direction) and by 200 mm or 100 or more
more in the ridge direction (lateral direction).
Laying and Sheathing
●Fix the overlapped portion at spaces of approx. 300 mm
fastening on

Standard Installation Instruction


and other important points with a tucker (or stapler). 200 or more
flat areas 100 or more
For NOAGUARD II, fasten the overlapped portion at
spaces of approx. 150 mm.
*
x. 300
Appro
* Spacing for fixing with a tucker or stapler.
For NOAGUARD II, fasten at spaces of approx. 150 mm.

●Overlap built-up roofing by approx. 30 mm on the eaves


edge flashing (equivalent to half of the width of the
flashing).

Built-up roofing
Laying on
eaves edges Sheathing
Approx. 30

●Lay the built-up roofing aligning it with the end of the Additional laying of
sheathing. built-up roofing
●Mount a ranking beam as an additional layer, and then (500 mm in width)
additionally lay built-up roofing of 500 mm in width over Built-up roofing Ranking beam*
the full length of verge.
Laying on At this time, raise the built-up roofing along the ranking Sheathing
Built-up roofing
verges beam.
* When TOUGHMOCK or preservative-treated wood is used Approx. 30
as a ranking beam, the built-up roofing needs not to be
raised by additionally laying it.

●Lay the built-up roofing by 100 mm or more each across


the center of the ridge to overlap it by 200 mm or more.

or more
or more

Laying on
or more
flat ridges or more

●Make the lower hem of the built-up roofing protrude


from the center of the corner ridge by 100 mm,
respectively, to double the roofing.

Laying on
corner ridges
Double the built-up roofing.

Center of corner ridge


100 or more

53
4. Standard Installation Instruction
3. Standard Installation Instructions for Built-up Roofing

Item Standard Installation Instructions

●Raise the built-up roofing by 50 mm or more from the


top end of flashing both in the ridge and roof slope Additional laying of built-up roofing*
directions. Raise the roofing by 50 mm or more from
the top end of the flashing.
(Raise the roofing itself by approx. 200 mm.) (Raise the roofing itself by approx. 200 mm.)
* If no face bar is provided on the wall surface,
additionally lay the built-up roofing (of 500 mm in
Standard Installation Instruction

width) all over the wall joint area.


Laying on wall (If face bar is provided and there is no risk of causing
joint areas damage to the roofing, additionally lay the roofing of
500 mm in width only on the external corner angle of
the wall.) Approx.
Roof slope
Additional laying of direction 250*
built-up roofing
Lay the roofing in a way
that causes no pinholes.

●Lay permanent built-up roofing (approx. 1000 by 500 App


rox
mm) on the wall surface. . 50
0
Permanent
built-up roofing
Laying on the
joint areas of
Built-up roofing roof and wall
Approx. 1000

Do not tack the bottom end.

●Lay permanent built-up roofing of 1000 mm in width


over the entire length of valley. 500
●Subsequently, protrude the upper side of the roofing Permanent built-up roofing 500
(of 1000 in width)
100 mm or more from the valley center, and then double
Valley center 100 or more
the roofing to lay it on the valley.

Laying on
valleys

Double the
built-up roofing

54
4. Standard Installation Instruction
4. Standard Installation Instructions for COLORBEST

Item Standard Installation Instructions

COLORBEST (except GLASSA 600)


●Install each roofing tile shifting it by a half piece of the tile (aligning an
alignment mark on the right/left side of tile with that on the top-end Cut by approx. 100 mm (shouldering).
center of a tile underneath). Alignment mark
Alignment mark
Making line

Standard Installation Instruction


Part A
Third row 212
Second row
First row 20
Verge flashing 182 Eaves edge
Enlarged Part A Eaves plate flashing

●Fix each roofing tile with four roofing nails.


Eaves
●The working length of roofing tiles should be 182 mm or less.
edges
General
GLASSA 600
areas
●Place and install each roofing tile shifting it by 202 mm (by a one-third
piece of the tile) from the left end of an adjacent tile. Cut by approx. 100 mm (shouldering).

Alignment mark Making line


Place and install the roofing tile shifting it
by 202 mm (by a one-third piece of the tile)
202 from the left end of an adjacent tile.
Third row
Normally, do not make any Second row Part A
prepared holes.
First row 222
20
Enlarged Part A
Verge
flashing 182 Eaves plate
●Fix each roofing tile with two roofing nails. Eaves edge flashing
●The working length of roofing tiles should be 182 mm or less.

●Cut the top end of a roofing tile to be overlaid on the permanent verge
by approx. 100 mm (shouldering). 100
●In order to lay a narrow roofing tile on the verge, use roofing nails and Cut by approx. 100 mm
(shouldering).
adhesive in combination to fix the tile.
Roofing
tile Verges

Verge flashing
Eaves edge
flashing

●Install roofing tiles so that the length of those in the uppermost row will Alignment mark

come to 150 to 232 mm.


232

●To install copings, drill prepared holes in coping and roofing tile, and
then fix copings to rafter at spaces of 500 mm or less with nails used Size roofing tiles to be installed in the uppermost row to
150 to 232 mm (at the position of alignment mark).
to fix copings.
●To fix copings only to sheathing, fix the copings with screws used to fix Roofing tile
(with the top end cut)
copings following the same procedure as that for nails.
●To install copings, apply sealant to them for waterproofing.
 No waterproofing treatment is required when TOUGHMOCK is used
in place of copings.
Roofing tile
Flat
ridges
Verge flashing

s
es Nail used to fix
rl
5o roof accessory
45
Coping, 18×90 Ridge cover

Built-up roofing Roofing tile

Sealant

Verge flashing

55
4. Standard Installation Instruction
4. Standard Installation Instructions for COLORBEST

Item Standard Installation Instructions

Ridge cover installation instruction


Center of corner ridge
●To use ridge cover, cut the center of the ridge by approx. 140 to 150
mm. (Corner cut)
●In order to put a narrow roofing tile in the center of corner ridge, use
roofing nails and adhesive in combination to fix them.
●To install a coping, drill a prepared hole in the coping and roofing tile Cut (Corner cut)
Standard Installation Instruction

roughly through the center of the tile, and then fix the coping to a hip for
Adhesive
roofing with a nail used to fix coping.
●Clip nails to fix the copings on every two rows. Nail the coping roughly
in the middle of working length of the roofing tile. Position of coping
●To fix copings only to sheathing, fix the copings with screws used to fix Position of nail
Cut (Corner cut) by
Corner copings following the same procedure as that for nails. approx. 140 to 150
ridges

Built-up roofing
455 or less

Nail to fix roof accessory

Corner part installation instruction


Roofing ●Align the right and left ends of roofing tiles at the corner ridge. 50
tile 70
●Make a prepared hole in a position 80 mm away from the bottom end
and 40 mm away from the center of the ridge, and then fix a roofing tile
to the corner ridge with a nail. Marking line
●Fix the corner part with two nails. 40
Sealant
80

Nail to fix the corner part (Two nails)

Corner

Eaves edge flashing

●O verlap built-up roofing on a valley by approx. 60 mm. Cut the top Valley plate Marking line
end of a roofing tile to be overlaid on the valley by approx. 70 mm
(shouldering).
●Fix narrow roofing tiles using nails and adhesive in combination.
Cleat Cut the top end of the roofing tile
by approx. 70 mm (shouldering).

Valleys App
rox.
60 455 or less
Approx. 60

Eaves edge flashing Sheathing

56
4. Standard Installation Instruction
5. Standard Installation Instructions for Metallic Accessories

Item Standard Installation Instructions


Accessory/Shape Overlaid Application
of sealant to Spaces to clip
(“▼” indicates the position of Material dimension at Fixing Specified dimension
overlaid sections nail/cleat (mm)
a nail to fix the accessory.) joints at joints
Eaves edge flashing

Standard Installation Instruction


NO

Verge flashing
JIS G 3312
(Class 2 used for roof) or
equivalent material, 0.35
Permanent plate mm or more in thickness NO

Permanent plate
The height of hemming
and seaming of the
Permanent plate permanent plate should
Ridge cover plate
Permanent be 2 to 3 mm.
used for steep ridge
Permanent plate
Fix with nails
Permanent plate 50 mm used to fix
YES
or more the relevant
accessory.
Metallic
accessories Riser dimension 455 mm
or less
Flashing Riser dimension *1

Riser dimension
Riser dimension Riser dimension should be
YES
70 mm or more.
Riser dimension

Riser dimension

Permanent flashing Salt damage and


Permanent plate
hot spring areas
Permanent plate - Recommended
Cleat
Full width to use prepainted NO
Cleat
Permanent plate stainless steel (SUS304)
FullPermanent
width plate accessories, 0.3 mm or
Cleat plate more in thickness
Permanent platePermanent
Permanent
plate
Full widthCleat
Permanent plate Permanent
FullPermanent
width plate
Valley Cleatplate Valley length is less than 5 m:
Full width valley plate approx. 280 mm
Cleat plate
Permanent plate Permanent Fix with cleats.
YES in full width.
Permanent plate Permanent plate
Full width 100 mm Do not directly
Double coating
or more drive nails in
Permanent plate Permanent plate of sealant Valley length is 5 m or more:
the accessory.
valley plate approx. 420 mm
Permanent plate Permanent plate in full length.

*1: If accessory length is based on meter module, spaces of 500 mm or less are acceptable.

57
6. Before Installation
1. Safety and Health
<1> Instruction for Safety Work
Strictly observe the safety regulations based on the principle that
“Safety is the top propriety.” In installing COLORBEST roofing tiles, carry
out thorough installation management and safety work to prevent any
industrial accident.
Wear proper working clothes for the work!
<2> Safety Work for Roof Construction
“Falls” are the most common accident at roof construction sites.
Wear a helmet to Helmet
Scaffolds, stepladders, ladders, and trestles carry a lot of risks and
protect from flying or falling (Tighten the
thereby require particular attention. Since roof construction involves
objects, or protect yourself chin strap.)
work in high places, a fall accident can result in a serious or life- in the event of a fall.
Before Installation

threatening accident.
It is essential to observe safety standards for the prevention of these
accidents.
Wear clean
and comfortable
(1) Wearing of proper clothing and personal protective work clothes.
equipment
●W ear a set of working clothes according to your physical
constitution and the climate. Zip the jacket.
●Choose and wear proper working clothes for the work.
●Choose and wear personal protective equipment that meets the Wear
safety and health regulations for the work. a safety
●Check the personal protective equipment. Do not use any aging or Tighten harness.
damaged equipment. your cuffs.
●Be sure to wear a helmet. Wear the helmet flat atop your head and
tighten the chin strap.
●Wear a safety harness to work in high places. Wear shoes
●Wear shoes with a non-slippery and unworn sole. with a non-
slippery sole.
(2) Check before work
●Have a meeting on safety before commencing installation work and
look over work environment on site beforehand.
●Check the workplace and the surroundings of the job site.
●Check working tools and material storage conditions.
●Make thorough preparation for safety work, “Keep zero accident.”
Wear a helmet to protect yourself in the event of a fall
(3) C ases where an instruction must be given to (Administrative Guidance Notice 660 issued by Director of
Labour Standards Bureau of the Ministry of Labour on November 11, 1996)
suspend installation work
●It rains or is highly likely to rain.
Useful life of helmet
●Scaffolding is wet after the rain, or with fog or dew, and thereby slippery.
●It is blowing a gale or gusting, or a strong wind warning is issued. Material Standards for disposal or replacement
●Lightning and thunder occur and there is a fear of lightning strike. ABS, PC, or PE (Thermoplastic resin) Within 3 years even if no abnormality is found.
●Snowfall or lingering snow
FRP (Thermosetting resin) Within 5 years even if no abnormality is found.
●If temperature or humidity rises and workers are likely to get heat
stroke, suspend installation work in progress, and then take a break. Chin strap Within 1 year even if no abnormality is found.
●Inadequate or shaky scaffolding (Source: Helmet Handling Manual issued by the Japan Helmet Manufacturers Association)

Name Taro ****

Blood type **

**, ****cho, **** City


Contact
**** Construction Company
information TEL: +81- -
** ***-****

Clearly indicate the name, blood type,


and contact address and telephone
number of the worker on the helmet to
provide against contingencies.

68
6. Before Installation
1. Safety and Health
<2> Safety Work for Roof Construction
(4) S afety work standards for using a ladder or
Approx. 60 to 70 cm or more
stepladder
●B efore using a ladder or stepladder, check it for any damage,
deformation, or abnormalities in the fixing metal fittings.
●Install and fix a ladder or stepladder on the even surface.
●Do not set a ladder up from the roof of the first floor to that on the
second floor to climb it up and down. Doing so will induce an
imminently hazardous situation.
●Provide a slip stopper for the ladder feet and fix the top of the ladder
to prevent it from sliding sideways or falling down. In the event of

Before Installation
deflection amplitude, mount a deflection preventive device in the
middle of the ladder.
Set the ladder up at an angle of 75 degrees and protrude it by 60 to
70 cm from the highest position to climb up. The ladder width should Check for
any slack or
be 30 cm or more.
disconnection.
●It is recommended to use a ladder by two persons, wherever
possible.

Approx. 75 deg.
Slip stopper

(5) Safety work standards for roof construction work


with the use of scaffolding
●C heck in advance whether the scaffolding is constructed as
specified, and securely supported and fixed.
●Do not climb up and down the struts of the scaffolding to and from
the roof. Jack base
●To work on the scaffolding, fix the lanyard of the safety harness to Handrail
the strut.
●Ensure that the scaffolding around the eaves edges is constructed
as shown in the diagram on the right.
●If the substrate is slippery even on the slant of a roof of 6/10 or more
or less, ensure that roof scaffolding is provided.

●Be sure to use a rubber mat or plywood panel


below each jack base.
Directly installing jack bases on the roofing tile
may result in cracks in the tile. [Example of Roof Scaffolding Construction]

(6) P revention of roofing tiles from slipping down


●After lifting roofing tiles onto the roof surface, lay them out as shown
in the diagram on the right and pay utmost attention not to cause the
roofing tiles and roof accessories to slip down from the roof.

Verge Roofing tile


Install roofing tiles as soon as
they are lifted on the roof.

Eaves edge

69
6. Before Installation
1. Safety and Health
<2> Safety Work for Roof Construction
(7) Wearing of safety harness to work in high places
(Reference diagram)
●Wear a safety harness to work in 2-meter or more high places. Main rope
●Securely fasten the waist fastening belt of the safety harness on The lanyard
should be 2
your hipbone so that the belt will not come off your body for
meters or less
protection against falls. in length.
●Hang the hook upper than your waist as much as possible so that
you will not go into the floor or a structure in the event that you fall
from the place.
●Check for the position of the main rope from time to time in order to
Before Installation

prevent you from slipping on it.


●Keep in mind to check the grip on your shoe’s sole while walking.

Latch

Strap (High tenacity rope) Sewn protection tube Hook

Hook hanging ring D-ring Safety device


Belt loop Selector button D-ring latch End stop bump

Buckle Shock absorber Waist belt

Hook storage bag Winder

In order to hang the lanyard on a sharp edge,


Hipbone use a block to prevent it from coming into
direct contact with the edge.

(8) Protection against falls


●NEVER attempt to get on any roofing tile or roof accessory that is not
nailed.
●If there is an opening in the roof such as a skylight, put a lid such as
plywood on the opening until the commencement of installation
work and pay careful attention not to fall from it.

(9) Precautions for health and safety (10) Precautions for dismounting and repair work
●Prolonged and massive inhalation of dust in the course of cutting, ●To dismount or repair COLORBEST flat roofing slate tiles, remove
drilling, and dismounting work may impair your health. Conduct such nails to dismount them with hands. Carefully lower the dismounted

a
work observing the following precautions: slate tiles to the ground using a roofing tile lift.
1) Install a local exhaust ventilation system in an indoor workplace in ●R oofing tiles with “a” mark on their
which dust scatters. reverse side contain asbestos. However,
2) Wear a dust mask during work, as appropriate. (Wear a dust mask some products without “a” mark on the
particularly for reroofing and dismounting roofing tiles.) reverse side fall under the category of “a” mark represents
3) After handling roofing tiles, be sure to gargle and wash your hands. asbestos-containing product. If you are asbestos-containing product.
4) Thoroughly clean dust off your work clothes. not sure whether your product falls under the said category, please
5) Dispose of remaining materials such as chips in a safe manner. contact your KMEW representative.
6) To cut and drill roofing tiles, etc., be sure to use the KMEW single ●Since the asbestos-containing products are solidified with cement,
cutter. asbestos will not scatter or be diluted in a normal state.
●To dismount asbestos-containing construction materials, follow the
provisions of the “Ordinance on Prevention of Health Impairment due
to Asbestos” enforced on July 1, 2005.

70
6. Before Installation
2. Proper Handling of Roofing Members
(3) Carrying
(Storage precautions)
●To transport roofing tiles by vehicle, stack them flat, tie up them with
●Do not get roofing members wet. Doing so may a rope, and be sure to apply a block to edges.
cause plates to deflect, shrink, or become ●To load roofing tiles, lay a thoroughly clean and dry sheet on the
efflorescent after they are installed. loading platform in advance.
CAUTION ●Load roofing tiles so as not to cause them to protrude from the
Be sure to store roofing members with a sheet put vehicle.
●Pay utmost attention not to cause damage to the edges of roofing
over them on installation site
tiles when unloading them.
●To lift roofing tiles, apply a block to edges to prevent damage to
them from being caused by tying them up with rope.
●Do not throw or roughly handle roofing tiles.
(Handling precautions)

Before Installation
●To lift roofing tiles by a crane, be sure to stack them on pallets.
●Do not roughly handle COLORBEST roofing slate
tiles by means that apply a string impact, such as
by throwing them. Doing so may cause the tiles to
break.
CAUTION (4) Disposal of waste materials
●To remove waste materials from installation site, collect small
 ince COLORBEST tiles are fragile, handle them
S leftover materials wherever possible.
with care. ●D ispose of waste materials as industrial waste pursuant to the
provisions of the “Waste Management and Public Cleansing Act.”
●In order to appropriately dispose of waste materials, the manifest
(1) Handling in warehouse system (manifest for industrial waste) is required to use for the
procedure of checking a flow of “Discharge → Collection/
●In order to prevent the collapse of cargo, use equal-sized pallets and
Transportation → Disposal.”
stack them four or less high in warehouse.
●To dismount asbestos-containing construction materials, follow the
Do not stack any pallets on which unpacked roofing tiles are placed.
provisions of the “Ordinance on Prevention of Health Impairment due
●Place pallets in solid and horizontal locations indoors.
to Asbestos” enforced on July 1, 2005.
●Protect roofing tiles from rainwater and stains.
●Do not directly place roofing tiles on the ground for storage. If no
pallets are available for use, use square timbers as fillers.

(2) Installation site (5) Collection of remaining and leftover materials


●To place roofing tiles, choose a solid and horizontal location near the ●For COLORBEST roofing slate tiles, KMEW has been collecting and
installation site. If you are forced to place them in a location with reusing remaining and leftover materials after installation on a
uneven surface, make leveling adjustment using fillers. nationwide scale as a wide-area recycling-designated industrial
●Put a sheet over roofing tiles to protect them from rainwater leakage waste processor. If you want us to collect the said waste materials,
and fix the sheet so as not to be blown away by wind. please feel free to contact your KMEW dealers.
●In order to prevent the collapse of cargo, do not stack pallets on the
installation site.

Covering to store roofing tiles for a short period of time on installation site
(6) Cutting and processing methods
●In order to beautifully and efficiently cut, drill, and slit roofing tiles,
use the KMEW single cutters. This cutter achieves beautiful,
accurate, and rapid processing, but hardly produces dust.
●M ake constant and appropriate adjustment of the single cutter
blades.
●F or details, refer to information on pages 164 to 167 of this
installation instruction and on the Single Cutter Instruction Manual.

71
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Installation procedure

Installation Procedure

(1) Check whether the standard installation instructions (slant and flow length) and
1) Checking for roof substrates sheathing are proper.


2) Mounting eaves edge flashing (1) Mount eaves edge flashing.


Roofing Tile Installation Instruction

(1) Lay permanent built-up roofing of 1000 mm in width in the valley.


3) Installing built-up roofing (2) Lay permanent built-up roofing on the joint areas for eaves edge and wall.
(3) Lay built-up roofing in a lateral direction by adequately overlapping it.


4) Mounting ranking beam (1) Properly mount ranking beam to the verge.


(1) Lay out roofing tiles in a way that no narrow roofing tiles will be put on the verge
5) Laying out roofing tiles side.
(2) Carefully lay out wall joints and overhang.


6) Lifting COLORBEST roofing slate (1) Thoroughly check for safety measures and maintenance management.
(2) Work to protect against falls of materials.
tile onto the roof

7) Mounting verge flashing, permanent (1) Mount verge flashing, permanent flashing, and valley plates.
flashing, and valley plates The height of hemming and seaming of the permanent plate should be 2 to 3 mm.


(1) Install an eaves plate (starter strip) by protruding it by 20 mm from eaves edge flashing.
8) Installing eaves plates (starter strips) (In snow-covered regions, refer to the installation procedure for snow specifications.)
(2) Install one after another while leaving a space of approx. 1.5 mm between them.


(1) Lay COLORBEST tiles with the alignment marks aligned.
9) Installing COLORBEST tiles (2) Install COLORBEST tiles keeping an approx. 1.5 mm space between them.
(3) Fix COLORBEST tiles with the given number of nails (or screws).


10) Installing roofing tiles to flat and (1) Install roofing tiles and roof accessories following the standard installation instruction.

corner ridges

11) Installing roofing tiles to wall joints (1) Install adequate flashing in the ridge and roof slope directions.


(1) Tidy up remaining materials, chips, roof accessories, nails, etc.
12) Conducting self-check for (2) Check for any defects such as cracks, stains and scratches on roofing tiles and roof
accessories. If any, repair them following the repair procedure set forth on page
installation work 172 to 179 of this installation instruction.

72
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Checking for roof substrates


<1> Rafters
●Ensure that
(1) rafters are installed at spaces of 500 mm or less;
(2) s heathing is used as specified in the Standard
Installation Instruction;
(3) sheathing has no significant differences in level,
uneven surface, deflection, and spacing; and
(4) there are no nails floating from substrates and no
protrusions of metal fittings.
(Standards: Differences in level should be 3 mm or less and
uneven surface should be 3 mm or less per spacing Sheathing
between rafters.)
●L ay sheathing in a staggered arrangement wherever

Roofing Tile Installation Instruction


possible.
●Fix plywood sheathing to rafters with nails used to fix
sheathing at spaces of 300 mm or less. Rafter
T he application standards for “Flat35” of the Japan 500 or less
Housing Finance Agency (former the Housing Loan 500 or less
Corporation) are different from the foregoing in some
provisions. Be sure to check with the “Flat35”
construction specifications.
●Fix hard cement wood chip board substrates to rafters with
nails used to fix sheathing at spaces of approx. 300 mm.

<2> Eaves edges


●Ensure that the end of sheathing protrudes by approx. 40
mm* from covering (a fascia board).
* Determine a dimension for the protrusion considering the Sheathing Sheathing
positional relation with the eaves gutter.
Cant board

Rafter
40* Rafter
40*
To use a cant board,
be sure to make it flush
with sheathing.

