Civil Finishes Checklist
Civil Finishes Checklist
Consultant Date
Vendor
Package Civil Finishes
Description of Work Masonry work
Wing Dwg.Ref.No Rev Inspection Request
Floor By Time
Details :
Location
Sl. No Description YES NO NA Remarks
MEP CLEARANCES
Have all the electrical conduit drops cleared or marked in the
1
beams and GI wires placed in conduits .
Vendor CBRE CLIENT
Observations if any :
CBRE
Contractor Civil Contractor Quality Contractor Safety CBRE Safety Client Representative
Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-015/Rev01/Oct2013
Page 1 of 12
Checklist for UPVC Door & Window Fixing
Consultant Date
Vendor
Package Civil Finishes
Description of Work UPVC Door & Window Fixing
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Before Installation
Is the latest updated "Good For Construction"
1
drawing available ?
2 Method statement submitted
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-016/Rev01/Oct2013
Page 2 of 12
Checklist for Flooring
Consultant Date
Vendor
Package Civil Finishes
Description of Work Marble/tile flooring
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
BEFORE LAYING
Is the latest updated "Good For Construction" drawing and
1
approved pattern of laying available for reference ?
2 Method statement submitted
Check the cleanliness of the base surface and if the loose mortar
3
with debris has been removed from the work area.
Check the level of the base surface and presence of any
4
irregularities
5 Check for completion of preceding activities of MEP works
6 Is the approved sample of marble/tile available for reference
7 Check the bench mark levels on all the walls
8 Are the slopes finalized and mentioned in the GFC drawing
DURING LAYING
Check for Cement Mortar mix proportion. Is it as per the
1
specification
2 Check for following during laying of marbles:
a) Laying over the mortar bed with cement slurry
b) Pattern of laying
c) Slope to be provided as per drg.
d) True level surface
e) Matching of joints
marble/tiles around doors, sanitary fittings, columns
f)
partitions
g) Finishing of edges for cut tiles/marbles
AFTER LAYING
1 Joints have been cleaned properly
2 Check for filling of joints with white cement
Observations if any :
Contractor CBRE
Contractor Civil Contractor Safety CBRE Safety Client Representative
Quality Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-017/Rev01/Oct2013
Page 3 of 12
Checklist for Wooden Flooring
Consultant Date
Vendor
Package Civil Finishes
Description of Work wooden flooring
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Before installation
Observations if any :
CBRE
Contractor Civil Contractor Quality Contractor Safety CBRE Safety Client Representative
Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-018/Rev01/Oct2013
Page 4 of 12
Checklist for DADO
Consultant Date
Vendor
Package Civil Finishes
Description of Work Dado
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Before Dadoing and skirting
Is the latest updated "Good For Construction" drawing
1
available
2 Method statement submitted
3 Check for provision of service conduits,junction boxes etc.
4 Is the approved sample of tiles available for reference
5 Are the tiles kept in water for atleast 1 hr before use
During Daddoing and skirting
1 Cement mortar mix proportion is as per the specification
2 Check if the thickness of Plaster bed for dado is as specified
Check for following during fixing of tiles:
3 Pattern of Laying,
Coat of Cement slurry for fixing,
4 True level of surface and plumb.
Matching of tile Joints,Finishing of tile joints & Finishing of
5
edges for cut tiles.Right angles.
Tiling around electrical and sanitary fittings,doors and windows
6
etc.
After Dadoing and skirting
1 Check if the tile Joints have been cleaned
Check if the flush pointing of tile joints with white cement has
2
been completed.
3 Has the Curing of tiling been completed for specified period
Observations if any :
Contractor CBRE
Contractor Civil Contractor Safety CBRE Safety Client Representative
Quality Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-019/Rev01/Oct2013
Page 5 of 12
Checklist for Putty and Primer Application
Observations if any :
Contractor CBRE
Contractor Civil Contractor Safety CBRE Safety Client Representative
Quality Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-020/Rev01/Oct2013
Page 6 of 12
Checklist for Painting
Consultant Date
Vendor
Package Civil finishes
Description of Work Application of 1st & 2nd coat paint
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Is there any damage to the putty applied surface and if yes, has
5
the same been repaired prior to paint application
Check that all edges and other surfaces are cleaned and also the
8
scaffolds are all removed.
Has the floor, doors, windows and other areas been cleaned
9
after application of paint
Observations if any :
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Page 7 of 12
Checklist for Water Proofing
Consultant Date
Vendor
Package Civil finishes
Description of Work Water proofing
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Check for completion of preceding activities
1 Method statement submitted
Is the Approved manufacturer's Technical specification
2
available for reference ?