Decorative fascia board Decorative fascia board

<3> Verges
●Ensure that the end of sheathing protrudes by approx. 15
mm* from covering (a gable board).
* Intended to prevent the covering (gable board) from
getting dirty.

15*

Decorative gable board

73
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

3. Installing built-up roofing


●Lay built-up roofing all over the roof.
Lay built-up roofing in individual sections following the procedure shown in the diagram below.

Eaves edges and verges Additional laying of Flat area


built-up roofing
(500 mm in width)
100 or more
Built-up roofing Ranking beam*
Sheathing
Sheathing 200 or more
100 or more
Approx. 30 TOUGHMOCK
Roofing Tile Installation Instruction

*
Additional laying of x. 300
Appro
built-up roofing
(500 mm in width)
* Spacing for fixing with a tucker or stapler.
Built-up roofing
For NOAGUARD II, fasten the overlaid
* W hen TOUGHMOCK or preservative- area at spaces of approx. 150 mm.
treated wood is used as a ranking Sheathing
beam, the built-up roofing needs not to Approx. 30
be raised by additionally laying it.

Flat ridges Corner ridges

Double the built-up roofing.

Center of corner ridge


100 or more

Wall joint area Valleys


500
Raise the built-up roofing by 50 mm Permanent built-up roofing
or more from the top end of flashing. 500
(of 1000 in width)
(Raise the roofing itself by approx.
200 mm.) *Additional Valley center 100 or more
laying of
built-up
roofing
Approx. 250

Roof slope
Additional laying of direction
built-up roofing
Lay the roofing in a way
that causes no pinholes.
Double the built-up
roofing.

* If no face bar is provided on the wall surface, additionally lay the
built-up roofing (of 500 mm in width) all over the wall joint area.
(If face bar is provided and there is no risk of causing damage to
the roofing, additionally lay the roofing of 500 mm in width only
on the external corner angle of the wall.)

74
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

4. Installing eaves edge flashing


●In cases where fire protection or other control is required, mount a sheathing cap to prevent the exposure of reverse side of the sheathing.

(Reference for cases where fire protection or


other control is required)
55

Built-up roofing

35
Sheathing 40 Built-up roofing
Sheathing
Rafter
55 Eaves edge
flashing
Sheathing cap
35

40 Rafter
Decorative fascia board

Roofing Tile Installation Instruction


Eaves edge Sheathing cap Mounting method
(KLZNC032) - P ut the sheathing cap in the plywood
flashing with the 45-mm side facing down.
15 : Decorative surface
Temporarily fix the cap with tape until the
Inside eaves edge flashing is installed.
Decorative fascia board dimension
- Butt-lay the joint of the sheathing cap to
45 prevent a clearance from being formed
between the cap and flashing.

●Install the eaves edge flashing to the eaves edge. Sheathing Eaves edge flashing
●Overlap the eaves edge flashings by 50 mm or more.
* Hemming
* Hemming and seaming and seaming
Be sure to hem and seam the top surface of the eaves
edge flashing (by 3 mm or less) in order to prevent the
cut end of roofing tile from opening at the eaves edge.

50 or more

●O n the verge, cut to top surface of the eaves edge


flashing, and then hem and seam it along the sheathing.
Sheathing

Nail used to
fix roof accessories
r less
455 o

Hem and seam


the end
Eaves edge flashing

●At the corner ridge, cover one eaves edge flashing up to


the opposite side of the center of corner ridge.
●In the same way, cover the other eaves edge flashing up Center of corner ridge
Sheathing
to the opposite side.
Eaves edge
flashing

Eaves edge
flashing

75
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

5. Lifting roof members onto the roof


●In order to enhance work efficiency and prevent built-up roofing from
scattering, lay out roofing tiles as shown in the diagram on the right and
pay utmost attention so as not to cause the roofing tiles and roof
accessories to slip down from the roof.
Install the roof members as soon as they are lifted onto the roof.

Verge
Roofing Tile Installation Instruction

Eaves edge

6. Mounting ranking beam


●Be sure to mount a ranking beam on the verge.
●For the sizes of ranking beams, refer to information on page 51. Nail used to fix the ledger strip
●At eaves edges, mount the ranking beam flush in line with the top edge Ranking beam Built-up roofing
of the permanent plate for the eaves edge flashing. (For details, refer to
information on page 74.)
500 or less
●To mount a ranking beam to the verge, protrude it by approx. 15 mm
from the decorative gable board.
●Fix the ranking beam with nails used to fix the ledger strip at spaces of
500 mm or less.

Approx. 15

Decorative gable board

76
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

7. Mounting verge flashing


●After additional laying of built-up roofing, mount a verge flashing to the ranking beam.
Hem and seam the permanent portion of the verge flashing up to a height of 2 to 3 cm.
●In cases where fire protection or other control is required, mount a sheathing cap to prevent the exposure of reverse side of the sheathing.

(Reference for cases where fire protection or other control is required)

Nail used to fix the ledger strip Ranking beam Nail used to fix the ledger strip
Ranking beam
18×45 18×45 Additional laying of built-up roofing
Additional laying of built-up roofing
(of 500 in width) (of 500 in width)
Nail used to fix Nail used to fix
Hemming and seaming height (2 to 3 mm) the roof Hemming and seaming height (2 to 3 mm)
the roof
accessory accessory

Verge flashing Verge flashing

Roofing Tile Installation Instruction


Approx. 15 Approx. 15
Rafter Rafter
(*) Sheathing
cap

Sheathing cap Mounting method


(KLZNC032) - Put the sheathing cap in the plywood
* In case of a steeply-pitched roof, rainwater may blow into the with the 15-mm side facing down.
45
roof in strong winds. In such cases, consider taking measures Temporarily fix the cap with tape until the
to prevent rainwater from being blown in by applying sealant Inside eaves edge flashing is installed.
dimension
or else. - Butt-lay the joint of the sheathing cap to
15 : Decorative surface prevent a clearance from being formed
between the cap and flashing.

●Mount the verge flashing by protruding it by 20 mm from the eaves Sheathing


edge flashing.
●Fix the verge flashing to the ranking beam from the side with nails
used to fix roof accessories at spaces of 455 mm or less. Additional laying of built-up roofing
(of 500 in width)
Nail used to fix Built-up roofing
roof accessories
455 or less

Verge flashing
20 Eaves edge flashing

In order to process the end of verge flashing on site: Cut


(Reference diagram)
●Fold the cut end of the verge flashing.
●Cut the end of permanent portion of the verge flashing at a diagonal
line to discharge water.
A Bend inward at
Bend inward to a right angle.
tuck Part A.
Bend inward to crush. 50
Cut to discharge water.

In order to mount a verge cap:


●Apply adhesive to the reverse side of the verge flashing. Verge flashing
(Apply this to a place approx. 20 mm away from the end of the
verge flashing.)
●P ut the verge cap in the verge flashing, and then fix them Verge cap Apply adhesive.
Put in the flashing.
together to the ranking beam with nails used to fix roof
accessories.
(Drive the nails in the side of the verge flashing in a place approx.
100 mm away from the end of the flashing.)
(Reference diagram) Fold to crush am
stre
●Overlap the joints of the verge flashing by 50 mm or more. Up ide
s
●Hem and seam the permanent plate at the joints to prevent the m
rea
overflow of rainwater from the permanent plate. w nst Put in the upstream side joint.
Do sid e
Cut

50

77
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

8. Installing roofing tiles


Unless otherwise noted, all diagrams shown below represent those for the installation of COLONIAL roofing tiles.
<1-1> Procedure for installing eaves plates (starter strips)
(1) Installation of COLONIAL, SAVORY, Roofing tile
Built-up roofing
SUPERIOR II, RAYCIOUS, and PROUD Eaves plate Sheathing
●Before laying roofing tiles, carry out roof allocation 55
with careful attention so that many of narrow tiles
20
will not be installed on the verge side.
●Be sure to protrude an eaves plate by 20 mm from

35
40 Rafter
the eaves edge flashing.
●Continue to install eaves plates side by side while
leaving a little space between them. Eaves edge
flashing
Roofing Tile Installation Instruction


Excessive butting will cause roofing tiles to
moves around or deflect due to the behavior
of the substrate. Decorative fascia board
●Fix each eaves plate with four roofing nails following
the marking line.
NEVER attempt to drive nails in the permanent plate
of the flashing.
●Cut the eaves plate for the permanent plate of verge
Marking line
flashing by approx. 100 mm in width (shouldering).
Cut by approx. 100 mm
Be sure to use eaves plates (starter strips) (shouldering).
dedicated to each type of roofing tile. Sheathing

Eaves plate 212


20 Eaves edge flashing

20
Leave a little space. Enlarged

●In case of hipped roofs, mark a line along with the


center of the corner ridge, and then cut and install
eaves plates in line with the center of the corner Mark a ling along
ridge. with the center of
the corner ridge.

<2-1> Procedure for installing roofing Marking line

tiles in the first row


●After installing the eaves plates, continue to install 212
roofing tiles side by side while leaving a little space
20
between them. Eaves edge
●Install roofing tiles while aligning the alignment mark Eaves plate flashing
on the tile with that on the eaves plate.
●Fix each roofing tile with four roofing nails.
●Cut the permanent plate of verge flashing by approx.
100 mm in width (shouldering).

●I n case of large properties that use Cut by approx. 100 mm (shouldering).
Pearlite mortar substrates or are 15 m or Alignment mark
more in the ridge length, install roofing Eaves plate
tiles and eaves plates while leaving a
space of approx. 1.5 mm between the
butting portions. (For details, refer to First row
information on page 129.)
Eaves edge flashing
E xcessive butting may cause roofing
Leave a little space.
tiles to move around or deflect due to
the behavior of the substrate.

78
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 ×

8. Installing roofing tiles


<1-2> Procedure for installing eaves plates (starter strips)
(1) For GLASSA 600
Be sure to use S starter strips for eaves plates. Cut by approx. 100 mm
●P ut a marking line in the top end position of the (shouldering).
eaves edge (222 mm away from the eaves edge
Eaves plate
flashing). (S starter strip) 222
●Before laying roofing tiles, carry out roof allocation
with careful attention so that many of narrow tiles 20
will not be installed on the verge side.
●Be sure to protrude an eaves plate by 20 mm from
Enlarged 20
the eaves edge flashing.
●Continue to install eaves plates side by side while
leaving a little space between them. Eaves edge flashing

Roofing Tile Installation Instruction



Excessive butting will cause roofing tiles to
moves around or deflect due to the behavior
of the substrate. Mark a ling along with the center of
●Fix each eaves plate with two roofing nails following the corner ridge.
the marking line.
Marking line
NEVER attempt to drive nails in the permanent plate
of the flashing.
●Cut the eaves plate for the permanent plate of verge 222
flashing by approx. 100 mm in width (shouldering).
●In case of hipped roofs, mark a line along with the 20
Eaves edge flashing
center of the corner ridge, and then cut and install Eaves plate (S starter strip)
eaves plates in line with the center of the corner
ridge.

<2-2> Procedure for installing roofing tiles in the first row


●For installation in the first row, position GLASSA 600
roofing tile 202 mm (equivalent to 1/3 of its length)
away from the left end of the eaves plate, and then
continually install the tiles side by side while leaving ngth) Alignment mark
of the le
a little space between them. hift by 1/3
Eaves plate (S starter strip)
●Fix each roofing tile plate with two roofing nails. 202 (S
Use the spare hole if the nails cannot be driven
in normal holes for installation due to cutting. First row
Prioritize the use of the normal hole on each
end.
●Cut the permanent plate of verge flashing by approx.
100 mm in width (shouldering).

The conventional Eaves edge flashing


COLORBEST tiles Holes for
should be installed in 1/3 installation Spare hole
a staggered 1/3
arrangement (shifting
by 1/2 of its length),
Cut by approx. 100 mm Alignment mark
but GLASSA 600
(shouldering).
should be installed by Eaves plate (S starter strip)
shifting by 1/3 of its GLASSA 600
length.

●I n case of large properties that use First row


Pearlite mortar substrates or are 15 m or
more in the ridge length, install roofing
tiles and eaves plates while leaving a
space of approx. 1.5 mm between the
butting portions. (For details, refer to
information on page 129.)
E xcessive butting may cause roofing
tiles to move around or deflect due to
the behavior of the substrate.

79
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
× × × × × 〇

8. Installing roofing tiles


<3> Procedure for installing roofing tiles (COLONIAL, SAVORY, SUPERIOR II, RAYCIOUS, and PROUD) in the second row and after
●Install the roofing tiles by aligning the alignment mark on each side of ■Installation of COLONIAL
the tile (see Part A) with that on the top-end center of a tile underneath.

Cut by approx. 100 mm (shouldering).

Alignment mark
Alignment mark
Making line
Enlarged Part A
Part A
Third row 212
●Fix each roofing tile with four roofing nails. Second row
Roofing Tile Installation Instruction

First row 20
Verge flashing 182 Eaves edge
Eaves plate flashing

(The diagram above is for COLONOAL.)

■Installation of SUPERIOR II and SAVORY ■Installation of RAYCIUOS and PROUD

Cut by approx. 100 mm (shouldering).


Cut by approx. 100 mm (shouldering).
Alignment mark
Alignment mark
Alignment mark
Alignment mark
Marking line Marking line
Third row Part A
455 or less Second row Part A Third row 212
First row 212 Second row
First row 20
20 Eaves edge
Nail used to fix Eaves edge Verge flashing
flashing Eaves plate flashing
roof accessories Eaves plate

Verge flashing
(The diagram above is for SAVORY.) (The diagram above is for PROUD GLASSA.)

<4> Procedure for roofing tiles (GLASSA 600) in the second row and after
●Install the roofing tiles by aligning the alignment mark on each side of ■Installation of GLASSA 600
the tile (see Part A) with that on the top-end center of a tile underneath.

Cut by approx. 100 mm (shouldering).

Alignment mark Marking line

Enlarged Part A
Third row
Second row Part A
First row 222
●Fix each roofing tile with two roofing nails.
20
Verge
flashing Eaves plate

Eaves edge flashing

(The diagram above is for GLASSA 600.)

80
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

9. Installing roofing tiles to verge

●To install roofing tiles to the verge, put them in the verge
flashing. *2 Ranking beam
18 (or 21) × 45
70
*1: Sealant Nail used to fix 90
In areas with much dust and fallen leaves, fill a roof accessories *1 Sealant
gap between the verge flashing and the roofing tile

60 (70)
with sealant.

*2: When TOUGHMOCK or preservative-treated wood 15


Verge flashing
is used as a ranking beam, the built-up roofing
needs not to be raised by additionally laying it. Rafter

Roofing Tile Installation Instruction


The figure in the parentheses represents the size for PROUD, RAYCIOUS, SUPERIOR II,
and GLASSA 600.

●Cut the roofing tile to be laid over the permanent verge


plate by approx. 100 mm in width (shouldering).

Cut by approx. 100 mm (shouldering).


Alignment mark
Alignment mark
Marking line

Third row
Second row
First row 20
Eaves edge
Verge flashing
Eaves plate flashing

●If a narrow roofing tile comes to the verge, use roofing


nails and adhesive in combination to fix this tile. However,
if the nails cannot be driven, securely fix the tile only with
adhesive.

●Do not drive any nail in the permanent plate


of the verge flashing.

Doing so will result in roof leaks.


Verge flashing

WARNING Narrow roofing tile


(Do not drive any
nails in the verge
flashing.)
Eaves edge
flashing
Adhesive (used to bond this roofing tile
and a tile underneath)

81
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 × 〇 × 〇

10. Installing roofing tiles to flat ridge


<1> Installing roofing tiles
(1) Installing slitless roofing tiles
●Completely install roofing tiles up to the center of the
Cut the top end of Roofing tile (cut end)
ridge.
a roofing tile that goes
●Cut the top end of a roofing tile that goes beyond the beyond the center of
center of the ridge in line with the center of the ridge. the ridge in line with
●If there is a gap between the roofing tile with the top end the center of the ridge.
cut and the tile located underneath, lay the cut ends of
roofing tiles in line with the center of the ridge to fill the
gaps between them.
L aying small cut ends of roofing tiles may cause
the roofing tile to crack and eventually fall from
the roof. Be sure to lay the cut ends of roofing
Roofing Tile Installation Instruction

tiles without any gaps between them.


Verge flashing

Roofing tile

●Install roofing tiles in the uppermost row so that their


working length (in the roof slope direction) will come to
150 to 232 mm. Alignment mark
* Adjust the length of roofing tiles to be installed in a
few rows underneath the uppermost row to the
given working length (182 mm or less), as
appropriate, and then fit these roofing tiles. Adjust the length of roofing tiles to be laid in the uppermost
row to 150 to 232 mm (the position of the alignment mark).

Working length in the uppermost row


Center of ridge (in the roof slope direction):
150 to 232 mm

●Make a hole (of approx. 4 mm in diameter) in three or


more places per tile which are 50 mm away from the top
end of each roofing tile (in two or more places in case of Roofing tile
GLASSA 600) to fix it. (with the top end cut) 50

Roofing tile

Verge flashing

82
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
× × 〇 × 〇 ×

10. Installing roofing tiles to flat ridge


<1> Installing roofing tiles * Unless otherwise noted, all diagrams shown below represent those for the installation of SUPERIOR II roofing tiles.
(2) Installing slit roofing tiles
●Completely install roofing tiles up to the center of the
ridge.
Roofing tile (cut end)
●Cut the top end of a roofing tile that goes beyond the
Cut the top end of a roofing tile
center of the ridge in line with the center of the ridge. that goes beyond the center of
●If there is a gap between the roofing tile with the top end the ridge in line with
cut and the tile located underneath, lay the cut ends of the center of the ridge.
roofing tiles in line with the center of the ridge to fill the
gaps between them.
L aying small cut ends of roofing tiles may cause
the roofing tile to crack and eventually fall from
the roof. Be sure to lay the cut ends of roofing

Roofing Tile Installation Instruction


tiles without any gaps between them. Verge flashing

Roofing tile

●If the top end of roofing tile needs to be cut near the
ridge, it should be cut “between a place 50 mm away
from the alignment mark and the top end of the roofing Center of ridge
tile.”
●Adjust the length of roofing tiles to be installed in
a few rows underneath the uppermost row to the
given working length (182 mm or less), as
appropriate, and then fit these roofing tiles.

For SUPERIOR II (GLASSA) For PROUD GLASSA


Cutting position Cutting position
50

50

●Use eaves plates (starter strips) in the uppermost row of


the eaves plate as adjusting roofing tiles to fit the For SUPERIOR II GRANDE GLASSA/
roofing tiles. SUPERIOR II GLASSA
If the roofing nails are short, use roofing nails 45
(KL45CA).
Use an eaves plate (F starter strip).

For PROUD GLASSA

Use an eaves plate (N starter strip)*.

* To install PROUD NATURAL GLASSA,


use eaves plates (D starter strips).

83
7. Roofing Tile Installation Instruction
10. Installing roofing tiles to flat ridge
<2> Mounting copings
●Copings are required to mount ridge cover and ridge
course, and should measure 18 by 90 mm.
●D rill a prepared hole through the ridge coping and
Nail used to fix Nail used to fix copings
roofing tile, respectively, and then be sure to fix the
roof accessories Ridge cover
copings to the rafters with the nails used to fix the 104 Built-up roofing*2
copings at spaces of 500 mm or less. 30
Coping, 18×90
T o fix the copings only to sheathing, fix them with Sealant*1

19
screws used to fix copings at spaces of 500 mm or less.
●Apply sealant to the edges of the copings.
*1: Sealant
 o sealant is required when TOUGHMOCK is used in
N
place of copings.
Roofing Tile Installation Instruction

*2: Built-up roofing


 hen wood not treated with preservative is used in
W Rafter
Ridge beam
place of copings, lay the built-up roofing (of approx. 250 Securely drive
Roofing tile the nail so that it
to 300 mm in width) on the wood. Built-up roofing will go in the rafter.
(This is not required when TOUGHMOCK or preservative- Sheathing
treated wood is used in place of copings.)

<3> Mounting of ridge cover


●Fix the ridge cover to the copings on both sides with the
nails used to fix roof accessories at spaces of 455 mm
or less.
In case of a steeply-pitched roof, use a ridge cover s
les Nail used to fix
dedicated to such roof (Part No.: KLZM3**).
5 or
45 roof accessories
Coping, 18×90 Ridge cover

Built-up roofing*2 Roofing tile

Sealant*1

Verge flashing

●Overlap the joints of the ridge covers by 50 mm or more,


Ridge cover
and then apply sealant to the overlapped portion.
●Fit the ridge course by folding it to dig the folded portion Coping, 18×90
into the verge flashing.
Sealant

Ridge course

50 Built-up roofing*2

Sealant

Fold the bottom


end to dig the
folded portion into Roofing tile
the verge flashing. Verge flashing

84
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

11. Installing corner ridge


<1> Structure of ridge cover
●Install a ridge cover to the corner ridge following the
same procedure as that for installing it to the flat ridge, Nail used to fix copings
Nail used to fix
Ridge cover
but do not apply sealant to the edges of the copings. roof accessories 104 Built-up roofing*1
30
Coping, 18×90
*1: Built-up roofing
W hen wood not treated with preservative is used in

19
place of copings, lay the built-up roofing (of approx. 250
to 300 mm in width) on the wood.
(This is not required when TOUGHMOCK or preservative-
treated wood is used in place of copings.)
Ridge beam
Roofing tile

Roofing Tile Installation Instruction


Built-up roofing Rafter
Sheathing

●Mark a line along with the center of the corner ridge in


order to install the corner ridge. Center of corner ridge
●Install roofing tiles in line with the center of the corner
ridge.
●I n s t a l l n a r r ow r o o f i n g t i l e s u s i n g a d h e s i v e i n
combination with nails.
●Diagonally cut the corner of a roofing tile in the second row Cut (Corner cut)
and after by 140 to 150 mm (corner cut) to prevent the
penetration of rainwater in the center of the corner ridge.
Adhesive
If the narrow roofing tile bottom end opens, put a spacer
such as the cut end of the roofing tile as shown in the
diagram below. Position of coping
Position of nail that
fixes the coping Cut (Corner cut)
by approx. 140 to 150

Spacer
Position of the nail that fixes the coping:
Coping, 18×90 Roughly in the middle of working length of
the roofing tile

If the bottom end opens:

●D rill a prepared hole through the ridge coping and


roofing tile, respectively, and then fix the copings to the
ridge beam with the nails used to fix the copings.
●Fix the copings to the roofing tiles in approx. every two
rows by driving a nail roughly in the middle of working
length of the roofing tile, respectively.
T o fix the copings only to sheathing, fix them with
screws used to fix copings.
  o not apply sealant to the edges of the copings in the
D
corner ridge.
●Process the end of the ridge cover so that the tip of the
corner ridge will lie over the reverse side of the roofing
tile.
●Overlap the joints of the ridge covers by 50 mm or more,
and then apply sealant to the overlapped portion. Built-up roofing*1
●Fix the ridge cover to the copings on both sides with the 455 or less
nails used to fix roof accessories at spaces of 455 mm
Tip of corner ridge
or less. (Bend the tip or the corner ridge on site.) Nail used to fix roof accessories

85
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 × 〇 〇 〇 〇

11. Installing corner ridge


<2> Structure of corner part for corner ridge
●To fit the corner ridge using a corner part, make the right Do not install SAVORY using a corner part for the corner ridge.
and left ends of roofing tiles of the corner ridge flush.
In case of an extreme difference in the pitch of roof
between the right and left sides or a polygonal roof, the Nail used to fix 70 Corner part
the corner part
corner ridge cannot be fit by using a corner part.
●Install roofing tiles on Roof Surfaces 1 and 2, and then
install roofing tiles on Roof Surfaces 3 and 4 according to
the working length of roofing on Roof Surfaces 1 and 2.
* In case of a roof with different pitches, install roofing tiles
on the low-pitched surface in 182-mm working length
and install roofing tiles on the steeply-pitched surface
following the working length of the roofing tiles on the
Roofing Tile Installation Instruction

low-pitched surface.
Roofing tile
Built-up roofing Rafter
Sheathing

Roof Surface 4

Roof Surface 1 Roof Surface 2

Roof Surface 3
Black ink or leveling line

When using a corner part, do not cut the corner.

●Cut the roofing tiles in line with the center of the corner
ridge.
●Fix narrow roofing tiles using roofing nails and adhesive If the bottom end opens,
in combination. put a spacer.
●Drill a prepared hole in a place 80 mm away from the
bottom end of roofing tile and 40 mm away from the
center of the corner ridge to install it.
If a narrow roofing tile bottom end opens, put a spacer
such as the cut end of the roofing tile.
T o drill the prepared hole, drill the hole only in the When using a corner part for
roofing tile located on each side of the corner ridge. the corner ridge,
(Do not drill the prepared hole through sheathing.) do not cut the corner.
●Carry out marking for 70-mm single-side width of the
corner part for the corner ridge on one side of the center
of the corner ridge to prevent the corner part from
bending.
●Hang the corner part on the end of roofing tile and eaves
plate in the first row, and put it under the roofing tile in
the second low. 50
70
●Use two nails for corner part to securely fix it to the
corner ridge through the hole for nail in the roofing tile in
the second row. Marking line
*1: Sealant 40
In high-wind regions and areas, apply sealant to a place Sealant*1
80
approx. 50 mm away from the center of the corner ridge.
Nail used to fix the corner part
(Two nails)

Corner part
Eaves edge
flashing

86
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600

7. Roofing Tile Installation Instruction 〈1〉


〈2〉



×







12. Installing three-pronged ridge member


<1> Structure of ridge cover
●Process and mount one ridge cover (1) for the corner ridge.
●Mount the other ridge cover (2), and then apply sealant to the overlapped portion.
●Fit the ridge cover assembly by applying sealant to the joint with the ridge cover of the flat ridge and mounting ridge cover (3).
*1: Sealant
No sealant is required when TOUGHMOCK is used in place of copings.
*2: Built-up roofing
When wood not treated with preservative is used in place of copings, lay the built-up roofing (of approx. 250 to 300 mm in width) on the wood.
(This is not required when TOUGHMOCK is used or preservative-treated wood in place of copings.)

Roofing Tile Installation Instruction


Sealant*1
Ridge cover (2)
Roofing tile
Flow Flow
Sealant
Ridge cover (3)
Apply sealant to Sealant*1
the bottom of the Sealant Ridge cover (3)
overlapped portion. Roofing tile
Flow
Ridge Flow
cover (2) Coping, 18×90

Built-up roofing*2 Flow Flow


Ridge cover (1) Roofing tile

Roofing tile

Ridge cover (1)

<2> Structure of corner part for corner ridge


●Process a ridge cover to fabricate an end cap, and then mount the end cap to the three-pronged ridge member to fit the corner ridge.
●Apply sealant to the overlapped portion of the end cap and the ridge cover.
Do not install SAVORY using a corner part for the corner ridge.

Process the ridge cover on site.

Corner part Roofing tile

Sealant Coping, 18×90


Coping, 18×90 Built-up roofing*2
Built-up roofing*2
Ridge cover

Corner part Roofing tile

Sealant*1

Roofing tile Corner part Roofing tile

Sealant*1
Corner part

87
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 × 〇 × 〇

13. Installing roofing tiles to wall joints


<1> Installing roofing tiles in the ridge direction
(1) Installing slitless roofing tiles
Built-up roofing:
● Raise the built-up roofing on the roof surface by approx.
Raise by 50 mm or more from the top end of the flashing.
200 mm along the wall surface. (Raise the roofing itself by approx. 200 mm.)
●L ay the cut ends of roofing tiles without any gaps
between them to prevent the roofing tile with the top
end cut from leaving any opening.
Flashing

70 or more
Laying small cut ends of roofing tiles may cause the
100
roofing tile to crack and eventually fall from the roof. Be
30
sure to lay the cut ends of roofing tiles without any gaps

10 ~15
between them. Roofing tile
Built-up roofing
Roofing Tile Installation Instruction

18
Sheathing
Coping, 18×90

Sealant*1

Rafter

●Install roofing tiles in the uppermost row so that their


working length (in the roof slope direction) will come to
150 to 232 mm.
●M ake a hole for nail in three or more places 50 mm
away from the top end of each roofing tile to fix the tile.
●C opings are required to mount flashing and should
measure 18 by 90 mm.
●Drill a prepared hole through the ridge coping and
roofing tile, respectively, and then be sure to fix the
Roofing tile (with the top end cut)
copings to the rafters with the nails used to fix the
copings at spaces of 500 mm or less.
To fix the copings only to sheathing, fix them with
50 Cut end of roofing tile
screws used to fix copings at spaces of 500 mm or less.
150 ~ 232

Roofing tile

●Apply sealant to the edges of the copings.


*1: Sealant
N o sealant is required when TOUGHMOCK is used in
place of copings.
●Fix the flashing to the copings from the side with the
nails used to fix roof accessories at spaces of 455 mm
or less.
●Overlap the joints of the flashing by 50 mm or more, and Flashing
then seal the overlapped portion.

Nail used to fix


less roof accessories
455 or
Coping, 18×90

Sealant*1
Roofing tile

88
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
× × 〇 × 〇 ×

13. Installing roofing tiles to wall joints


<1> Installing roofing tiles in the ridge direction * Unless otherwise noted, all diagrams shown below represent those for the installation of SUPERIOR II roofing tiles.
(2) Installing slit roofing tiles
Built-up roofing:
● R aise the built-up roofing on the roof surface by Raise by 50 mm or more from the top end of the flashing.
approx. 200 mm along the wall surface. (Raise the roofing itself by approx. 200 mm.)
●L ay the cut ends of roofing tiles without any gaps
between them to prevent the roofing tile with the top Coping, 18×90

70 or more
end cut from leaving any opening.
Laying small cut ends of roofing tiles may cause the 100 Flashing
roofing tile to crack and eventually fall from the roof. Be

10 ~ 15
30
sure to lay the cut ends of roofing tiles without any
gaps between them.

Roofing tile

Roofing Tile Installation Instruction


18
Built-up roofing
Sheathing

Sealant*1

●If the top end of roofing tile needs to be cut near the
ridge, it should be cut “between a place 50 mm away Cut end of roofing tile
Cut the top end of the roofing
from the alignment mark and the top end of the roofing
tile along with the wall.
tile.”
●Adjust the length of roofing tiles to be installed in a few
rows underneath the uppermost row to the given
working length (182 mm or less), as appropriate, and
then fit these roofing tiles.
●Use eaves plates (starter strips) in the uppermost row
against the wall as adjusting roofing tiles.
Roofing tile
I f the roofing nails are short, use roofing nails 45
(KL45CA).
●M ake a hole for nail in three or more places 50 mm
away from the top end of each roofing tile to fix the tile. For SUPERIOR II For PROUD
Cutting position Cutting position
50

50

Alignment Alignment
mark mark

●C opings are required to mount flashing and should


measure 18 by 90 mm. For SUPERIOR II
●D rill a prepared hole through the ridge coping and Coping, 18×90 Flashing
roofing tile, respectively, and then be sure to fix the
Use an eaves plate (F starter strip).
copings to the rafters with the nails used to fix the
copings at spaces of 500 mm or less.
To fix the copings only to sheathing, fix them with Sealant*1
screws used to fix copings at spaces of 500 mm or
less.
●Apply sealant to the edges of the copings.
Roofing tile
*1: Sealant
N o sealant is required when TOUGHMOCK is used in
place of copings. For PROUD GLASSA
●Fix the flashing to the copings from the side with the
nails used to fix roof accessories at spaces of 455 mm Use an eaves plate (N starter strip)*.
or less.
●Overlap the joints of the flashing by 50 mm or more, and
then seal the overlapped portion.
* To install PROUD NATURAL GLASSA,
use eaves plates (D starter strips).

89
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<2> Joint of verge and wall
●To join the verge flashing, raise the permanent plate and
top plate against the wall.
*1: Sealant
N o sealant is required when TOUGHMOCK is used in
place of copings.

Nail used to
fix the coping

Coping, 18×90
Sealant*1
Roofing Tile Installation Instruction

Raise the verge flashing


against the wall Roofing tile
(by approx. 50 mm).

●Raise and hem (fold in a shape like a box) the end of the
flashing.
●Fit the hemmed bottom end of the flashing by digging
the seam into the verge flashing. Raise built-up roofing.

Flashing
Hem the raised
end of flashing.

Fold and dig


the bottom end into
the flashing.
Verge flashing Roofing tile

90
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<3> Installing roofing tiles in the roof slope direction
●Raise the built-up roofing on the roof surface by approx.
200 mm along the wall surface.
●M ount a ledger strip along the wall surface. Fix the Built-up roofing
ledger strip with nails used to fix ledger strips at spaces Raise by 50 mm or more from
Permanent flashing
of 500 mm or less. the top surface of flashing.
(Raise the flashing itself Flashing
●Mount permanent flashings to the ledger strip.
by approx. 200 mm.) Coping, 18×90
●F ix the riser parts of the permanent flashings to the

70 or more
ledger strip with nails used to fix roof accessories at 100 Roofing tile
30
spaces of 455 mm or less. Built-up roofing

10 ~ 15
20 (24) 70
●Mount the permanent flashings by overlapping them by Sheathing

18
50 mm or more.

Roofing Tile Installation Instruction


10
50 79

Sealant*1
Ledger strip, 18 (21) × 45
The figure in the parentheses represents the size for PROUD, RAYCIOUS, SUPERIOR II,
and GLASSA 600.

●Install roofing tiles leaving approx. 10 mm of space to


the permanent flashing.
●C ut a roofing tile to be mounted to the permanent
flashing by approx. 100 mm in width (shouldering). Adhesive (used to bond this roofing
Cut this part tile and the tile underneath)
by approx. 100 mm Built-up roofing
in width (shouldering). Nail used to fix roof
accessories
Permanent flashing
Roofing tile

Ledger strip

●F ix a coping to the stepped part of the permanent


flashing with a nail used to fix copings at spaces of 500
mm or less.
●Apply sealant to the edges of the copings.
*1: Sealant
Flashing Coping, 18×90
N o sealant is required when TOUGHMOCK is used in
place of copings.
●Fix the flashing to the copings from the side with the Roofing tile
nails used to fix roof accessories at spaces of 455 mm
or less. Nail used to fix
●Overlap the joints of the flashing by 50 mm or more, and roof accessories
then apply sealant to the overlapped portion.
Sealant*1

Permanent flashing Ledger strip

91
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<4> Joint of eaves edge and wall
(1) Using an accessory to tack an eaves edge
Ledger strip
on the wall
●Lay permanent built-up roofing on the wall surface.
●D iagonally fold the bottom end of the eaves edge
flashing in a position approx. 50 mm away from the wall Approx. 50
surface. Hem and seam this part.
*1: Diagonal folding Approx. 100
Lay permanent built-up roofing.
D iagonally fold the bottom end of the eaves edge
flashing to prevent water coming through the flashing
from flowing into the wall surface. Approx. 50
●Cut the top surface of the eaves edge flashing, and then *1 Diagonal folding External wall surface
Roofing Tile Installation Instruction

hem and seam in the position approx. 50 mm away from


Do not tack the bottom end.
the wall surface.
●Mount a ledger strip by retracting it by approx. 100 mm
from the eaves edge flashing.

●Protrude the accessory to tack the eaves edge on the


wall by 40 mm from the eaves edge flashing, and then
fix it with cleats.
Ledger strip
*2: To fix the accessory to tack the eaves edge on Fix with cleats
the wall, pay careful attention not to cause the Fix with cleats
drainage slope to tilt toward the wall surface.

Accessory to Drainage
tack on the wall slope
40

Eaves edge Accessory to tack on the wall *2


flashing

●Mount the permanent flashing by protruding it by 20


mm from the eaves edge flashing. Coping, 18×90
●The end of the permanent flashing needs not to be Roofing tile
processed. Permanent flashing

Sealant

●Fold the end of the flashing to the extent that the roofing
tile is covered, and then fit the flashing.

Roofing tile

Flashing

Fold the cut end of the flashing.

92
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<4> Joint of eaves edge and wall
(2) Raising the cut end of flashing
●Lay permanent built-up roofing on the wall surface.
●D iagonally fold the bottom end of the eaves edge
flashing in a position approx. 50 mm away from the wall Built-up roofing
surface. Raise here.
* Diagonal folding Ledger
strip
D iagonally fold the bottom end of the eaves edge
flashing to prevent water coming through the flashing
from flowing into the wall surface.
●Cut the top surface of the eaves edge flashing by approx.
50 mm, and then raise it at right angles along the ledger
strip.

Roofing Tile Installation Instruction


●Mount the ledger strip against the wall aligning with the Lay permanent
end of the eaves edge flashing. built-up roofing.
Eaves edge Approx. 50
flashing External wall surface
Do not tack the bottom end.
* Diagonal folding

●Mount the permanent flashing by protruding it by 20 mm


from the eaves edge flashing.
●Mount the stepped part of the permanent flashing by
raising and hemming (folding in a shape like a box) the
eaves edge. Coping,
18×90
Roofing tile
20

Sealant
Raise and hem.

Permanent flashing
Lay permanent built-up roofing.

●Mount the flashing by raising and hemming (folding in a


shape like a box) the end of the flashing.
●Fit the flashing by raising the end of the flashing by
approx. 30 mm, and then slightly inclining it outward to
prevent rainwater from being stored in the raised end.

Roofing tile

Raise
and hem.
Flashing
30

Incline this part outward

93
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<5> External corner
(1) Finishing flashings in external corner
●Mount a ledger strip by retracting it by approx. 200 mm
from the external corner.

Ledger strip

Approx.
200
Roofing Tile Installation Instruction

Coping, 18×90

Roofing tile

●Extend the permanent flashing up to the position of the


flashing in the ridge direction (approx. 130 to 150 mm
from the wall surface) and let the end of the permanent
flashing come out from underneath the roofing tile.
Permanent flashing
●G radually batter and flatten the stepped part of the
permanent flashing up to the permanent plate.
●Install a roofing tile on the permanent flashing.
* Sealant Batter and flatten
N o sealant is required when TOUGHMOCK is used in
place of copings.

13
0~
15 Sealant*
0
Let the end of
the permanent
flashing come Coping, 18×90
out from here.
Roofing tile

●Level the copings located on each side of the external


corner.
●Fit the flashing in the roof slope direction by diagonally
processing (finishing) it, and then applying sealant to the
overlapped portion.

Flashing
Flashing

Seal underneath
the overlapped portion.
Roofing tile

94
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<5> External corner
(2) Raising flashings in external corner
●Mount a ledger strip by retracting it by approx. 200 mm
Ledger strip
from the external corner.

Coping

Roofing Tile Installation Instruction


●Extend the permanent flashing up to the position of the
flashing in the ridge direction (approx. 130 to 150 mm
from the wall surface) and let the end of the permanent Permanent
flashing come out from underneath the roofing tile. flashing
●Install a roofing tile on the permanent flashing.
* Sealant Sealant*
N o sealant is required when TOUGHMOCK is used in
place of copings.

130 ~ 150

●Mount the flashing in the ridge direction by raising and


hemming (folding in a shape like a box) the corner part
of the flashing.
Permanent Raise and hem. Flashing in
plate the ridge direction

●Install the flashing in the roof slope direction by digging


the corner part into the flashing located in the ridge Sealant
Flashing in the roof
direction. slope direction Fold and dig into the flashing.

Flashing in
the ridge direction

Block the header.

95
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<6> Internal corner
●To install a permanent flashing to the wall column, raise
and hem the permanent plate and raise the top surface Raise and hem Fold the permanent flashing.
of the permanent flashing. the permanent flashing
(by approx. 50 mm).

Permanent
flashing
Roofing Tile Installation Instruction

Roofing tile

●To install flashings to the wall column, raise and hem


(fold in a shape like a box) the flashings. Raise and hem the flashing.
●Apply sealant to the portion overlapping the flashing Sealant
located in the ridge direction.

Flashing

Coping, 18×90

Roofing tile

●F it the flashing in the ridge direction by diagonally


processing (finishing) it.
●Fix the overlapped portion with the nail used to fix roof Diagonally process
accessories in order to prevent the por tion from (finish) the flashing.
separating.

Nail used to fix


roof accessories
Flashing
Flashing

Roofing tile

96
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

13. Installing roofing tiles to wall joints


<7> Joint of flat ridge and wall
●Install one permanent flashing in the center of the ridge
by overlaying it on the other permanent flashing. Permanent flashing

Overlay on the other.

Center of ridge

Roofing Tile Installation Instruction


●Mount copings up to the center of the ridge, and then
apply sealant to the edges of the copings.
*1: Sealant
N o sealant is required when TOUGHMOCK is used in
place of copings. Sealant
Flashing

*1 Sealant

Coping

Roofing tile

●Install one flashing by overlaying it on the other flashing,


and then overlay this flashing on the next flashing. Sealant
●Apply sealant to the overlapped portion of the flashings Ridge cover Cut off
and ridge cover. *2

Sealant
Built-up roofing Flashing
(If copings are not
treated with preservative)
●Be sure to apply sealant to portions
in which pinholes are formed (the Coping
corner shown by “*2”). Sealant
CAUTION
Not doing so may result in roof leaks. Roofing tile

●Fit the flashings by overlaying the ridge cover on them.

●W ork sheet metal with careful Sealant


attention not to form pinholes in the Ridge cover
raised part of the ridge cover and
CAUTION flashings.

Not doing so may result in roof leaks.

Roofing tile

97
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD GLASSA 600

7. Roofing Tile Installation Instruction Fitting of ridge cover


Fitting of corner part



×







13. Installing roofing tiles to wall joints


<8> Joint of corner ridge and wall
(1) F itting a corner ridge with a ridge cover
●Apply sealant to the overlapped portion of the flashing
and ridge cover.
Flashing
Roofing Tile Installation Instruction

Sealant
Ridge cover

●Apply sealant to the overlapped portion of the flashing


and ridge cover.
* To fit the corner ridge using a corner part of the Flashing
corner ridge, increase the width of the flashing
located in the ridge direction to adjust it to the
width of the flashing located in the roof slope
direction. (Local procurement)

●Work sheet metal with careful attention


not to form pinholes in the raised part of Sealant
the ridge cover and flashings.
CAUTION ●Be sure to apply sealant to portions in
which pinholes are formed.

Not doing so may result in roof leaks.


Ridge cover

(2) Fitting a corner ridge with a corner part of


the corner ridge
●Fit the corner ridge by mounting a coping against the
wall and overlaying the flashing on the coping. Flashing
Do not conduct an installation with a corner part of the
corner ridge when using SAVORY.

Corner part

98
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

14. Installing valley

●Fix the each end of a valley plate using cleats at spaces


of 455 mm or less. Roofing tile
Built-up roofing
●D o not make any holes for nails in Sheathing
valley plates. Appr 0
ox. 6 Full width ox. 6
0 Appr
CAUTION
Doing so may result in roof leaks. Nail used to fix Valley plate
roof accessories
*1: T he hemming and seaming height of valley plates
Cleat
should be 2 to 3 mm. If the height exceeds 3 mm,
flatten the hemmed and seamed portion to the height Rafter
Permanent built-up roofing
of 2 to 3 mm.
(of 1000 mm in width)

Roofing Tile Installation Instruction


2 to 3 mm Valley rafter
*1

●Extend the end of the valley plate by 30 mm from the Marking line
roofing tile, and bend down the valley plate from the end Valley plate
of the roofing tile.
●Overlap valley plates by 100 mm or more at a joint and
apply double coatings of sealant to the overlapped
portion.
●At wall columns, hem and raise the valley plate by 50 Cleat Cut by approx. 70 mm
mm or more. (shouldering).
●To install roofing tiles on the valley, overlap them on the
valley plate by 60 mm each on the right and left sides.
*2: Carry out marking in a position 60 mm away from the *2 A
ppro
end of the valley plate, and then install roofing tiles x. 6 455 or less
0
straight. * Approx. 60
●Fix narrow roofing tiles using roofing nails and adhesive
in combination.
●If a roofing tile to be overlapped on the valley plate
inclines adversely, cut it by approx. 70 mm in width 30
(shouldering). Sheathing
Eaves edge flashing

●Relationship between the length of


valley and the full width of valley plate
Appro Full width
(1) General housing x. 60 x. 60
Length of valley Full width of valley plate Effective width
Appro
●Make setting of the width of
Less than 5 m Approx. 280 mm Valley plate
valley plate according to the
length of the valley. Not less than 5 m Approx. 420 mm

(2) Buildings not falling under the category of general housing


Valley rafter
●Make setting of the width of valley plate according to the “Relationship between
the length of valley and the full width of valley plate” shown below.

Relationship between the length of valley and the full width of valley plate
(cm)
Rainfall: 25 mm/10 min.
50

4/10 4.5/10
Full width of valley plate

40 3.5/10 5/10
3/10 6/10
34 7/10 or more
30

20

0
0 4 5 6 7 8 9 10 11 12 13 14 15 16 (m)
Example: When the slope is 3/10 and the length of valley is 6 m, the full width of valley plate should be 34 cm or more. Length of valley

99
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

15. Installing overhang

<Processing of verge flashing>


Verge flashing
* Sealant <D
ow
nst
rea
ms
ide
>

<U Fold
pst
rea
ms
ide Cut and fold
> Fold

Batter
●In order to prevent rainwater from penetrating the verge and flatten
Roofing Tile Installation Instruction

Fold
through the cut-end surface, fold the top surface of the
verge flashing.
* Sealant
Apply sealant to portions on the reverse side in which
pinholes are formed.
●Mount a ranking beam to a position retracted from the
protrusion of the roofing tile and down by approx. 30 Eaves edge Hem and seam
flashing Sheathing
mm from the eaves edge flashing. 30
●Hem and seam the end of top surface of the eaves edge
flashing, and fold the downward-sloping portion at a
right angle right before the ranking beam.