3 Check if the MEP works are completed
A. Electrical Conduits
B. Sanitation lines, water lines
C. A.C.Water vent
D. Bore Packing using GP2 Chemical
Debris, dead mortar, slurry, etc. are removed and the
4
surface is cleaned for free of dust
Tie rods are removed from retaining wall and holes are
5
plucked as per technical specification
6 Surface defects are rectified properly
7 Has the seepage drain been provided
8 Have plaster beeds been provided in all corners
Has clearance from plumbing contractor been obtained
9 as a confirmation of the completion of all the plumbing
works
If pressure grouting is required as per technical
10
specification, then Whether the same has been done
Has the leakage location been marked at bottom of the
11
slab
Has the leakage been rectified as per the approved
12
procedure
Has the testing procedure been conducted for leakage
13
after rectification is completed
Is first layer of waterproofing applied and cured as per
14
the manufacturer's instructions
Is 2nd coat of waterproofing applied and cured as per the
15
manufacturer's instructions
16 Is protective layer applied as per the specifications.
17 Was ponding done for 72 hrs. ?
Observations if any :
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-022/Rev01/Oct2013
Page 8 of 12
Checklist for Suspended False Ceiling
Consultant Date
Vendor
Package Civil finishes
Description of Work Suspended false ceiling
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Before Installation
1 Has the method statement been approved
Check for completion of plastering of walls and the above ceiling
2
services works
A. Electrical
B. HVAC
C. Sprinkler
D. Fire Alarm
E. Public Address
F. Access Control & CCTV
G. Light Fixture Supports (if any)
3 Is the approved drawings available for reference.
Check the availability of approved material. Whether the mock up for
4
suspended ceiling has been executed.
During Installation
9 Check the provision for fixing of A/C grills & electrical fittings.
Observations if any :
CBRE
Contractor Civil Contractor Quality Contractor Safety CBRE Safety Client Representative
Representative
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-023/Rev01/Oct2013
Page 9 of 12
Checklist for Internal Plastering
Consultant Date
Vendor
Package Civil finishes
Description of Work INTERNAL PLASTERING -- CEILING/WALL
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
MEP CLEARANCES
Has the packing for the Electrical conduits and boxes fixed in wall
3 using thermocol, cement mortar, mesh works been completed as per
check list. Has it been accepted & signed by all concerned.
Has the PHE piping works in toilets and kitchen been completed as
4
per check list. Has it been accepted & signed by all concerned.
Has the A/C drain piping works been completed as per check list. Has
5
it been accepted & signed by all concerned
Vendor CBRE Client
8 Check for bull marks and record the average thickness of plaster
Check if true level surface, right angle, plumb, room dimension &
9
straight edge are available before commencing to plaster the surface
Check if architectural features such as Groove, Band etc. are being
10 provided as specified while plastering. (Both supervisor and the
mason to be made aware of the same)
Post plastering YES NO NA
Check if a true level surface has
Check for trueness of plastered surface and record the variance if
1 been achieved after Plastering and
any
record the variation .
Check to ensure that the straightness of edges, right angels and
2
plumb have been achieved
Signature
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-024/Rev01/Oct2013
Page 10 of 12
Checklist for External Plastering
5 Check if the Masonry & RCC surfaces have been washed and cleaned
Check if the scaffolding is safe and suitable for executing the said
6
works.
Check if Chicken mesh is provided at the junctions of RCC & Block work,
8
and over electrical conduit.
9 Check if the tie rods have been closed
10 Check for bull marks and record the average thickness of plaster
12 Check if the openings have all been provided with approved templates
5 Check the scratches been made over first coat of the plaster
Final coat
6 Check for the curing arrangements of First coat.
7 Check for mortar mix proportion
Observations if any :
Name
Date
Time
Distribution Original : CBRE - QS cc : Vendor
Format No. F021-QC-Ch-025/Rev01/Oct2013
Page 11 of 12
Checklist for Vaccum Dewater Flooring (VDF)
Consultant Date
Vendor
Package Civil finishes
Description of Work VACCUM DEWATER FLOORING
Wing Dwg.Ref.No Rev Inspection Request
Floor Inspected by By Time
Details :
Location
Sl. No Description YES NO NA Remarks
Prior Concreting
1 Has the method statement been approved
2 Check the Cleanliness of the area
3 Check for alignment, level and rigidity of the ISMC
Observations if any :
Page 12 of 12