Ranking beam

●Install the verge flashing by aligning its processed top Built-up roofing
surface with a position down by 20 mm from the eaves
edge flashing. 100 or more
●If the gutter is not enough to receive rainwater from the
roof surface, mount the Type-L permanent flashing (to be
locally procured).
Built-up roofing
Type-L permanent flashing 20
(to be locally procured)
Eaves edge
flashing

Verge flashing

●In order to align the roofing tiles in the overhang, adjust


the working length of roofing tiles to be installed below
the overhang to the given length (182 mm) or less to
install the roofing tiles. Roofing tile
Align.

Adjust the working length


(to the given length or less).
Eaves edge
flashing
Verge flashing

100
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

16. Installing dormer-related members


<1> Installing joint of flat ridge and valley
<Processing or ridge cover>

Ridge cover

Fold

Roofing Tile Installation Instruction


●Cut and fold the top surface of the ridge cover as shown
in the diagram on the right. Cut and fold

●Install a valley by raising the top end of one valley plate


and digging the standing seam into the raised portion of
the top end of the other valley plate.
●If no standing seam is formed due to a steep slope,
extend half of the valley plate to overlap it on the other Dig the standing seam
valley plate as shown in the diagram below. Valley plate into this part.
●Apply a permanent coating of sealant to the overlapped
portion.

●Be sure to apply sealant to portions in


which pinholes are formed.

CAUTION Not doing so may result in roof leaks. Permanent built-in


roofing Valley plate

Permanent coating
of sealant
Sealant

●Fit the joint by mounting the processed ridge cover. Roofing tile

Ridge cover

Roofing tile

101
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

16. Installing dormer-related members


<2> Joint of valley and wall

Built-up roofing Center of valley

Permanent flashing
(Batter and flatten
the top end.)

Notch of sheathing

Laying permanent built-up


roofing on the valley
Roofing Tile Installation Instruction

●N otch the sheathing for the portion in which the


Roofing tile
permanent flashing is raised.
Eaves edge flashing
●Install the permanent flashing by battering and flattening
its top end, and then making it fit to the roof slope.

●Install roofing tiles until they lie on the valley. Flashing


●Install the flashing by battering and flattening its top Center of valley Batter and flatten, and then
end, and then making it fit to the roof slope like the make it fit to the roof slope.

permanent flashing.

Built-up roofing

Roofing tile

Eaves edge
flashing

Flashing

●Fit the joint by mounting the valley plate from the above.
Valley plate

Built-up
Roofing tile roofing

Eaves edge
flashing

Flashing

102
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

17. Installing members around chimney and in the top right section
<1> Fitting members in the roof slope direction with flashing
(1) Installing members above the chimney Flashing
Snow guard flashing
(to be locally procured)

Raise and hem


(fold in a shape like a box) Rolled
hem
Cut, and batter
Permanent and flatten.
flashing Cut and
fold.
Fold.

Roofing Tile Installation Instruction


●Fold the permanent flashing, flashing, and snow guard
flashing (to be locally procured) as shown in the diagram
on the right.

●F abricate a plywood substrate for the snow guard


flashing.
●Lay built-up roofing on the substrate for the snow guard
flashing, and then be sure to raise the roofing against Plywood substrate support
the wall.
●Install roofing tiles up to the upper part of the wall, and
Plywood substrate
then mount the processed flashing.

Flashing

Roofing
Built-up roofing
tile
Permanent flashing

●Mount the snow guard flashing (to be locally procured),


and then install roofing tiles.
●Fit the roofing tiles by overlapping them by 60 mm or
more on the snow guard flashing.
●Apply sealant to the overlapped portion of the roofing Built-up roofing
tiles and snow guard flashing.
60 or more
Flashing
Sealant
●Do not get on roofing tiles located Snow guard flashing
around the snow guard flashing. (to be locally procured)

CAUTION Doing so may cause damage to or


Roofing tile
cracks in the roofing tiles.

(2) Installing members below the chimney


Built-up roofing

Flashing

Flashing

Roofing tile Permanent


flashing
* For details, refer to information on page 94.

103
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

17. Installing members around chimney and in the top right section
<2> Installing members in the roof slope direction with Type-L permanent flashing
(1) Installing members above the chimney
Snow guard flashing
(to be locally procured)

Type-L permanent flashing


(to be locally procured)
Rolled
hem
Roofing Tile Installation Instruction

●F old the Type-L permanent flashing (to be locally


procured) and snow guard flashing (to be locally
procured) as shown in the diagram on the right.

●F abricate a plywood substrate for the snow guard


flashing to be used above the chimney.
●Lay built-up roofing on the substrate for the snow guard Built-up
flashing, and then be sure to raise the roofing against roofing
the wall. Plywood substrate support
●Apply sealant to the overlapped portion of roofing tile
and the Type-L permanent flashing.
Type-L
permanent flashing

Plywood substrate

Built-up roofing
Type-L
permanent flashing Sealant

●Mount the snow guard flashing, and then install roofing


tiles around the flashing.
●I nstall roofing tiles on the snow guard flashing by
overlapping them by 60 mm or more. Built-up roofing
●Apply sealant to the overlapped portion of the roofing
tiles and snow guard flashing.
Roofing tile
60 or more

Sealant
●D o not get on roofing tiles located Snow guard flashing
(to be locally procured)
around the snow guard flashing.

CAUTION Roofing tile


Doing so may cause damage to or
cracks in the roofing tiles.

(2) Installing members below the chimney Roofing tile

Sealant Snow guard


flashing

Built-up roofing
Sealant
Type-L
permanent flashing

Flashing
●F it the flashing by raising and hemming it, and then Type-L
permanent
digging the rolled hem into the raised portion of the flashing Roofing tile Raise and hem.
Type-L permanent flashing.

104
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

18. Installing roof having different ridge angles

Verge flashing
Cut and fold.

Cut and fold.

Ridge cover

Roofing Tile Installation Instruction


Fold

●Fold the verge flashing, ridge cover, Type-L permanent


flashing (to be locally procured), and flashing as shown Flashing
in the diagram on the right.
Type-L permanent flashing
(to be locally procured)

Cut and fold.

●N otch the sheathing to which the Type-L permanent


flashing is mounted.
●Mount the Type-L permanent flashing to the substrate of
gable board located underneath the portion of the roof
having different ridge angles. (Mount the gable board to
the portion of the roof having different ridge angles after
the roof is completely installed.) Notch of sheathing
●Install roofing tiles up to the center of the ridge.

Ranking beam

Type-L permanent flashing

Permanent
flashing
Substrate of gable board

105
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

18. Installing roof having different ridge angles

●Mount the processed ridge cover by pushing it all the


way in the notch of sheathing.

Ridge cover

Ranking beam
Roofing Tile Installation Instruction

Roofing tile
Type-L permanent flashing

●Fit the verge flashing by aligning it with the ridge cover.


●A pply sealant to the overlapped portion of the verge
flashing and the ridge cover. Sealant
Ridge cover

Verge flashing

Roofing tile
Type-L permanent flashing

●Mount the flashing.


●Put the raised portion of the Type-L permanent flashing Substrate of gable board
on the raised portion of the mounted flashing. Verge flashing
* Sealant
No sealant is required when TOUGHMOCK is used in place
of copings. Ridge cover

Coping, 18×90

Ledger
Type-L permanent flashing strip
Flashing
Cut the Type-L Flashing
permanent flashing
and the flashing,
and then dig their raised Permanent
portions into Roofing tile flashing
the permanent flashing.
* Sealant

106
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

19. Installing shed ridge

●Roll in built-up roofing on the roof surface up to the


<Mounting the gable beforehand>
bottom end of a coping on the gable side.
Ridge cover used for steeply pitched roof
Built-up roofing*1
*1: Built-up roofing Coping, 18×90
Coping, 18×90
130 Nail used to fix roof accessories
 hen wood not treated with preservative is used in
W
30 Sealant*2
place of copings, lay the built-up roofing (of approx. 250
to 300 mm in width) on the wood. Roofing tile
Built-up roofing

19
130
(This is not required when TOUGHMOCK or preservative- Sheathing
treated wood is used in place of copings.)
*2: Sealant
 o sealant is required when TOUGHMOCK is used in
N

30
place of copings.

Roofing Tile Installation Instruction


Nail used to fix
roof accessories
Gable board Ridge beam Rafter
(to be mounted
beforehand)

<Mounting the gable afterward>


Ridge cover used for steeply pitched roof
Built-up roofing*1
Coping, 18×90
Coping, 18×90
130 Nail used to fix roof accessories
30 Sealant*2
Roofing tile
Built-up roofing
19
130

Sheathing
30

Nail used to fix


roof accessories
Ledger strip of Ridge beam Rafter
45 in width
Gable board
(to be mounted
afterward)

●Fit the ridge cover by folding and rolling it in the verge


flashing.
Coping, 18×90
Built-up roofing*1
Sealant
Ridge cover used for
steeply pitched roof

50
Sealant*2
Roll in

Verge flashing

Roofing tile

Gable board

107
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

20. Installing hip-and-gable ridge

Verge flashing Cut and fold

Cut and fold

Cut and fold

Cut and fold


Roofing Tile Installation Instruction

●Fold the verge flashing and ridge cover as shown in the Ridge cover
diagram on the right.

●Keep bottom end of the substrate of the gable board


approx. 50 mm away from the sheathing. Built-up roofing Substrate of gable board
●C ut the ridge cover into length that reaches a wall Ranking beam
column located at the back of the hip-and-gable roof.
Keep away from
the sheathing

Flashing

Ridge cover

Roofing tile

●Apply sealant to the portion of the ridge cover that the


verge flashing overlaps.
●Apply sealant to the roofing tile beside the cut end of the Ranking beam
ridge cover to prevent rainwater from entering through * Notch of sheathing
the said cut end.
* Notch of sheathing Sealant
Notch the portion of the sheathing with which the Roofing tile
processed ridge cover comes into contact.

Roofing tile

Ridge cover

●Fit the verge flashing by aligning it with the ridge cover.

Verge flashing

Roofing tile

Roofing tile

Ridge cover

108
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

21. Installing gambrel ridge


<1> Installing crest-bent ridge (Mansard ridge)

Double-sided waterproof Gambrel flashing


adhesive tape 55 20 (to be locally procured)
90 Sealant*
Built-up
roofing Eaves 30
plate

18×45

Roofing Tile Installation Instruction


Purlin Rafter

Roofing tile
Built-up roofing
Sheathing

●Lay built-up roofing on the gambrel portion so that it will


thoroughly protrude from the gambrel flashing (to be
locally procured).
Built-up roofing
* Sealant Protrude the built-up
Sheathing roofing from
No sealant is required when TOUGHMOCK is used in place Built-up roofing
of copings. the gambrel flashing.

●L ay built-up roofing on the gambrel


portion with careful attention not to Double-sided waterproof
break it Ranking
adhesive tape
beam,
CAUTION 18×45 455 or less
 roken built-up roofing may result in
B Gambrel flashing
roof leaks (to be locally procured)

●Put double-sided waterproof adhesive tape between the


Verge flashing Roofing tile
flashing and built-up roofing on the upstream side of the
gambrel portion.

Roofing tile

Verge flashing

Gambrel flashing
(to be locally procured)

Verge flashing Roofing tile

109
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

21. Installing gambrel ridge


<2> Installing trough-bent ridge

75
Gambrel flashing (to be locally procured)
50
On-site ad Coping, 18×90
justment Sealant
Double-sided 30
waterproof
adhesive tape
Built-up
Eaves plate roofing
Roofing Tile Installation Instruction

Roofing tile
Built-up roofing
Sheathing
Purlin

●Lay built-up roofing on the gambrel portion so that it will


thoroughly protrude from the gambrel flashing (to be
locally procured). Protrude the built-up roofing on
Built-up roofing on
the upstream side the downstream side from
●Lay built-up roofing on the gambrel the gambrel flashing.
portion with careful attention not to Double-sided waterproof
Ranking beam, 18×45
break it. adhesive tape

CAUTION
 roken built-up roofing may result in
B
roof leaks
●Put double-sided waterproof adhesive tape between the 455 or less
flashing and built-up roofing on the upstream side of the Gambrel flashing
gambrel portion. (to be locally procured)

Verge flashing
Roofing tile

Roofing tile

Verge flashing
Gambrel flashing
(to be locally procured)

Verge flashing Roofing tile

110
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

22. Installing sloping ridge (Joint of valley, flat ridge, and corner ridge)
<1> Installing corner ridge using ridge cover

Raise by
approx. 30 mm Ridge
cover
Ridge cover
Raise

Valley
plate

●Fold the ridge cover and valley plate as shown in the


diagram on the right.

Roofing Tile Installation Instruction


●Raise the valley plate by approx. 30 mm at the center of
Raise the end of the valley plate
the ridge.
●Install roofing tiles up to the sloping ridge.
Roofing tile

Valley plate

●Install roofing tiles up to the roof top, and then mount


copings.
Coping

Roofing tile Coping

Valley plate

●Mount the processed ridge cover on the flat ridge side,


and then apply sealant to the portion that the ridge cover Ridge cover
on the corner ridge side overlaps. Permanent coating of sealant
●Fit the ridge cover on the corner ridge side by aligning it
with the ridge cover on the flat ridge side.
Roofing tile Ridge cover

Fold and cover

Valley plate

111
7. Roofing Tile Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 × 〇 〇 〇 〇

22. Installing sloping ridge (Joint of valley, flat ridge, and corner ridge)
<2> Installing corner ridge using corner part for corner ridge
●Raise the valley plate about approx. 30 mm at the center
of the ridge.
●Install a roofing tile underneath the corner part of the
ridge up to the center of the valley (using nails and
adhesive in combination).
Raise the end of
the valley plate.
●After installing the roofing tiles, fold back the valley plate
onto the roofing tile on the side opposite to the valley. Extend up to
Do not install SAVORY using a corner part for the corner the center of the valley.
ridge. Adhesive Roofing tile
Roofing tile

Valley plate
Roofing Tile Installation Instruction

●Mount the coping, fold upward the end of the corner part
for the ridge, and then fix it to the cut end of the coping.
●Apply sufficient sealant to the cut portion of the corner
Corner part
part. Apply sealant.
Cut and raise the end,
and then fix it to the cut end of the coping.

Roofing tile
Corner part
Coping

Roofing tile

Valley plate

●Put the ridge cover on the corner part for the ridge, and
then apply sealant to the joint.

Valley plate
Roofing tile
Ridge cover
Corner part
Roofing tile
Roofing tile
Corner part
Ridge cover Sealant
Valley plate
Roofing tile Put the ridge cover on
the corner part.

112
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD GLASSA 600

7. Roofing Tile Installation Instruction Fitting of ridge cover


Fitting of corner part



×







23. Installing comma-pattern different-angle ridge (Joint of eaves edge, verge, and corner ridge)

<Processing of verge flashing>


*Sealant
Verge flashing (Do
wn
stre
am
Fold along the center of sid
e)
the corner ridge
Fold
Cut and
fold
Cut and fold
Fold

●Fold the verge flashing as shown in the diagram on the


right. Fold aligning Approx.

Roofing Tile Installation Instruction


with the eaves 25 mm
* Sealant edge flashing
Apply sealant to portions on the reverse side in which
pinholes are formed.

●F old back the end of top surface of the eaves edge
flashing and fold its downward-sloping portion at the
center of the corner ridge along the direction of the Built-up roofing
verge.
●Mount the ranking beam by retracting it by approx. 30
mm from the end of center of the corner ridge.
●Mount the processed verge flashing by aligning the top
surface with the position lower by approx. 25 mm than
the end of center of the corner ridge.

Eaves edge flashing


Approx. 25 mm
Verge flashing

●Adjust the working length of roofing tiles to be installed


below the comma-pattern different-angle ridge to the
given length or less.

Roofing tile

Eaves edge flashing


●Process the end of the ridge cover so that it will lie on
the reverse side of the roofing tile.
Verge flashing

(Fitting of corner part for the ridge) (Fitting of ridge cover)


Corner part Ridge cover

Sealant
Roofing tile Sealant Roofing tile

Eaves edge
flashing Eaves edge flashing
Verge flashing
Do not install SAVORY using a corner part for the
Verge flashing
corner ridge.

113
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD GLASSA 600

7. Roofing Tile Installation Instruction Fitting of ridge cover


Fitting of corner part



×







24. Installing square roof


<1> Fitting square roof using ridge covers
(Fitting of ridge cover)
Sealant
Ridge cover

Ridge cover
Roofing Tile Installation Instruction

●Mount a coping for the corner ridge up to the peak of


each ridge. Roofing tile
●Put the ridge cover (A) up to the other side. Coping
●Diagonally process (finish) the ridge cover (B), and then
apply sealant to the overlapped portion.
* Built-up roofing
Built-up roofing
Built-up roofing should be laid only if wood not treated
with preservative is used in place of copings.

●Diagonally process (finish) the ridge cover (C), and then


apply sealant to the overlapped portion.
Sealant Sealant
Ridge cover

●Be sure to apply sealant to portions


Ridge cover
in which pinholes are formed.
CAUTION
Not doing so may result in roof leaks.

Roofing tile
Ridge cover

<2> Fitting square roof using ridge cap (Fitting of corner part for the ridge)
●Completely install roofing tiles up to the peak of the
ridge on four roof surfaces, and then fit the corner ridge Ridge cap (to be locally procured)
using the corner part for the ridge. Built-up roofing*
●Fit the square roof by mounting copings around the four
roof surfaces and the ridge cap (to be locally procured)
in a way that presses the roofing tiles.
Do not install SAVORY using a corner part for the corner
ridge.

Coping

Roofing tile
Sealant

Corner part for the ridge

114
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free Ridge Installation Instruction


<1> Scope
Product Applicable area Applicable height Applicable slope

Homogeneous roof accessory Up to three-story housing Up to 10/10


General areas
Free ridge (Low-rise general housing) (Up to 6/10 for shed ridges)

Permanent verge flashing


(Permanent verge flashing of 6 mm in thickness)
[Enlarged Part-A]
<2> Verges Additional laying of built-up roofing
(of 500 in width)
Ledger strip, 18 (21) × 90 Permanent verge flashing
(Permanent verge flashing of 6 mm)
Roofing tile
Ledger strip, Fold
18 (21) × 90 Spacer
5 Additional laying of built-up (to be locally procured)
roofing (of 500 in width)

Homogeneous Roof Accessory Installation Instruction


Nail used to fix Processing of
the eaves edge flashing
Free ridge 45SUS decorative nails for free ridge the ledger strip
verge (left) or Nail used to fix
roof accessories
35SUS decorative screws for free ridge

20
Spacer to be
Nail used to fix roof accessories locally procured
Eaves edge flashing
The figure inside the parentheses
represents the size for permanent Part-A
The figure in the parentheses represents the size for permanent verge flashing
(of 6.0 mm in thickness) used for free ridge. verge flashing (of 6.0 mm in thickness) Cover the cut end of the ledger strip by processed
used for free ridge. eaves edge flashing (or steel sheet).

●Mount the ledger strip measuring 18 by 90 mm (or 21 by


90 mm), and then additionally lay built-up roofing of 500
mm in width over the entire length of the verge. In this
Free ridge verge (left)
case, raise the built-up roofing along the ledger strip.
Fixing method:
●Fix the permanent verge flashing to the ledger strip with Two nails or screws
nails used to fix roof accessories at spaces of 910 mm for free ridge and
or less. one nail for roof
accessories
●Cover the cut end of the ledger strip by processed the Nail used to fix roof accessories
eaves edge flashing (or steel sheet). (only applicable to side surface)
●To install a free ridge verge in the first row, mount a
275

spacer on the top surface of the ledger strip, and then 45SUS decorative nails
make slope adjustment. or
35SUS decorative screws
for free ridge
●Fix the free ridge verge with two 45SUS decorative nails
275

or 35SUS decorative screws for free ridge (in visible


place) and one nail for roof accessories (only on side
surface in hidden place).
●Install the free ridge verge in working length of 275 mm.

●Do not get on the free ridge verge.


●Do not excessively drive nails or fasten screws in the free
ridge verge.
CAUTION
Doing so may result in cracks in or damage to the free ridge
verge.

●Install the free ridge verge so that its top surface will tilt
toward the surface of sheathing (inward).

T ilting the free ridge verge outward may result in raindrops


from it.
Rainwater
CAUTION

115
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free Ridge Installation Instruction


<3> Comma-pattern ridge
Raise and hem the permanent verge flashing.
●Raise and hem the permanent verge flashing at the ledger strip on
the flat ridge side. Ledger strip, 18 (21) × 45
●Fix roofing tiles in the uppermost row using nails and adhesive in
combination, and apply of sealant to the nail heads. K-8·L sheet

Use adhesive in
●To install roofing tiles in the uppermost row on a combination to
sea install roofing tiles
free ridge, fix the tiles using nails and adhesive in lan
t in the uppermost row

30
combination.
CAUTION
Not doing so may result in scatter of roofing tiles. Apply sealant to the nail head

●Roof shingles available to use in the uppermost row vary with roofing
tiles. See the table shown below for details.
Homogeneous Roof Accessory Installation Instruction

Shingles available to
Roofing tile
use in the uppermost row
SUPERIOR II (GRANDE GLASSA and GLASSA) Eaves plate (F starter strip)
The figure in the parentheses represents the size for permanent verge flashing
PROUD (GLASSA) Eaves plate (N starter strip) (of 6.0 mm in thickness) used for free ridge.
PROUD (NATURAL GLASSA) Eaves plate (D starter strip)
Other COLORBEST Series Roofing tile
●After installing roofing tiles, put K-8·L sheet on the flat ridge (or
Permanent
ledger strip), and then mount permanent sheet metal (permanent sheet metal
three-pronged sheet metal or sheet metal locally procured) to the
comma-pattern ridge.
●After installing the free ridge verge, apply a permanent coating of
sealant to the comma-pattern ridge, and then install the free ridge.
●Install the free ridge verge in working length of 275 mm. K-8·L sheet
However, to make adjustment of working length near the comma-
pattern ridge, the working length can be extended up to 305 mm.

Two types of methods, using or not using a comma-pattern ridge part, are available to install the comma-pattern ridge.
(1) Method using the comma- Comma-pattern ridge
Permanent
pattern ridge part sheet metal
(Fabricated from roofing
tile or the shingle used
●Fabricate a comma-pattern ridge part in the uppermost row.)
from the roofing tile or the same
shingle as that used in the uppermost
row, make a preparation hole in it,
K-8·L sheet
275

and then fix it with two 45SUS nails


~ 30

or 35SUS screws for free ridge.


5 27

* Dimensions to fabricate the Sealant


5~3

comma-pattern ridge
(for reference)
05

A
125
B
90
90

D Permanent
Slope A (mm) B (mm) C (mm) D (mm) sheet metal Sealant
3/10 240 122 86 26
4/10 232 130 84 33
5/10 224 136 80 40
6/10 214 141 77 46
7/10 204 145 74 52
8/10 196 148 70 56 K-8·L sheet

(2) Method not using the Sealant


275 ~

comma-pattern ridge part


305

●Apply sealant to the joint of free ridge


verges (only to their side surface).

116
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free Ridge Installation Instruction


<4> Corner ridge
60 6
45SUS decorative nails for free ridge 123 Free ridge 0 Ledger strip, 18 (21) × 45
~ 13
or 2.5 Nail used to fix the ledger strip
35SUS decorative screws for free ridge 60 K-8·L sheet
Nail used to fix roofing
Nail used to fix tiles in combination
the ledger strip Roofing tile
with adhesive
Apply sealant to
the nail head.
sea
lan
t

Ledger strip, 18 (21) × 45


The figure in the parentheses represents the size for permanent verge
flashing (of 6.0 mm in thickness) used for free ridge.

Homogeneous Roof Accessory Installation Instruction


The figure in
●Install an eaves edge cap (made of steel sheet and to be locally procured) the parentheses
to the end of the ledger strip. represents the size for
permanent verge flashing
●Install roofing tiles. Fix narrow roofing tiles using nails and adhesive in Cut the corner by approx. 40 mm
(of 6.0 mm in thickness)
combination. Eaves edge cap (made of steel sheet, locally procured)
used for free ridge.
Apply sealant to the head of the nail that fixes a narrow roofing tile.

●Put K-8·L sheet on the ledger strip.


●Fix the free ridge with two 45SUS decorative nails or 35SUS decorative K-8·L sheet
screws for free ridge.
●To install the free ridge which reaches the end of the eaves edge, cut the
end of the free ridge and change the position of hole for nail.
●Install the free ridge in working length of 275 mm. However, when the Free ridge
working width is adjusted near the three-pronged ridge member, the Fixing method:
working length can be extended up to 305 mm. With two nails or
screws for free ridge

●Do not get on the free ridge.


●Do not excessively drive nails or fasten screws in
275
the free ridge.
CAUTION
Doing so may result in cracks in or damage to the 45SUS decorative nails for free ridge or
35SUS decorative screws for free ridge
free ridge.
Cut the end in line with the eaves edge.
Plug the existing hole for nail with sealant, and then make a new hole for the nail.

<5> Flat ridge


45SUS decorative nails for free ridge Free ridge K-8·L sheet Ledger strip, 18 (21) × 45
or 123
~ 13
35SUS decorative screws for free ridge 2.5 Permanent three-pronged
60* K-8·L sheet Shingle
sheet metal (or sheet Apply
Nail used to fix metal locally procured) sealant to
the ledger strip
sea
the nail head.
Shingle in the lan
t

uppermost row
Fix using nails
Ledger strip, 18 (21) × 45 Cut. and adhesive
in combination.
* In case of a slope ranging from 8/10 to 10/10,
mount the ledger strip in line with the center of the ridge.
The figure in the parentheses represents the size for permanent verge flashing
(of 6.0 mm in thickness) used for free ridge.

●Fix shingles in the uppermost row using nails and adhesive in


combination. Apply adhesive to the heads of these nails. 45SUS decorative nails for free ridge or
35SUS decorative screws for free ridge
Installationprecautions Free ridge
●Roof shingles available to use in the uppermost row vary with roofing
Shape of three-pronged sheet
tiles. See the table shown below for details.
metal if locally procured
Shingles available to
Roofing tile
use in the uppermost row
SUPERIOR II (GRANDE GLASSA and GLASSA) Eaves plate (F starter strip)
PROUD (GLASSA) Eaves plate (N starter strip)
PROUD (NATURAL GLASSA) Eaves plate (D starter strip)
Other COLORBEST Series Roofing tile

117
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<5> Flat ridge
●Install free ridges in the corner ridge from each side,
45SUS decorative nails for free ridge or
keeping a distance of approx. 10 mm between them, and 35SUS decorative screws for free ridge
then apply sealant to the joint of the free ridges. Used for free ridge
●Install the free ridges by putting the free ridge of the flat
45SUS decorative nails for free ridge or Sealant
ridge on that of the corner ridge.
35SUS decorative screws for free ridge
* Apply a permanent coating of sealant to the overlapped
portion of the free ridge of the flat ridge and that of the
corner ridge.

Permanent coating
of sealant*
Homogeneous Roof Accessory Installation Instruction

10

Sealant Free ridge

●If a verge or corner ridge is located


on each side of the flat ridge, install a
free ridge toward the center from Free ridge
each side of the flat ridge to fit it in
Permanent coating of sealant
the center.
●Cut the roofing tile and put it as a Spacer
spacer in the center, and put a free (Cut the roofing tile.)
ridge on the one on each side with Free ridge
sealant.

Permanent coating of sealant

●Install the free ridge in working length of


275 mm. However, when the working
width is adjusted near the center, the 45SUS decorative nail for free ridge or
working length can be extended up to 35SUS decorative screw for free ridge
Free ridge (Make a prepared hole)
305 mm.
45SUS decorative nails for free ridge or
35SUS decorative screws for free ridge
Free ridge

275
375
275
275

118
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<6> Overhang
●Apply a permanent coating of sealant to the eaves edge
flashing and verge flashing that overlap the permanent Permanent coating of sealant
overhang cap. Permanent verge flashing
(permanent verge flashing of 6 mm in thickness)

Roofing tile

Ledger strip
18 (21) × 90

The figure in the parentheses


represents the size for permanent verge flashing
(of 6.0 mm in thickness) used for free ridge.

Homogeneous Roof Accessory Installation Instruction


●Install the overhang leaving the free ridge verge in one
row, and then install the overhang cap and the Permanent overhang cap
Overhand cap (Process the permanent verge flashing.)
permanent overhang cap. (Process the eaves edge flashing.)
Put this on
the free ridge verge.
210
Dig into
90

the permanent
90 overhang cap.
30

30 Permanent overhang cap


(Process the permanent verge flashing.)
35

Overhang cap
(Process the eaves edge flashing.)

50
35

Permanent coating of sealant


●As shown in the diagram on the right, apply a permanent
coating of sealant to the overlapped portion of the free
ridge verge in the uppermost row and roofing tile.

Overhand cap

●Cut the side of the free ridge verge in the uppermost


row.
Appr
50
ox.

Cut.

119
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<7> Joint of flat ridge and wall
●Raise and hem the permanent flashing at the ledger Built-up roofing:
strip on the flat ridge side. Raise it by 50 mm or more from the top end
of the flashing.
(Raise the built-up roofing itself
by approx. 200 mm)
Raise and hem the end of
the permanent flashing.

The figure in the parentheses


Ledger strip, represents the size for permanent
18 (21) × 45 verge flashing (of 6.0 mm in thickness)
Homogeneous Roof Accessory Installation Instruction

used for free ridge.

●After installing roofing tiles, put K-8·L sheet on the


ledger strip of the flat ridge, and then install the free
ridge on the sheet.
Affix K-8·L sheet up to the top surface of the
permanent flashing.

●Do not get on the free ridge.


●Do not excessively drive nails or fasten
screws in the free ridge.
CAUTION
K-8·L sheet
Doing so may result in cracks in or
damage to the free ridge. Free ridge

●Install a coping up to the location of the free ridge, and


Flashing
then apply sealant of the edge of the coping.
●Install one flashing by overlaying it on the other flashing.
* Sealant
Sealant
No sealant is required when TOUGHMOCK is used in place
of copings. Coping, 18×90
*Sealant

K-8·L sheet

●Install another flashing by overlaying it on the other


flashing. Apply sealant to the overlapped portion.
●Apply sealant to the joints of the free ridge and Flashing Sealant
flashings.

Free ridge

120
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<8> Joint of Verge and Wall
●To join the permanent verge flashing and wall, raise
(raise and hem) the permanent plate against the wall.
Raise (and hem)
the permanent plate
against the wall.

Roofing tile

Homogeneous Roof Accessory Installation Instruction


Permanent
verge flashing

Nail used to fix the ledger strip

●Fix the free ridge verge in the uppermost row with two
45SUS decorative nails or 35SUS decorative screws for
free ridge (in visible place) and one nail for roof Coping, 18×90
accessories (only on side surface in hidden place).
Be sure to fix the side of the free ridge verge with
the two specified nails (or screws).

Sealant

Nail used to fix


roof accessories

45SUS decorative nails for free ridge


or
35SUS decorative screws for free ridge
Free ridge verge (left)

●Raise and hem the end of the flashing.


●Fit the end of the hemmed flashing by digging the hem
into the free ridge verge.
●Apply sealant to the joint of the free ridge verge and
flashing. Flashing
Raise and hem.

Sealant

Dig the bottom end


into the verge.

121
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<9> Joint with ventilation ridge
●Mount an end cap to each end of the ventilation ridge.
To mount an end cap, use the “End cap kit (Part Number:
KLYZ0**) (*: Color Index Number)” or locally fabricate a
ridge cover.

(1) Using the End cap kit


Permanent plate
●Mount the permanent flashing (used for the ventilation Permanent flashing
ridge) and completely install roofing tiles following the
installation instructions for roofing tiles and ventilation
ridge.
●L ay K-B·L sheet following the free ridge installation
instruction.
●Place the permanent plate for the End cap kit on each
Homogeneous Roof Accessory Installation Instruction

e
side of the permanent flashing.

ridg
* Take the center of each permanent plate as the end

ion
ilat
of the ventilation ridge.

ent
of v
nde
K-8·L sheet

ch
*Ea
●Place the end cap so that the end (joined side) of the end
[For Type-S ventilation ridge]
cap is aligned with the center of the permanent plate.
●Apply sealant to the end cap where the ventilation ridge
will overlap, and then put the ventilation ridge (the
diagram shows Type-S) on the end cap.
Type-S metallic
●Fix the ventilation ridge following the ventilation ridge
ventilation ridge
installation instruction.

Permanent coating of sealant

End cap

K-8·L sheet
Free ridge

●Fix the free ridge in the joint with the ventilation ridge with
four 45SUS decorative nails or 35SUS decorative screws for
free ridge.
●Apply sealant to the joint of the ventilation ridge and free
ridge.

Type-S metallic ventilation ridge

Sealant

Free ridge

45SUS decorative
nails for free ridge
or
35SUS decorative
screws for free ridge

122
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<9> Joint with ventilation ridge
(2) Locally fabricating an end cap [For Type-S ventilation ridge]
●Process a ridge cover as shown in the diagram below to
fabricate an end cap.
Type-S metallic ventilation ridge
End cap
Locally fabricating an end cap (Reference) Permanent coating
of sealant
Sealant End cap K-8·L sheet
19

100
(126
)

Homogeneous Roof Accessory Installation Instruction


50
50

The figure in the parentheses represents the size for


the Type-S steeply-sloped metallic ventilation ridge.

●Position the ventilation ridge.


●Apply a permanent coating of sealant to the top surface
of the end cap.
●Put the ventilation verge, covering the end caps. Free ridge
Type-S metallic ventilation ridge
●Fix the free ridge in the joint with the ventilation ridge with
four 45SUS decorative nails or 35SUS decorative screws for Sealant
free ridge. 45SUS decorative nails
●Apply sealant to the joint of the ventilation ridge and free for free ridge or
35SUS decorative screws
ridge. for free ridge

●Do not get on the free ridge.


●Do not excessively drive nails or fasten
screws in the free ridge.
CAUTION
Doing so may result in cracks in or
damage to the free ridge.

123
HEAT SHIELD
PREMIUM GLASSA Series GRANDE GLASSA Series QUAD Series

8. Homogeneous Roof Accessory Installation Instruction


GLASSA Series
Only for neo black, coconut brown,
〇 〇 〇
pearl gray, and irish green

1. Free ridge Installation Instruction


<10> Shed ridge
●Shed ridges are available in roof slopes up to 6/10.

Used for free ridge 45SUS decorative nails for free ridge or Free ridge
35SUS decorative screws for free ridge
Sealant
Plug the existing hole for K-8·L sheet
nail with sealant*2. Ledger strip, 18 (21) × 45
Roofing tile
45SUS decorative nail for free ridge
Built-up roofing
or
Sheathing
35SUS decorative screw for free ridge
Make a prepared hole to
fasten the nail or screw.
Homogeneous Roof Accessory Installation Instruction

Nail of 32 in length for roof accessories


(Make a prepared hole to fasten the nail)

Roofing tile
Adjustment coping*1
The figure inside the parentheses represents the size for the permanent verge
flashing (of 6.0 mm in thickness) used for free ridge. Free ridge verge (left)

<11> Joint with Type-S shed ridge


●Temporarily place the ventilation ridge to position the
adjustment coping. (Mount the adjustment coping on Type-S metallic ventilation ridge
sheathing and wall.) (used for shed ridge)
*1: To use any adjustment coping not treated with
preservative, put built-up roofing on it.
●Put K-8·L sheet on the place in which the free ridge is
End cap kit used for
mounted.
shed ridge
●Put K-8·L sheet on the place in which the free ridge is
mounted. Sealant
●Mount an end cap to the joint of the shed ridge for the
Used for free ridge
free ridge and the ventilation ridge, and then have the
free ridge at the End cap kit.
Roofing tile
●To fasten the screw in the wall for the free ridge, make a
preparation hole in the position in which the adjustment
coping is located.
*2: The current position of hole for screw is not available
to fasten the screw in the adjustment coping. Plug the
existing hole for screw with sealant.
●Apply sealant to the joint of the shed ridge for free ridge
and the ventilation ridge.

Used for free ridge

Plug the existing hole for nail with sealant*2.

45SUS decorative nail for free ridge or


35SUS decorative screw for free ridge
Make a prepared hole to fasten the nail or screw.

124
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<1> Installation for Type-S ventilation ridge
■Layout diagram ■Overview of installation
Ridge cover
Ventilation ridge
Permanent flashing Ventilation ridge
104 Joint piece
Auxiliary sheet (50×50) Tapping screw
30 for fixing Auxiliary sheet
Tapping screw for fixing
Roofing tile
19

60

Rafter

Roofing tile
Built-up roofing Permanent flashing
Sheathing

■Installation procedure

Ventilation Accessories Installation Instruction


(1) Making an opening in the sheathing 60
●M ake an opening in the sheathing for the
60
ventilation ridge to exhaust air.

40
<Dimensions of opening>
60

40
Lengthwise* Widthwise

0
P-8
(910×P-80) mm 60 mm 60 60


: 91
gth
* “P” represents the number of
40

len
40

ng
the ventilation ridges to be installed.
60 60
eni
When P = 0.5, L = 375 mm Op
40

When P = 1, L = 830 mm
When P = 2, L = 1740 mm
40

(2) Mounting the permanent flashing


●Completely lay built-up roofing up to the center of the ridge.
(Cut off built-up roofing at the opening.)
40
40

●Mount the permanent flashing in alignment with the opening in the sheathing.
(Raise the portion equipped with heat insulating material.)
●Apply sealant to the folded portion of the permanent flashing.
●Completely install roofing tiles up to the permanent flashing.
Heat insulating material
Install roofing tiles leaving Cut a space of approx. 5 mmApprox.
Permanent from5 the
mm raised permanent
flashing. flashing Permanent flashing
Nail for ventilation
If a slit in roofing tile comes toaccessories
the position in which the ventilation ridge is installed,
plug the slit (groove) with sealant. Roofing tile

HeatHeat insulating
insulating material
material
Cut Cut Permanent Approx. 5 mm
Permanent Approx. 5 mm
flashing
flashing
Nailventilation
Nail for for ventilation
accessories
accessories
Roofing
Roofing tile tile

(3) Mounting copings *Built-up roofing Coping


Coping
●Mount copings to the rigde cover. Sealant

(Do not mount any coping to the position in


which the ventilation ridge is installed.)
*Built-up roofing
<Coping spacing> WhenSealant P = 0.5, L = Coping
465 mm L
ing
spac
When P = 1, L = 920 mm ing
Cop
When P = 2, L = 1830 mm
●Apply sealant to the edge of coping, respectively.
*Built-up
*Built-up roofing
roofing
Sealant Coping
Coping
Sealant

* To use any coping not treated with preservative, put built-up


roofing on it.

133
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<1> Installation for Type-S ventilation ridge

(4) Mounting joint pieces


●Mount a joint piece to each joint of the ridge cover and the
ventilation.
●To install the ventilation ridges in series, follow the same Joint piece
procedure.
Joint piece

ジョイントピース

Joint piece
Joint piece
ジョイントピース

ジョイントピース
Ventilation Accessories Installation Instruction

(5) Installing the ventilation ridge


ジョイントピース
●Install the ridge between the joint pieces.
●Drill a preparation hole in the roofing tile in alignment with
the hole for screw in the ridge.
●P ut an auxiliary sheet on the hole for screw, and then
mount a tapping screw (of 35 mm in length) for fixing.
(Remove the protective paper from the reverse side of the
auxiliary sheet, and then face the adhesive surface down.)

Be sure to remove chips of roofing


tiles.
Ventilation ridge

CAUTIONFixingNotscrewdoing so may result


104
on roof leaks. Tapping screw for fixing

Auxiliary sheet
Auxiliary sheet
Ventilation ridge
Fixing screw 104
固定用タッピングビス
Ventilation ridge
補助シート
Auxiliary sheet

本体換気材
固定用タッピングビス

補助シート

本体換気材

(6) Finishing
●Cut to remove auxiliary sheet sticking out of the ventilation
ridge and the collar.

134
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<2> Installation for Type-S steeply-sloped ventilation ridge
■Layout diagram (Reference: Layout of shed ridge)
* The layout shown below is also applicable to shed roofs.
Ventilation ridge Ventilation ridge
(Applicable slopes: Permanent
2.5/10 to 6/10)
Auxiliary sheet (50×50)
Permanent flashing
flashing Tapping screw for fixing
0

Ventilation ridge
Auxiliary sheet (50×50) Ventilation ridge

130
13

60 Roofing tile
Permanent flashing Permanent Auxiliary sheet (50×50)
Tapping screw for fixing flashing Tapping screw for fixing
Roofing tile
30

Auxiliary sheet (50×50) 20

130
13

Built-up roofing Roofing tile

20
60

30
Sheathing
Tapping screw for fixing
Roofing tile
30

20
19

Built-up roofing

20
30
Sheathing 19

Rafter
19

Ridge beam
Rafter 19 Gable board

* Use a ridge cover (of 130 mm in width) for steeply-sloped ventilation ridge. Rafter
Ridge beam

Ventilation Accessories Installation Instruction


■Installation procedureRafter Gable board

(1) Making an opening in the sheathing


●M ake an opening in the sheathing for the 60
ventilation ridge to exhaust air.
<Dimensions of opening>

40
60
Lengthwise* Widthwise

0
P-8
(910×P-80) mm 60 mm


60

: 91
60

gth
* “P” represents the number of

len
ng
the ventilation ridges to be installed. eni
Op
When P = 0.5, L = 375 mm
When P = 1, L = 830 mm
When P = 2, L = 1740 mm
40

(2) Mounting the permanent flashing


●Completely lay built-up roofing up to the center of the ridge.
(Cut off built-up roofing at the opening.)
●Mount the permanent flashing in alignment with the opening in the sheathing.
(Raise the portion equipped with heat insulating material.)
●Apply sealant to the folded portion of the permanent flashing.
●Completely install roofing tiles up to the permanent flashing. Permanent flashing
Install roofing tiles leaving a space of approx. 5 mm from the raised permanent
flashing. Heat insulating material
Cut Permanent Approx. 5 mm
If a slit in roofing tile comes to the position in which theflashing
ventilation ridge is installed,
plug the slit (groove) with sealant.
Heat insulating material
Cut material Permanent Approx. 5 mm Roofing tile
Heat insulating
Cut flashing Approx. 5 mm
Permanent
flashing

Roofing tile
Roofing tile

Coping
(3) Mounting copings *Built-up roofing
Coping
●Mount copings to the rigde cover. Sealant
Sealant
(Do not mount any coping to the position in
which the ventilation ridge is installed.) L
ing
<Coping spacing> When P = 0.5, L = 465 mm spac
ing
When P = 1, L = 920 mm Cop
When P = 2, L = 1830 mm
●Apply sealant to the edge of coping, respectively.

* To use any coping not treated with preservative, put built-up


roofing on it.

135
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<2> Installation for Type-S steeply-sloped ventilation ridge

(4) Mounting joint pieces


●Mount a joint piece to the junction of the ridge cover (of
130 mm in width) for steeply-sloped ridge and the
Joint piece
ventilation ridge.
●To install the ventilation ridges in series, follow the same
procedure.

Jointpiece
Joint piece
ジョイントピース
ジョイントピース

Joint piece
Joint piece
ジョイントピース

ジョイントピース
ジョイントピース
Ventilation Accessories Installation Instruction

(5) Installing the ventilation ridge ジョイントピース


●Install the ridge between the joint pieces.
●Drill a preparation hole in the roofing tile in alignment with Ridge cover (of 130 mm in width)
the hole for screw in the ridge. for steeply-sloped ridge
●P ut an auxiliary sheet on the hole for screw, and then
mount a tapping screw (of 35 mm in length) for fixing.
(Remove the protective paper from the reverse side of the
auxiliary sheet, and then face the adhesive surface down.)

Be sure to remove chips of roofing 棟包急勾配用


棟包急勾配用 Tapping screw for fixing
tiles.
Ventilation
Ventilation ridge
ridge
Fixingscrew
Fixing screw
131030
CAUTION Not doing so may result on roof leaks.
Auxiliary sheet
Auxiliarysheet
Auxiliary sheet
棟包急勾配用
Ventilation ridge
固定用タッピングビス
Type-S steeply-sloped
固定用タッピングビス
Fixing screw ventilation ridge
130
補助シート
補助シート
Auxiliary sheet

S型急勾配換気材
固定用タッピングビス
S型急勾配換気材

補助シート

S型急勾配換気材
(6) Finishing
●Cut to remove auxiliary sheet sticking out of the ventilation
ridge and the collar.

136
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<3> Installation for Type-L ventilation ridge
■Layout diagram ■Overview of installation Upper part of the ridge
Lower part of the ridge
Upper part of the ridge Tapping screw to fix
Lower part of the ridge the lower part
Angle piece for fixing 13 Ridge cover
Screw to connect 104 0
Screw to
the upper and lower parts
connect the upper
Tapping screw to fix Permanent Sealant and lower parts
the lower part flashing
19 34
Sealant
Auxiliary sheet
Roofing tile
Auxiliary sheet
Built-up roofing Angle piece for fixing
(50×30)
Sheathing
Self-drilling screw Opening width: 60 mm Self-drilling screw
used to fix the angle piece used to fix Permanent
the angle piece flashing Roofing tile

Ventilation Accessories Installation Instruction


■Installation procedure
(1) Making an opening in the sheathing
●M ake an opening in the sheathing for the 60
ventilation ridge to exhaust air.
<Dimensions of opening>

40
60
Lengthwise* Widthwise

0
P-8
(910×P-80) mm 60 mm


: 91
gth
* “P” represents the number of 60

len
60
ng
the ventilation ridges to be installed. eni
Op

When P = 0.5, L = 375 mm


When P = 1, L = 830 mm
40

When P = 2, L = 1740 mm

(2) Mounting the permanent flashing


●Completely lay built-up roofing up to the center of the ridge.
(Cut off built-up roofing at the opening.)
●Mount the permanent flashing in alignment with the opening in the sheathing.
(Raise the portion equipped with heat insulating material.)
●Apply sealant to the folded portion of the permanent flashing.
●Completely install roofing tiles up to the permanent flashing.
Install roofing tiles leaving a space of approx. 5 mm from the raised permanent
Heat insulating material
flashing. Cut Permanent Approx. 5 mm
If a slit in roofing tile comes to the position inflashing which the ventilation ridge is installed, Permanent flashing
Nail for ventilation
plug the slit (groove) with sealant. accessories
Heat insulating material Roofing tile
Cutmaterial
Heat insulating Permanent Approx. 5 mm
Cut Permanentflashing
Approx. 5 mm
Nail for ventilation
flashing
accessories
Nail for ventilation
accessories Roofing tile
Roofing tile

(3) Mounting copings


*Built-up roofing
●Mount copings to the rigde cover. Sealant Coping
(Do not mount any coping to the position in Sealant

which the ventilation ridge is installed.)


<Coping spacing> When P = 0.5, L = 465 mm ing
L
When P = 1, L = 920 mm spac
ing
Cop
When P = 2, L = 1830 mm
●Apply sealant to the edge of coping, respectively.

* To use any coping not treated with preservative, put built-up


roofing on it.

137
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<3> Installation for Type-L ventilation ridge

(4) Mounting angle pieces for fixing and joint pieces


●Determine the mounting position of the angle piece by the width of the
ridge cover (using the coping as a guide).
* Align the positions of the holes for screws in the right and left angle
pieces.
●Lay the auxiliary sheet according to the holes for screws in the angle
pieces.
* Remove the protective paper from the
Screw (of 45 mm in length) for angle piece
reverse side of the auxiliary sheet, and
Auxiliary sheet
then face the adhesive surface down.
Angle piece for fixing
●Fix the angle piece with the self-drilling
Cut the auxiliary sheet.
screw (of 45 mm in length) used to fix the
angle piece.
●Cut to remove auxiliary sheet sticking out
of the angle piece, and then apply sealant
Sealant
to the edge of the angle piece.
Ventilation Accessories Installation Instruction

●Fix the ridge cover (on the reception side)


to the coping.
(Put the ridge cover on the coping by 50
Sealant
mm or more.)
(Put the reception-side ridge cover on the
angle piece by approx. 50 mm.)
●A pply sealant on the joint of the ridge
cover.

(5) Mounting the lower part of the ventilation ridge


●Dismount the upper part of the ridge, and
Dismount the upper part of
then put the lower part of it on the ridge
the ridge.
cover.
●A lign the hole in the side of the angle
piece with the hole used to fix the lower Lower part of 104
part of the ridge. the ridge
Fixing screw
●Mount the lower part of the ridge to the (of 15 mm
19

angle piece with the tapping screw (of 15 in length)


mm in length).
●A pply sealant to the joint of the lower
part of the ridge, and then put the ridge
cover on it.
●In order to install the ventilation ridges in
series, mount the lower part of the next one.
●Cut and remove auxiliary sheet sticking out
of the lower part and collar of the ridge.

(6) Mounting the upper part of the ventilation ridge


Upper part of the ridge
●Connect the upper and lower parts of the
ridge with each other using the 130
Screw to connect
connecting screws. the upper and
●Securely hold to fix the upper part so as lower parts
not to leave a gap between the upper and
lower parts at the end of the ridge.

138
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<4> Installation for Type-L350 ventilation ridge
■Layout diagram ■Overview of installation Upper part of the ridge

Upper part of the ridge


Screw to connect the upper Ridge cover
Lower part of the ridge
Permanent flashing and lower parts
17
Screw to connect 102 0
the upper and
lower parts 30

Auxiliary sheet Lower part of


(50×50) the ridge
Double coatings

52
72
of sealant
Roofing tile

85 Opening width:
85 mm
Screw used to fix
Permanent flashing
the lower part
85

Ventilation Accessories Installation Instruction


■Installation procedure 85

(1) Making an opening in


the sheathing
●M ake an opening in the
sheathing for the ventilation
ridge to exhaust air.

(2) Mounting the permanent flashing (Opening length)


When P = 0.5, L = 420 mm
:L

●Completely lay built-up roofing up to the center of the ridge


gth

When P = 1, L = 850 mm
len

(Cut off built-up roofing at the opening.)


ng

When P = 2, L = 1780 mm
eni

●Mount the permanent flashing in alignment with the opening in the


Op

sheathing.
* Raise the portion equipped with dew-proof material.
●Apply sealant to the folded portion of the permanent flashing.
●Completely install roofing tiles up to the permanent flashing.
Install roofing tiles leaving a space of approx. 5 mm from the raised
permanent flashing.
If a slit in roofing tile comes to the position in which the ventilation
Cut
ridge is installed, plug the slit (groove) with sealant. * Raise the portion Sealant
Nail for ventilation equipped with
accessories dew-proof material. Permanent
Spa flashing
Cut ce o
f ap
prox
.5m
m
Cut
Nail for ventilation
accessories
Nail for ventilation
accessories

Fold the permanent flashing.

(3) Mounting copings


●Mount copings (18×90) to the position in which the ridge cover is mounted.
Built-up roofing
●Temporarily place the lower part of the ridge in the opening to position the
coping, and then fix the coping.
●Apply sealant to the edge of the coping.
(No sealant is required when TOUGHMOCK is used in place of copings.)

(Built-up roofing)
●To use any coping not Built-up roofing
Sealant Coping
treated with preservative,
put built-up roofing on it.
( N o b u i l t - u p r o o f i n g Built-up roofing
Sealant Coping
Built-up roofing
needs not to be put on
Sealant Coping Process the coping
the coping if it is treated by having it at
Coping (18×90)
with preservative.) the permanent flashing.

139
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


To the lower
part Auxiliary sheet
Screw used to fix
<4> Installation for Type-L350 ventilation ridge the lower part

(4) M o u n t i n g t h e l o w e r p a r t o f t h e Screw used to fix


the lower part
ventilation ridge To the lower
Auxiliary sheet
●Mount the lower part of the ridge in alignment with part
Screw used to fix
the opening. the lower part Screw used to fix
Lower part of the lower part
●Drill a preparation hole in alignment with the hole for the ridge Auxiliary sheet
screw in the lower part.
●R emove the chips of roofing tiles and place the
auxiliary sheet in the position of the hole for screw in
the lower part of Type-L350, and then fix the lower
part with the screws (of 35 mm in length).

Be sure to remove chips of roofing


tiles.
CAUTION Not doing so may result on roof leaks.
Lower part of
the ridge
(5) Mounting the ridge cover
Ventilation Accessories Installation Instruction

●Overlap the lower part of the ridge and the ridge cover by 50 mm or more.
*1: Apply double coatings of sealant to the overlapped portion.
*2: Pay careful attention not to cause the sealant to plug up the drain hole in *1: Double coatings
of sealant
the side of the lower part of ridge.
Ridge cover
(6) Mounting the upper part of the ventilation ridge *2: Do not plug up the drain hole.
●Connect the upper and lower parts of the ridge with each other using the
connecting screws.
●Fix the upper part of the ridge while checking for the conditions of the ridge Screw to connect the
cover so that the ridge can be aligned. upper and lower parts
Screw to Upper part of
connect the upper the ridge Upper part of the ridge
No fine adjustment of alignment and lower parts

of the upper part is allowed after


temporarily fixing it with the
screw. Flat and straight

CAUTION Check for the alignment in


Screw to
roofing tiles

advance, and then fix the upper connect the upper


Upper part of
the ridge
and lower parts
part with the screw.

Installing the ventilation ridges in series

(1) Making an opening in sheathing


●Make an opening to exhaust air in the sheathing on which the ridge is installed. Permanent flashing
s: L

Example: To install 0.5P and 1P of ridges in series,


serie
ed in

L = 420 mm + 850 mm = 1270 mm *Overlap the permanent flashings


stall
re in

Make a 1270-mm opening to exhaust air. by 50 mm or more.


es a
ridg

●Mount the permanent flashing in alignment with the opening in


the
hen
gw

the sheathing.
enin
e op

* Overlap the permanent flashings with each other by 50 mm or


of th
gth

more.
Len

(2) Mounting the junction of the lower part of the Cut leaving 10 mm
Bend inward by 5 mm
ventilation ridge and the upper part
Cut
●C ut the lower part of the ridge on the overlap side as
shown on the right, and then fold it inward with a clamper. Screw to connect
the upper and
●Process the lower part of the ridge, and then overlap it with Lower part of the ridge Upper part of the ridge (1P) lower parts
mm

the lower part of another ridge by 50 mm or more.


.5


rox

* Apply double coatings of sealant to the overlapped portion.


app
of

* Pay careful attention not to cause the sealant to plug up


ace

Upper part of the ridge (0.5P)


Sp

Flat and straight


the drain hole in the side of the lower part. *Double coatings of roofing tiles
●Connect the upper and lower parts with each other sealant
using the connecting screws. Ridge cover

●Ensure that the upper part is aligned with the ridge


cover, and then fix the upper part.

140
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<5> Installation for Type-L600 ventilation ridge
■Layout diagram ■Overview of installation

Screw to connect Upper part of the ridge 227 Upper part of the ridge
the upper and Dew-proof 130
lower parts material
Lower part of
the ridge
Permanent Screw to connect
flashing

66
the upper and

98
Insect-proof net lower parts Ridge cover for
steeply-sloped ridge
Opening width: Screw to fix the lower part (of 130 mm in width)*
Roofing tile 85 mm
Built-up roofing Sealant
Sheathing Screw to fix the angle piece Lower part of the ridge
Angle piece for fixing
Rafter Auxiliary sheet
Ridge Angle piece for fixing
beam Roofing tile
* Use a ridge cover for steeply-sloped ventilation ridge (of 130 mm in width).
Sealant
■Installation procedure

Ventilation Accessories Installation Instruction


Angle piece for fixing
Screw used to fix the lower part
(1) Making an opening in the sheathing
Auxiliary sheet
●Make an opening in the sheathing for the ventilation ridge to exhaust air.
<Dimensions of opening> Joint piece
830 mm lengthwise, 85 mm widthwise
* When the Type-L600 is installed by the wood-frame construction method, the opening 85
area of the substrate of 600 cm2 or more cannot be secured only by the opening in the
sheathing shown on the left due to the presence of ridge beam.
Secure the opening area using the substrate construction like that shown below.
(Making the opening width larger than 85 mm eliminates the substrate used to fix the
ventilation ridge, thus disabling it to be fixed.)
40

30
h: 8
85 85
gt
Sheathing Sheathing len
ng
eni
Op

85 85

Sheathing Sheathing 40

(2) Mounting the permanent flashing


●Completely lay built-up
Heat insulating material roofing up to the center of the ridge.
Cut
(Cut off built-up roofing at the opening.)
●Mount the permanent flashing in alignment with the opening in the sheathing.
Heat insulating material
Nail
85 for ventilation
(Raise the portion equipped accessories
with heat insulating material.)
85
Cut
Sheathing Sheathing
●Apply sealant to the folded portion of the permanent flashing.
●Completely install roofing tiles up to the permanent flashing. Nail for ventilation
accessories
Install roofing tiles leaving a space of approx. 5 mm from the raised permanent
flashing.
If a slit in roofing tile comes to the position in which the ventilation ridge is installed,
plug Approx.
Permanent the slit (groove) with sealant.
5 mm
flashing
Heat insulating material Permanent Approx. 5 mm
Cut flashing
Roofing tile

Roofing tile
Nail for ventilation
accessories
*Built-up
roofing

(3) Mounting copings cin


g: 9
20
pa
●Mount copings to the ridge cover. ings
Permanent Approx. 5 mm Cop
* These copings are different in the size from standard one. (Single-side width: 130 mm)
flashing

Roofing tile
<Coping spacing> 920 mm
●Apply sealant to the edge of coping, respectively.

* To use any coping not treated with preservative, put built-up


roofing on it.

141
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<5> Installation for Type-L600 ventilation ridge
(4) Mounting angle pieces for fixing
●Determine the mounting position of the angle piece
by the width of the ridge cover accessories (using Screw to fix the angle piece
Screw to fix the angle piece
Angle piece for fixing Screw to fix the angleCutpieceCut the auxiliary sheet,
the coping as a guide). Angle piece for fixing the auxiliary sheet,
Cut theapply
auxiliary sheet,
Angle piece for fixing andand
thenthen
apply sealant.
sealant.
(Determine the position so that the holes for angle and then apply sealant.
Auxiliary sheet
Auxiliary sheet
pieces located on each side will be definitely Angle piece Auxiliary sheet
aligned.) for fixing
●Lay the auxiliary sheet according to the holes for
Auxiliary sheet
screws in the angle pieces.
* Remove the protective paper from the reverse side Sealant
of the auxiliary sheet, and then face the adhesive
surface down.
◆Fix the angle piece with the screws (4 screws per
angle piece) used to fix the angle piece.
◆Cut to remove auxiliary sheet sticking out of the
angle piece, and then apply sealant to the edge of
Ventilation Accessories Installation Instruction

the angle piece.

(5) Mounting joint pieces


●Mount a joint piece to the junction of the ridge
cover (of 130 mm in width) for steeply-sloped
ridges.
●In order to mount the ventilation ridges in series,
mount the lower part of the next one.
* Position a joint piece so that the ridge cover and the Joint piece

ventilation ridge will overlap by 50 mm. Dismount the upper part.


Ridge cover accessory

(6) M ounting the lower part of the Dismount the upper part.
Dismount the upper part.
Lower part of the ridge
Lower part
ventilation ridge of the ridge
Screw to fix
●D ismount the upper part of the ridge, and then the lower part
Lower part
mount the lower part of it so that the end of the Lower
of the ridgepart
of the ridge
lower part will overlap the waterproof tape of the Screw to fix
the Screw
lower part
to fix
joint piece by half the length of the tape. the lower part
●Align the hole in the side of the angle piece with
the hole used to fix the lower part of the ridge.
●M ount the lower part of the ridge to the angle
piece with eight screws used to fix the lower part. Screw used to fix
the lower part
Screw to connect the upper and lower parts
Upper part
of the ridge
Lower part
(7) M ounting the upper part of the of the ridge

Screw to connect the upper and lower parts


ventilation ridge Screw to connect the upper and lower
Upper partparts Screw to connect the upper
of the ridgepart
Upper
●Connect the upper and lower parts of the ridge ofLower part
the ridge
and lower parts
of the ridgepart
Lower
with each other using eight connecting screws. of the ridge
●Securely hold to fix the upper part so as not to
leave a gap between the upper and lower parts at
the end of the ridge.

Process according to Lower part of the ridge


Installing to hipped roof (of 910 mm in the center of the ridge) the roof shape.
Portion to be processed for mounting ridge cover

●This product provides a processing allowance by


extending the area for ridge cover on each side in
Upper part
order to facilitate installation to a hipped roof of of the ridge
910 mm in the center of the ridge. Process the
area according to the roof shape, and then install
this product.
Apply sealant to the edge
of the angle piece.

Sealant

142
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<6> Installation for Type-E ventilation ridge

(1) Making an opening in sheathing Opening width: 40 mm when P=1 and 2


●Make an opening in the sheathing for the ventilation ridge
to exhaust air.
●Make the opening roughly in the center of a place the
ridge is installed. Opening length:
●To install the ventilation ridges in series, make an 500 mm when P = 1 * The center of the opening should
opening in each ridge. 1500 mm when P = 2 match the center of the ridge.
Do not make the openings in series.
●Mount a permanent flashing to each opening.

●Apply sealant to slits in roofing tiles on Opening spacing to install


the ventilation ridge in series
which the ventilation ridge is installed. 1P to 1P: 829 mm
Not doing so nay result in roof leaks. 2P to 2P: 1738 mm
●I f the Type-E ridge is used in the
structure shown in Fig. 1, required

Ventilation Accessories Installation Instruction


opening area cannot be secured due to Opening Opening
the presence of ridge beam. Use the
CAUTION substrate structure like that shown in
Fig. 2 to secure the opening area of the
substrate. (Making any change in the
width or length of the opening may
result in problems with waterproofness
Fig. 1 Fig. 2
and fixing of the ridge.)
Ventilation ridge Ridge cover
(2) Installing Type-E ventilation ridge Dedicated fixing nail Double coatings of
(supplied) sealant to the
●Joining the ventilation ridge and standard ridge cover by
overlapped portion
overlapping them by approx. 80 mm.
Overlap by
●A pply double coatings of sealant to the overlapped
approx. 80 mm
portion of the ventilation ridges.
●In order to install the Type-E ventilation ridges in series,
follow the same procedure.
Ridge cover
●Be sure to put a coping (18×90) of 80 mm in length in all
Permanent flashing
junctions.
●M ake a preparation hole in the roofing tile before
installing the ridge, and then fix it with dedicated nails
supplied with the ventilation ridge.
Sealant
Installing one ventilation ridge
Ventilation ridge Ridge cover
Installing the ventilation ridges in series Double coatings of
sealant to the
Dedicated fixing nail (supplied) overlapped portion
Ventilation ridge Overlap by
Permanent approx. 80 mm
flashing Double coatings of
Dedicated sealant to the
fixing nail overlapped portion
(supplied) 107
(10 Permanent flashing
74 3)
Dedicated fixing nail
(supplied)
30
Waterproof Ventilation ridge
packing
18 Put a coping (18×90) of 80 mm in
length in the overlapped portion of
Ridge cover the ridges.

Opening width:
40 mm Installing the ventilation ridges in series

143
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<7> Installation for Type-S shed ventilation ridge

■Layout diagram
Tapping screwfor fixing
Type-S metallic Apply double coatings
Ventilation ridge
ventilation ridge of sealant.
(used for shed roofs) nt
Permanent flashing Seala
Adjustment
coping
Auxiliary sheet
Overlap by
Roofing tile approx. 50 mm
Roofing tile
Built-up
roofing
Auxiliary sheet
Decorative Rafter
gable board
(to be mounted Ridge cover used for
afterward) * shed ventilation ridge
Substrate of
gable board
W
Ventilation Accessories Installation Instruction

Opening

■Installation procedure
(1) Making an opening in sheathing
●Make an opening in the sheathing for the ventilation ridge to exhaust

L
air.
<Dimensions of opening>
Lengthwise (L): 830 mm when P = 1
1740 mm when P = 2
Widthwise (W): 20 mm
nt
Seala
Insulating material*3
(2) Mounting the permanent flashing
Permanent
●Completely lay built-up roofing by hanging it along the wall surface from flashing
the center of the ridge in the way of covering the substrate of the gable
board.
●Cut off built-up roofing at the opening.
●Mount the permanent flashing in alignment with the opening in the
sheathing.
(Raise the portion equipped with heat insulating material.)
●Apply sealant to the folded portion of the permanent flashing.
●Install roofing tiles leaving a space of approx. 5 mm from the raised
permanent flashing.
Leave a space of
approx. 5 mm

(Ventilation ridge installation area) Permanent Roofing tile


Cut off built-up roofing flashing Roofing tile
according to the opening.

Substrate Built-up
of gable roofing
board Rafter

Built-up roofing
* No built-up roofing is
needed if the coping is
treated with preservative.
(3) Mounting the adjustment coping on the side
Built-up
●T emporarily place ventilation ridge accessories in the mounting roofing
position, and then determine a position to which the adjustment coping
is fixed.
Adjustment
coping
●The thickness of the adjustment coping should be the same as that of
the decorative gable board.

144
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<7> Installation for Type-S shed ventilation ridge
Coping (18×45): To prevent the deformation of ridge cover
(4) Mounting copings for the shed ventilation ridge
Coping (18×90): To fix ridge cover for
●T emporarily place a ridge cover for the shed ventilation ridge
* No copings need to be
the ventilation ridge, and then mount mounted in a place to which Built-up roofing
copings (18×90 or 18×45) on the the ventilation ridge is installed. Seala
nt

roof-surface side and copings (18×45) *6


on the adjustment copings on the

40
wall-surface side according to the

g:9
cin
ridge cover.

a
sp
ing
* Leave a 920-mm space including an Coping

p
Co
overlap allowance between rafters Adjustment
coping
when P = 1, or a 1830-mm space
when P = 2.
Ridge cover of the shed
ventilation ridge
(5) Mounting ridge covers for shed ventilation ridge
●Join ridge covers for the shed ventilation ridge by overlapping them by

Ventilation Accessories Installation Instruction


approx. 50 mm.
(Overlap these ridge covers from left to right.)
nt
●Apply double coatings of sealant to the overlapped portion of the ridge Seala

covers for the shed ventilation ridge. Double coatings of sealant

m
ox by
0m
Roofing tile

pr p
ap erla
.5
Ridge cover for

Ov
the shed ventilation ridge

(6) Installing the ventilation ridge Tapping screw for fixing

●Install the ventilation ridge by putting it on the ridge cover for shed Type-S metallic
Double coatings of sealant
ventilation ridge
ventilation ridge. (used for shed roofs) nt
Seala
<Fixing on the rood-surface side>
●D rill a preparation hole in alignment with the hole for screw in the
ventilation ridge. Overlap by
approx. 50 mm
●Remove the chips of roofing tiles, affix auxiliary sheets supplied with the Roofing tile
shed ventilation ridge to the hole for screw, and then fix the ventilation
ridge with tapping screws used to fix it. Auxiliary sheet
<Fixing on the wall-surface side>
●Mount tapping screws used to fix the ventilation ridge in alignment with Ridge cover of
the holes for screws in the ventilation ridge. the shed ventilation ridge

Tapping screw to fix


the ventilation ridge

When installing the ventilation ridge, pay careful


attention not to excessively fasten the screws. Auxiliary sheet
CAUTION Excessively fastening the screws may cause the ventilation
Tapping screw to fix
ridge to deform. the ventilation ridge

[Methods for overlapping the ventilation ridge and the ridge cover for shed ventilation ridge] * In order to facilitate overlapping of
the ventilation ridge and the ridge
(Direction to overlap the ridge) (Direction to overlap the ridge cover) (Direction to overlap the ridge and the ridge cover) cover, they are different in sizes
between the right and left sides.
Overlap from right to left Overlap from left to right Ventilation
250

253

Ridge cover Ridge Ridge Ridge cover Ridge

Ridge cover
250

247

for the shed


Left Right Left Right ventilation ridge

Eaves-edge side Eaves-edge side Eaves-edge side

145
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<8> Installation for Type-S flashing
■Layout diagram
Flashing
Flashing

Ventilation
Ventilationflashing
flashing
Permanent
Permanentflashing
flashing Tapping
Tappingscrew
screwtotofixfix
the
theventilation
ventilationflashing
flashing
115
115

Ventilation
Ventilationflashing
flashing
101000
Tapping
Tappingscrew
screwforforfixing
fixing
3030 Auxiliary
Auxiliarysheet
sheet(50×50)
(50×50)
Roofing
Roofingtile
tile Permanent
Permanent
Built-up
Built-uproofing
roofing flashing
flashing
Sheathing
Sheathing Auxiliary
Auxiliarysheet
sheet
119
9

3030
Roofing
Roofingtile
tile
Ventilation Accessories Installation Instruction

Rafter
Rafter

Joint
Jointpiece
piece

■Installation procedure
(1) Making an opening in sheathing 30
●Make an opening in the sheathing for the exhaust section to exhaust air.
<Dimensions of opening>

30
h: 8
Lengthwise: 830 mm, 30

ngt
Widthwise: 30 mm

g le
nin
Ope

(2) Mounting the permanent flashing


●Completely lay built-up roofing by raising it by approx. 200 mm along the wall
surface.
●A dditionally lay built-up roofing of 500 mm in width on a place to which the Sealant
Additionally lay built-up roofing of
permanent flashing is mounted.
approx. 500 mm in width.
●Cut off built-up roofing at the opening. Cut according to
●Mount the permanent flashing in alignment with the opening in the sheathing. the opening.
(Raise the portion equipped with heat insulating material.)
●Apply sealant to the folded portion of the permanent flashing. Raise by approx. 200 mm.
●Completely install roofing tiles up to the permanent flashing.
Install roofing tiles leaving a space of approx. 5 mm from the raised permanent
flashing.

Additional laying of
built-up roofing
Raise by approx. 200 mm

Permanent flashing Approx. 5 mm Roofing tile


Insulating material
Folding
Roofing tile
Insulating material

Nail for ventilation accessories

Built-up roofing

146
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<8> Installation for Type-S flashing

(3) Mounting copings Coping


●Mount copings to the position in which the flashing is
mounted.
(Do not mount any copings to the flashing ventilation For slit
portion.) roofing tile
(Leave a space of approx. 920 mm between copings.)
●Apply sealant to the edge of each coping. Roofing tile

920
●In case of slit roofing tiles, apply sealant to the slit.

g:
cin
spa
ing
Cop
Sealant

Ventilation Accessories Installation Instruction


(4) Mounting joint pieces Joint piece

●Mount a joint piece to the junction of the flashing and


ventilation flashing.

20
g: 9
cin
spa
ing
Cop

(5) Mounting the ventilation flashing Flashing


●Mount the ventilation flashing between joint pieces. Ventilation flashing Tapping screw
●Drill a preparation hole in the roofing tile in alignment with
the hole for screw in the ventilation flashing.
●Put an auxiliary sheet on the hole for screw, and then fix it
with a tapping screw.
(Remove the protective paper from the reverse side of the
auxiliary sheet, and then face the adhesive surface down.)

Auxiliary sheet

(6) Finishing
●Cut to remove auxiliary sheet sticking out of the collar of
the ventilation flashing.

Cut the auxiliary


sheet.

147
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<9> Installation for square ridge

Installing corner ridge using corner part


Tapping screw for fixing

■Layout diagram ■Overview of


Metallic (square)
installation ventilation ridge
685

270
Metallic Auxiliary sheet
(square) Permanent flashing (30×30)
ventilation
ridge
Corner part for
corner ridge
Rafter

Tapping screw
for fixing
545 Roofing tile
Auxiliary
Roofing tile sheet
Built-up roofing (50×50)
Sheathing Drill a preparation hole in the roofing tile.
Ventilation Accessories Installation Instruction

Installing corner ridge using ridge cover


Tapping screw for fixing
■Layout diagram
■Overview of Metallic (square)
ventilation ridge
685 installation

Metallic
270

(square)
ventilation
ridge Permanent flashing
(30×30)
Flashing (processed)
Tapping screw
for fixing Ridge cover
Auxiliary sheet
Auxiliary sheet
(50×50)
545
Roofing tile
Sealant
Roofing tile
Built-up roofing Drill a preparation hole.
Sheathing

Saw
■Installation procedure
Drill of approx. 10 mm
in diameter
Ventilation hole
Saw
Drill of approx. 10 mm
in diameter
(1) Making an opening in sheathing Ventilation hole

●As shown in the diagram on the right, mark a total of eight pieces of
545 545
triangles on the surfaces using a line that gives 545 mm as spacing of
the centers of corner ridges and a line inside the rafter and ridge beam. 545
545
●Make the holes of the triangles marked with a drill (of approx. 10 mm in
diameter) and a saw.
Built-up roofing
Mark a triangle on the surface using a line that gives
545 mm as spacing of the centers of corner ridges
Built-up roofing and a line inside the rafter and ridge beam.
Mark a triangle on the surface using a line that gives
545 mm as spacing of the centers of corner ridges
and a line inside the rafter and ridge beam.

(2) Mounting the permanent flashing 545 545


●Follow the standard installation instruction for roofing tiles to completely
lay built-up roofing, and thoroughly cut off built-up roofing at the holes in 545 545
545
the triangles with a cutter. 545
Permanent
●As shown in the diagram on the right, process the permanent flashing to Roofing Built-up roofing
545 flashing
545
545 mm in length and so as to overlap at the corner ridge, and then fix it nail Cutter
Permanent
with roofing nails. Roofing Built-up roofing flashing
●Be sure to apply sealant to the overlapped and folded portions of the nail Cutter

permanent flashing. Built-up roofing Sealant


●Completely install roofing tiles up to the permanent flashing.
Built-up roofing Sealant

148
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<9> Installation for square ridge

(3)-1 Mounting ventilation accessories and ventilation ridge Built-up roofing


Coping, 18×90 (preservative-treated)
Sealant to the header
to fit the corner ridge using a ridge cover
●Fix copings measuring 18 by 90 to the edge of the corner ridge and
permanent flashing following the standard installation instruction for roofing Sealant
tiles.
●Apply sealant to the headers of the copings, and then be sure to lay built-up
roofing on the headers. Built-up roofing

Be sure to hem and seam


Cut the standard flashing.
by approx. 10 mm.
●First, hem and seam the end of the ridge cover by approx. 10 mm as shown Hem and seam by
in the diagram on the right, and then fix it to the corner ridge following the approx. 10 mm

standard installation instruction.


●Next, cut and bend the raised piece of the flashing as shown in the diagram
on the right, and then fix it to the edge of the ridge following the standard

Ventilation Accessories Installation Instruction


installation instruction.
* Be sure to apply sealant to the overlapped portions. Nail for ventilation
accessories Sealant
Hem and seam

Tapping screw to fix


Ventilation ridge the ventilation ridge
●Drill a preparation hole in alignment with the hole for screw in the ventilation
ridge.
●Put an auxiliary sheet on the hole for screw, and then fix it with a tapping
screw used to fix the ventilation ridge.
* Remove the protective paper from the reverse side of the auxiliary sheet,
and then face the adhesive surface down. Drill a preparation hole.
●Cut to remove auxiliary sheet sticking out of the collar of the ventilation Auxiliary sheet
ridge.

Permanent flashing
(3)-2 Mounting ventilation accessories and ventilation ridge Decorative ridge
beam specification
to fit the corner ridge using a corner part
●Fix the corner part for the corner ridge following the standard installation
instruction for roofing tiles.

Tapping screw to fix


Ventilation ridge
●Drill a preparation hole in alignment with the hole for screw in the ventilation the ventilation ridge

ridge.
●Put an auxiliary sheet on the hole for screw, and then fix it with a tapping
screw used to fix the ventilation ridge.
* Remove the protective paper from the reverse side of the auxiliary sheet,
and then face the adhesive surface down. Drill a preparation hole.
●Cut to remove auxiliary sheet sticking out of the collar of the ventilation Auxiliary sheet
ridge.

149
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<10> Installation of (thin type) roof-surface ventilation accessory
(1) Allocating roof-surface ventilation accessory 50
●Install the roof-surface ventilation accessory in place of a piece of
182
roofing tile. Roof-surface ventilation accessory
Upper part
182
34
Lower part

Permanent flashing

26
30

220 Single-sided waterproof


adhesive tape

Roofing tile
Rafter
Ventilation Accessories Installation Instruction

●Allocate the roof-surface ventilation accessory by keeping it away 150


mm or more from the ridge and 455 mm or more from the verge and Fig. 1 Corner ridge
corner ridge as shown in Fig. 1.
Verge

455 or more 455 or more


150 or more

Roof-surface
(2) Making an opening in sheathing ventilation accessory
●To determine the position of an opening in sheathing, take as a
reference the top end of a roofing tile in a row located three rows
down from a row in which the roof-surface ventilation accessory is 455 or more 455 or more
installed.
●As shown in the diagram on the right, make an opening measuring
500 mm by 30 mm from the top end to the ridge side, taking a line of
220 mm as a reference.
Take the butt portion of the roofing 500
Position of opening
(3) M ounting permanent flashing and single-sided tile as the center of the opening.
250 250
waterproof adhesive tape
30

●P rocess the permanent flashing according to the opening in the


220

sheathing.
* Mount the permanent flashing with the side having a dew-proof material
facing the inside of the opening.
●M ount the processed permanent flashing with two roofing nails in Roofing tile
alignment with the opening.
●Affix the supplied single-sided waterproof adhesive tape around the
circumference in order of ①, ②, and ③.
●To affix the single-sided waterproof tape, slightly raise it along the
permanent flashing.

Dew-proof Position of opening Permanent flashing


material*
Put the upstream side Single-sided
on the accessory. waterproof
adhesive tape
Upstream side

Downstream side
Roofing tile
●Mount the permanent flashing by putting its upstream side on
the accessory.
CAUTION Not doing so may result in roof leaks.

150
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<10> Installation of (thin type) roof-surface ventilation accessory

(4) Installing roofing tiles on the permanent flashing Cut piece of roofing tile

●Cut the edges of roofing tiles in an L shape according to the opening in the
permanent flashing, and then fix the roofing tiles.
●Lay the cut pieces of the roofing tiles on the ridge side of the permanent
flashing to fill the cut portions.
Seala
nt
(5) Installing the roof-surface ventilation accessory
●As the installation position, draw a marking line on the ridge side following
a position 182 mm away from the end of roofing tiles on the permanent
flashing.
Permanent flashing
●Align the marking line with the alignment mark for the lower part of the
roof-surface ventilation accessory (see the diagram shown below), and
then temporarily place the lower part.
●Make preparation holes of 4 mm in diameter in alignment with the holes
used to fix the lower part temporarily placed.
* Be sure to remove the chips of roofing tiles. Not doing so may result in roof

Ventilation Accessories Installation Instruction


leaks.

Lower part

Lower part
Marking line

Alignment mark
Marking line 2
18

●Affix the supplied auxiliary sheet to the prepared hole.


Screw (of 35 mm in length)
●Fix the lower part using the supplied screws (of 35 mm in length) for fixing used to fix the lower part
the lower part.
Lower part
●Fix the upper part of the accessory to the lower part using the supplied
screws (of 16 mm in length) for fixing the upper part.

Prepared Auxiliary
hole sheet

(6) Installing roofing tiles Marking


●C ompletely install roofing tiles following the standard installation line
instruction.
●Use an eaves plate (starter strip) or a part fabricated by cutting a roofing
tile on the top of the roof-surface ventilation accessory on the ridge side.

Upper part
Screw (of 16 mm in length)
used to fix the upper part Eaves plate (starter strip)
or cut roofing tile itself

Roof-surface
ventilation accessory

Lower part 2
18

151
11.Ventilation Accessories Installation Instruction
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Ventilation Accessories Installation Instruction


<11> Installation of fire damper
■Layout diagram ■Overview of installation
Type-S metallic ventilation ridge Fire damper

Roofing tile
Fire damper

Roofing tile

(Layout for Type-S shed ridge)


Type-S metallic ventilation ridge used for shed ridge
Opening (in sheathing)
Fire damper
250
133 ~ 136

~2 Auxiliary sheet
53
Tapping piece for fixing
Ventilation Accessories Installation Instruction

30
20 COLORBEST
30

Asphalt Roofing 940


19

Waterproof sheathing: 12
19

Tapping screw for fixing

Adjustment coping
Substrate for gable
Decorative gable board (to be mounted afterward)

■Installation procedure
(1) Making an opening in sheathing
●Make an opening in the sheathing for the ventilation ridge to exhaust air. 60 (80 for Type-L350)

<Dimensions of opening>
Lengthwise: 830 mm
Widthwise: 60 mm (for Type-S and –L) Opening

80 mm (for Type-L350)
Sheathing
830

(2) Mounting fire damper


●Completely lay built-up roofing up to the center of the ridge. Built-up roofing (Roofing)
(Cut off built-up roofing at the opening.)
Fire damper
●Mount the fire damper in alignment with the opening in the sheathing.
(The permanent flashing supplied with the ventilation ridge needs not to
be mounted.)
●In order to mount several fire dampers in series, be sure to apply
sealant to the full width of the joints. ●T he rib may deform in case of a
slope of 6/10 or more. However, this
presents no problems.

(3) Installing roofing tiles (4) Mounting ventilation ridge and ridge cover
●Completely install roofing tiles up to the ridge. ●Mount ventilation ridges and ridge covers following the installation
procedure for individual ventilation ridges.
Roofing tile Ridge cover
Fire damper Metallic ventilation ridge (Type-S)

152
13. Installation Diagrams for Each Part
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Reference Installation Diagrams by Part


<1-1> Eaves edge <1-2> Eaves edge (for snowy regions)
Double-sided waterproof COLONIAL
10 COLONIAL adhesive tape Built-up roofing (subject to the standards for snowy regions)
5 Sheathing (Varies with the built-up Sheathing
Built-up roofing roofing specification) Eaves plate
Nail used to Roofing nail 10
fix accessories
Eaves plate 5 65
55 90 10
20
Rafter Rafter
Nail used to fix accessories
35

Eaves edge

45
flashing Eaves edge flashing
used in snowy regions
Lay built-up roofing by rolling
it up to the tip of the substrate.

Decorative fascia board Decorative fascia board

<2-1> Verge <2-2> Verge (Sealant)


Free ridge verge (left) 45SUS decorative nail or 35SUS screw Roofing nail
Verge flashing
Additional laying of built-up for free ridge Additional laying of
roofing (500 mm in width) Ranking beam, 18 (21) × 90 built-up roofing (W500 mm)
Nail used to fix the ranking beam
Ranking beam, 18 (21) × 45 COLONIAL
COLONIAL 123 ~ 133
Built-up roofing
Nail used to fix 90 Built-up roofing
70 Sheathing
Installation Diagrams for Each Part

the ranking beam Sheathing

67 ~ 77
Nail used to fix
accessories
60

45SUS decorative nail Permanent verge flashing for free ridge


15 or 35SUS screw
Rafter 15 Rafter
for free ridge

Nail used to
fix accessories
Decorative gable board
Decorative gable board

The figure in the parentheses is for the permanent verge flashing of 6.0 mm in The figure in the parentheses is for the permanent verge flashing of 6.0 mm in
thickness (for PREMIUM GLASSA and SUPERIOR II). thickness (for PREMIUM GLASSA and SUPERIOR II).

<3-1> Flat ridge <3-2> Flat ridge (steeply sloped)


Ridge cover for steeply-sloped ridge
Free ridge
45SUS decorative nail or 35SUS screw Built-up roofing*
for free ridge Coping, 18×90
133
Sealant Nail used to fix the coping
Nail used to fix accessories 60 *
COLONIAL 0 Nail used to fix accessories
K-B·L sheet Built-up roofing 13
Sealant
Sheathing
10 30 COLONIAL
5 Roofing nail 10 Built-up roofing
Adhesive Sheathing
19

Ledger strip, 18×45

Rafter

Ridge beam Rafter Ridge beam


* For slopes from 8/10 to 10/10, align the ledger strip with the center of the ridge.
* Not required when preservative-treated coping is used.

<3-3> Flat ridge (free ridge)


Free ridge

45SUS decorative nail or 35SUS screw


for free ridge 133
Sealant
60
Nail used to fix accessories *
K-B·L sheet COLONIAL
Built-up roofing
Sheathing
10
Roofing nail
5 Adhesive

Ledger strip, 18 (21)×45

Rafter
Ridge beam

* For slopes from 8/10 to 10/10, align the ledger strip with the center of the ridge.

The figure in the parentheses is for the permanent verge flashing of 6.0 mm in
thickness (for PREMIUM GLASSA and SUPERIOR II).

160
13. Installation Diagrams for Each Part
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Reference Installation Diagrams by Part


<4-1> Corner ridge (Ridge cover) <4-2> Corner ridge (Corner part for corner ridge)
Ridge cover
Built-up roofing*
Coping, 18×90 Corner part
Nail used to fix the coping Nail used to fix the corner part
Nail used to fix the accessories 70
104 COLONIAL
30 COLONIAL 40
Built-up roofing Built-up roofing
Sheathing Sheathing
19

Rafter Rafter
Ridge beam
Ridge beam

* Not required when preservative-treated coping is used.

<4-2> Corner ridge (free ridge)


Free ridge

45SUS decorative nail or 35SUS screw 123


~ 13
for free ridge 3
K-B·L sheet

Installation Diagrams for Each Part


COLONIAL
Built-up roofing
Sheathing

Ledger strip, 18×45

Nail used to fix the ledger strip


Rafter
Ridge beam

The figure in the parentheses is for the permanent verge flashing of 6.0 mm in
thickness (for PREMIUM GLASSA and SUPERIOR II).

<5> Wall joint (in the ridge direction) <6> Wall joint (in the roof slope direction)
Raise built-up roofing by 50 mm or Raise built-up roofing by 50 mm or
more from the top end of the flashing. more from the top end of the flashing. Permanent flashing
(Raise the built-up roofing itself by (Raise the built-up roofing itself by Nail used to fix the coping
Flashing
approx. 200 mm.) approx. 200 mm.) Flashing
Coping, 18×90
Coping, 18×90
Nail used to fix the accessories
10 ~ 15
70

100 Sealant Nail used to fix the accessories


30 Roofing nail 100 30 Sealant COLONIAL
70

10 ~ 15

COLONIAL Built-up roofing


70

Built-up roofing Sheathing


Sheathing
19

18

Nail used to fix the coping


20

10
5
10
50 79
Ledger strip, 18(21)×45
Rafter

<7> Valley The figure in the parentheses is for the permanent verge flashing of 6.0 mm in
thickness (for PREMIUM GLASSA and SUPERIOR II).

COLONIAL
Built-up roofing
Sheathing

60 60

Nail used to fix


the accessories
Rafter

161
13. Installation Diagrams for Each Part
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Reference Installation Diagrams by Part


<8-1> Shed ridge (for steeply-sloped shed ridge/Gable edge) <8-2> Shed ridge (for shed ridge/Gable edge)
Ridge cover for steeply-sloped ridge Built-up roofing* Ridge cover for steeply-sloped ridge
Coping, 18×90 Built-up roofing*
Coping, 18×90 Coping, 18×90 Coping, 18×45
130 Nail used to fix the coping
Sealant Coping, 18×90
246 Nail used to fix the coping
30 ~2 10
50 Nail used to fix
the accessories 5

130 ~ 133
Sealant
130

COLONIAL 30
Roofing nail Built-up roofing COLONIAL
19 Built-up roofing
Sheathing Sheathing

19
Roofing nail

30
10
Nail used to fix
30

Nail used to fix 5 19


19 the accessories
the accessories
Gable board
Gable board (to be mounted afterward)
Ridge beam Rafter Rafter
(to be mounted afterward) Ridge beam
* Not required when preservative-treated coping is used. * Not required when preservative-treated coping is used.

<9> Crest-bent ridge <10> Gambrel ridge


COLONIAL Double-sided waterproof COLONIAL 10
Built-up roofing adhesive tape Built-up roofing 10
Sheathing 6 3
Sheathing Roofing nail Gambrel flashing Eaves plate
Roofing nail Gambrel flashing
Eaves plate (to be locally procured)
Double-sided waterproof adhesive tape Gambrel flashing (to be locally procured)
Built-up roofing* 75
55 Coping, 18×45 Built-up roofing*
Installation Diagrams for Each Part

20 50 Coping, 18×90
Nail used to fix the coping
On-sit Nail used to fix the coping
90 Nail used to fix the accessories adjus e
tment Nail used to fix the accessories
Sealant COLONIAL
30 COLONIAL 30 Sealant Built-up roofing
Built-up roofing Sheathing
Purlin Sheathing Roofing nail

19
Roofing nail
Rafter
Rafter
Purlin

* Not required when preservative-treated coping is used.


* Not required when preservative-treated coping is used.

162
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Procedure for Using Single Cutter


<1> Specifications of single cutter Corner cutting tool Bridge of corner cutting tool Upper punch
Handle
Product Number KLKGD Front punch Horizontal table for drilling

Overall length × Overall height 1115 mm×440 mm


Overall width (when retracted) 260 mm (102 mm)
Upper frame
Maximum cutting dimension Main cutting tool: 970 mm
Corner cutting tool: 50 mm
Maximum cutting thickness 7.0 mm Lock pin

(for the front punch )


and adjustment pin
Drilling dimension Upper punch: φ3.5 mm
Front punch: φ4.0 mm Joint bolt
Joint bolt (front) Main cutting tool (rear)
Drilling position of front punch 28·40·50 mm Angle gauge

Weight (excluding tool) Approx. 22 kg Stand Tool box Lower frame

■Accessories
■Safety precautions Clearance gauge/spanner: M8 × M16 Hexagonal wrench key: 4 mm
Be sure to observe the following precautions in order to prevent
injuries and accidents. Cross-section of
the clearance gauge/spanner

2.0
●Check for any damage before using this cutter. Any
Procedure for Using Specialized Tools

mm
2.5

in th
mm
damage will cause the cutter to malfunction, resulting
3.0

ickn
in th
mm

ess

ickn
in th

in accidents or injuries. ess


ickn

●N EVER attempt to place your finger between the


ess

cutting blades. Handle the cutting blades with utmost ②

attention.
●NEVER attempt to touch the cutting blades.
●To use this cutter on the roof, securely fix it to prevent
it from slipping down from the roof.
●DO NOT leave the handle lifted.
●DO NOT put your hand on the upper punch when the
WARNING handle is lifted.
●This single cutter is a cutting machine dedicated to
cutting slates for flat roofs. DO NOT use it for any other
●C utting and processing with this cutter must be materials and applications.
performed by one person.
●DO NOT use this cutter in an unstable position. Doing
●D O NOT allow any child to touch this cutter. Pay so may cause you to fall from the roof, thus resulting in
utmost attention to the storage and installation CAUTION
injuries.
locations of this cutter.
●B e sure to thoroughly read the Instruction Manual
●Be sure to put the lock pin in place after using this before using this single cutter.
cutter in order to prevent the handle from being lifted.

●Safety measures
- Putting the lock pin in a given hole on the front punch side will disable the operation of the handle. Use this function as a safety measure
to transport or relocate this single cutter, or make adjustment of the main cutting blade.
- This single cutter is shipped from the plant with the lock pin set to “handle CLOSED.”
- To use this single cutter, remove the lock pin, and then put in in the holder located beside the front punch.

Lock pin (when the cutter is used)


Lock pin (when the cutter is shipped/ not used)

Set position of
Set position of
the lock pin
the lock pin

164
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Procedure for Using Single Cutter


<2> Procedure for using this single cutter
(1) Cutting
Cutting
●As shown in the diagram on the right, lift the handle, put COLORBEST in
the single cutter from the left side, place it horizontally on the lower
cutting blade, and then align the cutting line with the lower cutting
blade. Subsequently, give slight momentum to lower the handle at a
stretch to cut the COLORBEST.

Roofing tile

●To cut slates in valley or corner ridge, hold a portion needed (e.g. corner
portion), and then cut the portion by two cutting operation, i.e., rough Two cutting operation
and final cutting. Second cutting (Final cutting)
●Before cutting, ensure that no chips remain on each side of the cutting First cutting (Rough cutting)
blade. Portion needed
Do not use any improperly cut, broken, or damaged COLORBEST without

Procedure for Using Specialized Tools


fixing it.

50 ~ 100

(2) Notching Notching Notching


●To notch COLORBEST in a square shape, etc., use the corner cutting tool
located at the end of the cutter handle.
●Lift the handle to open the corner cutting tool. Put COLORBEST between
the upper and lower cutting blades, and then push the COLORBEST
forward while inching the handle to cut it. At this time, set the angle of
COLORBEST to be parallel with the blade receiver.

Roofing tile
Corner cutting blade

165
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Procedure for Using Single Cutter


<2> Procedure for using this single cutter
(3) Drilling Drilling
The upper punch (of approx. 3.5 mm in diameter) and the front punch (of
approx. 4 mm in diameter) are available to drill holes in roofing tiles.
Roofing tile
To drill a hole using the upper punch, lift the handle, put a roofing tile
Upper punch
horizontally on the female punch, and then lower the handle.
If the hole in the female punch is plugged with chips, no hole may be
drilled. Ensure beforehand that the hole is not plugged with chips. Front punch
If the roofing tile is difficult to be pulled out, carefully pull it out while
horizontally turning it.
To drill a hole using the front punch, lift the handle, put a roofing tile in a
clearance in the front punch, and then lower the handle.

<3> Daily check


Procedure for Using Specialized Tools

●In order to maintain the performance for long periods of time, be sure to carry out daily checks for the points listed in the table below before using this single
cutter.
Skipping the daily checks may cause this single cutter to malfunction, thus resulting in accidents or injuries.

(1) Check whether the clearance of cutting blades is proper.


(2) Check for any misalignment of the center of the upper and lower
cutting blades.
(3) Check for extreme wear of the blade edge.
Daily check points

(4) Check for any abnormal plays and backlashes.


(5) Check for lubricating conditions of rotating and sliding parts.
(6) Check whether the handle smoothly lifts and lowers.
(7) Check for clearance (1 mm) between the bottom end of the upper
punch and the die.
(8) Check for any damage if a trouble occurs during installation or
transportation.

166
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Procedure for Using Single Cutter


<4> Procedure for adjusting the clearance of the
upper and lower cutting blades on the main Adjustment of clearance between the cutting blades of this single cutter
cutting tool (Front side)
●“A” and “C” marks are provided in the places of the tap bolts that fix the A C
Upper cutting blade
upper frame (see the diagram shown on the right). The frame can easily
moves upward and downward by gradually turning the nuts of
connection bolts located ahead and behind the frame with the dedicated Lower cutting blade
2.0mm 2.5mm
clearance gauge/spanner supplied with this single cutter. Adjust
clearance between the cutting blades at the position of “A” and “C”
mark as shown in the diagram on the right.
●When the clearance reaches the given level, fasten the nut sequentially
from the center to each end of the frame, and then securely fasten it at
last.
●When the blade edges of the main cutting tool become badly worn and
no longer present sufficient cutting performance even after adjustment,
replace these blades with a new replacement blade kit.

Joint bolt
(front)

Clearance gauge/spanner

Procedure for Using Specialized Tools


<5> Maintenance parts Part Number Part Name Component Name
KLKGD01 Replacement cutting blade kit Main cutter
●For the adjustment of this single cutter and the replacement of the main KLKGD02 Corner cutting blade Corner cutting blade
cutting blades, refer to the Instruction Manual. KLKGD03 Front punch (male) Punch (F)
●The maintenance parts listed in the table on the right are available. Punch (F) body
●Please contact us for any parts not listed in the table. Die bushing
●The upper and lower frames are not replaceable. Liner (F punch)
* If it is difficult to make adjustment of this single cutter due to the damage Punch (F)
of parts, etc., please contact the supplier of your single cutter. (We sell Spring for F punch
KLKGD04 Front punch kit
some parts and repair simple faults of them with charge.) Hexagon socket head bolt, M5×12L
Hexagon socket head bolt, M5×25L
Gauge pin
Hanging line, L150
Split pin, φ2.5×14L
KLKGD05 Upper punch (male) Punch (U)
Die body
KLKGD06 Upper punch (female)
Die bushing
Angle gauge
Hexagon socket head set screw, M8×30L
KLKGD07 Angle gauge kit
Wing nut with plain washer, M8
Angle gauge fixing lever
●NEVER make any repairs or modifications of this KLKGD08 Stand Stand
single cutter except the replacement of the KLKGD09 Handle Handle
cutting blades. Gauge pin
D oing so will cause this single cut ter to KLKGD10 Lock pin kit Hanging line, L150
Split pin, φ2.5×14L
malfunction, thus resulting in accidents or
KLKGD11 Bridge of corner cutting tool Bridge
injuries. Clearance gauge/spanner
KLKGD12 Clearance gauge/spanner
Precautions for replacement of the main cutting Label for spanner
blades:
WARNING
Fall prevention arm
●Be sure to turn this single cutter itself on its side. KLKGD13 Fall prevention arm kit
Hexagon socket head set screw, M8×30L
Wing nut with plain washer, M8
●Disassemble the upper and lower cutting blades Fall prevention arm fixing lever
before the replacement. Joint bolt (F)
KLKGD14 Joint bolt kit (front)
Inobservance of these precautions will result in Hexagon socket pan head machine screw, M4×16L, 1.5p
accidents or injuries. Joint bolt (R)
KLKGD15 Joint bolt kit (rear)
Hexagon socket pan head machine screw, M4×16L, 1.5p
Rubber cover for stand
KLKGD16 Rubber cover kit for stand Nut with claw, H-4-8
Cross recessed head machine screw, M4×16L
KLKGD31 E ring Type-E stop ring for shaft, 10
KLKGD32 Pin, 43 mm long Pin3
KLKGD33 Pin, 52 mm long Pin4
KLKGD34 Pin, 60 mm long Pin1
KLKGD35 Pin, 100 mm long Pin2

167
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Procedure for Using Slater’s Nail Cutting Saw


<1> Name and specification of each part
Part Name Appearance / Specification / Number contained

Straight shank
handle Specification: Equipped with
aluminum core / Made of resin Number contained: 1 piece

Center part of
extension plate
Specification: Made of special steel /
Equipped with back piece Number contained: 1 piece

Replacement
cutting blade
Specification: Made of special steel /
PAIMAN
Hard impulse processed Number contained: 2 pieces

Assembly drawing
Procedure for Using Specialized Tools

<2> Procedure for assembling and disassembling the slater’s nail cutting saw
(1) Procedure for assembling Fig. 1 Inserting in the back piece Insert in the clearance.
- First, hang the extension plate and replacement cutting blade on the
Extension
latch of the back piece to push them in the direction of an arrow, and plate
then temporarily fix them (see Fig. 1, 2, and 3).
- After temporarily fix the extension plate and replacement cutting blade,
lightly hit the extension plate to finally fix it as shown in the figure. At this
time, protect the portion that you hold with your hand with a towel to Repl.
blade
prevent you from getting injured (see Fig. 4).
- Mount the straight shank following the same procedure as described
Fig. 2 Mounting to the back piece
Turn
above (see Fig. 5).
Extension
plate

(2) Procedure for disassembling Repl.


- Follow the assembling procedure in reverse. Lightly hit the extension blade
plate to disassemble it from the saw (see Fig. 6). Fig. 3 Temporarily fixing to the back piece Turn
When disassembling the extension plate, it may spring back to hit
against your hand. Disassemble the extension plate with careful
Extension
attention. plate Repl.
blade

Fig. 4 Fixing
Lightly hit.

Protect your hand with a towel.

Fig. 5 Fixing Fig. 6 Disassembling


Lightly hit.

Lightly hit.

168
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

2. Procedure for Using Slater’s Nail Cutting Saw


<3> Replacement of roofing tile in general portions using the slater’s nail cutting saw
Procedure for dismounting damaged roofing tile Fig. 7 Inserting in the roofing tile
●Dismount a damaged roofing tile by cutting the roofing nails that fix the
damaged roofing tile with the slater’s nail cutting saw. Damaged roofing tile
●Put the cutting blade of the slater’s nail cutting saw up to the position of
the roofing nail through the back of the damaged roofing tile (see Fig. 7
and 8). (At this time, using the slater’s ripper in combination facilitates
putting the cutting blade.)
●Hold the straight shank portion to cut the roofing nail in a manner to use
a saw (see Fig. 8).
●Cut all roofing nails that fix the damaged roofing tile, and then pull out
Damaged roofing tile
and eliminate the roofing tile. The heads of the roofing nails will be
separated with the roofing tile and the stems of the roofing nails will
remain in the sheathing (see Fig. 9). (Using the slater’s ripper in
combination will facilitate eliminating the roofing tile.)

Insert the slater’s


nail cutting saw.
Slater’s ripper
(Useful to make clearance between roofing tiles)

Procedure for Using Specialized Tools


Fig. 8 Inserting the nail cutting saw in the roofing tile Enlarged Fig. 9 Image of cut roofing nail
cross-section

Cutting blade of the slater’s Enlarged


nail cutting saw cross-section
Damaged roofing tile

Damaged roofing tile

Cut roofing nail in the roofing tile


Cut the roofing
tile in a manner Roofing nail in
to use a saw the damaged
roofing tile

Fig. 10 Applying adhesive


Repair of damaged roofing tile
●Fix a new roofing tile with adhesive. Put thick dots of adhesive to the
nail heads that come underneath the new roofing tile (see Fig. 10).
●Apply sealant to the back of the hole for nail in the new roofing tile, and
then insert this roofing tile (see Fig. 11). (To insert the new roofing tile,
use the slater’s ripper in combination and make the slater’s ripper serve
as a guide plate.)

Replacement of cutting blade Apply adhesive.


●When the cutting blade presents poor cutting performance, replace it
with a new one. Replacement cutting blades are available in do-it- Fig. 11 Inserting a new roofing tile
yourself stores.

●When using the slater’s nail cutting saw, pay


careful attention not to have your hand slip.
WARNING A slip will cause you to fall or get injured.

●When inserting the slater’s nail cutting saw


Insert the roofing tile using the slater’s
between roofing tiles to use it, DO NOT lift ripper as a guide plate.
the saw.
Doing so may crack the roofing tiles.
●W hen pulling out the slater’s nail cutting
Replacement cutting blade:
CAUTION saw, pay careful attention not to damage Z-Saw PAIMAN replacement cutting blade (Part Number: 08012)
built-up roofing. Okada Hardware Mfg. Co., Ltd.
●D
 amaged built-up roofing may result in roof 561, Omura, Miki City, Hyogo Prefecture 673-0404, Japan
leaks. Tel: +81-794-83-1111

169
14. Procedure for Using Specialized Tools
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

3. Procedure for Using Slater’s Ripper


<1> Replacement of roofing tile in general portions using the slater’s ripper
●Use the slater’s ripper to replace damaged roofing tile.
●Insert the slater’s ripper underneath a damaged roofing
tile, and then push up the nail that fixes the roofing tile
several times with the head of the ripper to make the
Roofing tile
nail loose.

Push by hand
or hammer
Slater’s ripper
Procedure for Using Specialized Tools

●Now, insert the slater’s ripper in the upper side of the


damaged roofing tile, and then hook the head of loose
nail with the neck of the ripper to pull it out.
●Pull out all the nails fixing the damaged roofing tile.
Roofing tile
●Pull out the damaged roofing tile.

Hammer or pull
by hand

Slater’s ripper

●As shown in the diagram on the right, apply adhesive to


the vicinity of the nail head of a roofing tile that comes
underneath the portion in which the slater’s ripper is
inserted. Apply sealant to the back of the hole for nail in
the new roofing tile, and then insert this roofing tile.

●When using the slater’s ripper, pay


Roofing tile Insert the roofing tile using the slater’s
careful attention not to have your
ripper as a guide plate.
hand slip.
WARNING A slip will cause you to fall or get injured.

●When inserting the slater’s ripper


between roofing tiles to use it, DO
NOT lift the ripper.
Doing so may crack the roofing tiles.
●When pulling out the slater’s ripper,
CAUTION pay careful attention not to damage Apply adhesive
(to the head of nail that fixes
built-up roofing.
a roofing tile located underneath).
●D amaged built-up roofing may result in
roof leaks.

170
15. Procedure for Using Touch-up Paint
GLASSA
COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

1. Procedure for Using Touch-up Paint


<1> Touch-up paint
●Be noted that touch-up paint for the GLASSA Series is different from that for the QUAD Series.
●Touch-up paint dedicated to COLORBEST is designed to touch up partial stains and minor scratches (designed for local touch-
up). DO NOT use this paint to touch up stains, etc. in wide areas. (Doing so may result in uneven color or brightness.)
CAUTION ●Using thinner or hydrochloric acid to remove paint or mortal from the surface of COLORBEST may result in discoloration.
NEVER use it for such purpose.

To handle the paint, follow the MSDS submitted by KMEW.

(1) Touch-up paint for the GLASSA Series


Procedure for use
1) Cleaning and drying an area to be touched up
Thoroughly remove stains and dust from the coating surface.
Before painting, ensure that the coating surface gets thoroughly dry. Cur Cur
2) Mixing paint age ing age ing
nt A nt B
After thoroughly agitating the base resin, put a bottle of curing agent
A in a pail of paint, and then lightly agitate them with an agitating rod.
Subsequently, put a bottle of curing agent B in the said pail, and then
thoroughly agitate until they become homogeneous.
Use the paint within a period of eight hours after it is mixed.
Base resin
3) Painting
Use the supplied brush to apply the paint without dripping.

Procedure for Using Touch-up Paint


Use the paint only to touch up scratches. Prevent the painting area
from becoming larger. Continue agitating for a period of approx. two minutes
after mixing the curing agents A and B.

●Be sure to use touch-up paint for the GLASSA Series by mixing the base resin with the curing agents A and B.
Failure to mix with the curing agents will interfere with the curing of the coated film. (Pay careful attention not to fail to mix with them.)
●Since there are some restrictions on touch-up paint for the GLASSA Series including usable life, touch-up painting should be
completed within the day in principle.
Once the paint pail has been opened or the paint has been mixed, it cannot be used at a later date.

CAUTION ●Avoid coating at temperatures below 5ºC. DO NOT expose the coated roof tiles to rainwater within a period of two hours after
coating.
●If it is difficult to apply the paint due to high temperatures or high roof surface temperatures during summertime, slightly
dilute it with water to use it.
●Store the paint indoors without high temperatures.
(2) Touch-up paint for the QUAD Series (Spot Color)
Procedure for use
1) To apply the paint, mask the portions that need not to be applied in advance with masking paper (e.g. polyethylene sheet) and masking tape.
2) Drying time slightly varies with weather conditions and materials to use.
3) Remove dust, oil, rust, mold, and wax from the coating surface.
4) To use the paint, thoroughly shake the paint container to agitate the contents.
5) To spray the paint, provide a 20- to 30-cm space between the coating surface and the spray nozzle.
6) Do not thickly apply the paint at a time. While moving in parallel to the coating surface, apply a slightly thin coating of paint evenly two or three times at
intervals of 10 to 15 minutes on a wet-on-wet basis.
7) After completion of coating, turn the container upside down, and then blow for a period of approx. two seconds to prevent the spray nozzle from
clogging. Thoroughly wipe the spray nozzle, and then out a lid on it.
8) The drying time is approx. 30 minutes, but it slightly varies with weather conditions.
9) DO NOT use the paint for any purpose than the original purpose.

(3) Touch-up paint for metallic accessories and ventilation ridges for the GLASSA Series
Procedure for use
1) Cleaning and drying an area to be touched up
Thoroughly remove stains and dust from the coating surface. Before painting, ensure that the surface is thoroughly dry.
2) Coating of paint
Use the supplied brush to apply the paint without dripping. Use the paint only to touch up scratches. Prevent the painting area from becoming larger.

171
GLASSA

16. Repair & Maintenance


COLONIA SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

4. Repair & Maintenance Procedure


<1> Repair of roofing tile in general portions by adhesion
(1) Repair of minor breakage with broken
piece: Roofing tile
●Attach the broken piece with adhesive, and then apply
sealant to portions that come into contact with the
existing roofing tiles.

Adhesive: Roof Keeper (One-component modified


silicone-based adhesive)

Sealant
Attach the broken piece with adhesive. (same color as the roofing tile)

Roofing tile

Sealant (same color as the roofing tile)

Repair & Maintenance


Attach the broken piece with adhesive.

(2) Repair of minor breakage without broken


pieces: Roofing tile
* Besides the procedure described below, the breakage
can also be repaired by cutting a roofing tile to the same
shape as that of missing broken pieces and then
following the method (1) above.
●Cut the broken roofing tile up to the position of a roofing
tile located in one row up.

Cut up to this portion

●Fabricate a roofing tile of the same dimensions as those


of the broken portion, and then attach it with adhesive. Roofing tile
●Fill sealant in a portion that comes into contact with the
existing roofing tile.

Fill sealant (same color as the roofing tile).


Attach the broken piece with adhesive.

175
GLASSA

16. Repair & Maintenance


COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 × 〇 × 〇

4. Repair & Maintenance Procedure


<2> Replacement of roofing tile in wall joint
(1) In case of slitless roofing tile:
If a slitless roofing tile is broken in a wall joint (on the ridge Flashing
side), the broken roofing tile cannot be pulled out with the
slater’s ripper or the slater’s nail cutting saw because the Roofing tile
roofing tile is held by the flashing.

If this portion is broken

1) If the roofing tile is broken near the flashing, cut it along
the line of the position of a roofing tile located in the Flashing
uppermost row.
Roofing tile
Repair & Maintenance

Cut along this line (the flashing).

2) Fabricate a roofing tile of the same dimensions as those


Fabricate a roofing tile
of the broken portion, and then put thick dots of in the same shape. Flashing
adhesive to a flat portion of the roofing tile.

Adhesive: Roof Keeper (One-component modified Roofing tile


silicone-based adhesive)

Apply adhesive.

3) F ix the roofing tile fabricated in Step 2) above. Fill


sealant in a portion that comes into contact with the Flashing
roofing tile located in the uppermost row.
Roofing tile

Fill sealant (same color as the roofing tile)

176
GLASSA

16. Repair & Maintenance


COLONIAL SAVORY SUPERIOR II RAYCIOUS PROUD
600
× × 〇 × 〇 ×

4. Repair & Maintenance Procedure


<2> Replacement of roofing tile in wall joint
(2) In case of slit roofing tile
If a slit roofing tile is broken in a wall joint (on the ridge Flashing
side), the broken roofing tile cannot be pulled out with the Roofing tile in
slater’s ripper or the slater’s nail cutting saw because the the uppermost row Roofing tile
roofing tile is held by the flashing. (The diagram on the
right shows as case where SUPERIOR II is used.)

If this portion is broken

1) If the roofing tile is broken near the flashing, cut it along
the line of the position of a plate material located in the
uppermost row. Flashing
Roofing tile in
the uppermost row Roofing tile
* The breakage can also be repaired by cutting a roofing
tile to the same shape as that of missing broken piece,
attaching the cut piece with adhesive, and then filling

Repair & Maintenance


sealant in a portion that comes into contact with the
existing roofing tile. (See information on page 175)
Cut along this line
(of the uppermost plate material).

2) F abricate a small piece of roofing tile of the same


dimensions of the cut portion (broken portion), and then Flashing
apply adhesive to the flat portion. Fabricate a roofing tile
in the same shape.
Roofing tile
Adhesive: Roof Keeper (One-component modified
silicone-based adhesive)

Apply adhesive.

3) Fix the small piece of the roofing tile. Fill sealant in a


portion that comes into contact with the roofing tile
Flashing
located in the uppermost row.
Roofing tile in
the uppermost row Roofing tile

Fill sealant
(same color as the roofing tile).

177
GLASSA

16. Repair & Maintenance


COLONIA SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

4. Repair & Maintenance Procedure


<3> Repair of hairline crack in surface by adhesion
(1) In case of a slight hairline crack in the
surface of a roofing tile, repair it with
adhesive.
Hairline crack
Adhesive: Roof Keeper (One-component modified
silicone-based adhesive)

1) To repair a longitudinal hairline crack:


Fill adhesive (Roof Keeper) in one place each on the right
and left sides of the hairline crack.

Hairline crack
Repair & Maintenance

Fill adhesive in the back of a roofing tile


with a hairline crack.

2) To repair a lateral hairline crack:


Fill adhesive (Roof Keeper) in a portion underneath the
hairline crack.

Hairline crack

Fill adhesive in the back of a roofing tile


with a hairline crack.

3) Repair a hairline crack in a valley or corner ridge:


Since there is a substantial clearance on the back of a
roofing tile around accessories, fill some extra adhesive
(Roof Keeper) in the said portion.
Hairline crack

Fill adhesive in the back of a roofing tile


with a hairline crack.

178
GLASSA

16. Repair & Maintenance


COLONIA SAVORY SUPERIOR II RAYCIOUS PROUD
600
〇 〇 〇 〇 〇 〇

4. Repair & Maintenance Procedure


<4> Repainting procedure
Buildings need to provide long-term durability. In order to maintain the roof functions and beauty of buildings over a long period of time, it is essential not only to
observe the building construction standards, but also to implement thorough maintenance management and work to enhance the durability.
Leaving buildings without appropriate maintenance will result in shorter life of the roofs and also of the buildings themselves.
(For maintenance, please consult with specialized contractors.)

<COLORBEST>
□Repainting
●The purpose of repainting is to maintain and enhance the beauty of building.
●Not applying repainting will have no adverse influence on the physical properties and waterproofness of base materials used in COLORBEST.
●For repainting, use “Refresh Coat PS” paint dedicated to COLORBEST.
●Applying improper paint (or repainting procedure) will result in roof leaks. Commercially available paint other than the dedicated paint presents problems with
adhesion with roofing tiles and may consequently causes chalking, etc. NEVER attempt to use any commercially available paint.

●KMEW is not responsible for any problems arising from the use of any paint other than Refresh Coat PS, such as chalking or
peeling of coated film.
CAUTION ●Refresh Coat PS is not applicable to the GLASSA Series.

<5> Other repair procedures

Repair & Maintenance


<Accessories made of prepainted steel sheet>
●Repaint accessories made of prepainted steel sheet when coated film on their surface commences chalking or peeling.
●Continual use of rusty metallic accessories will promote corrosion to make holes in them, thus resulting in roof leaks.
●If rust is generated in a metallic accessory, remove the rust to repaint it or replace it with a new metallic accessory.

<Nails that fix accessories>


●If any nail that fixes a ridge or other accessory comes off, this will result in the dispersion of a ridge cover, etc. To avoid that, replace or refasten nails that fix the
accessories.

<Wooden accessories, including copings>


●Rotting wooden accessories used in ridges, including copings, will cause them to disperse in typhoons or in strong winds.
●To repaint metallic accessories on the roof, check for any rotting wooden accessories including copings.
●If any rotting wooden accessory is found, replace it with a new one.

179