0% found this document useful (0 votes)
6 views3 pages

DG Vrov4 Schedule 1748004556552

The Vehicle Delivery Order outlines the details of a claim for a Suzuki Access vehicle, including the owner's information, claim number, and estimated repair costs totaling ₹5272. The document specifies parts to be replaced and repaired, along with associated labor costs, and notes that any additional expenses must be covered by the insured. Final liability for the insurer is set at ₹3217.8, with instructions for further communication and approval processes.

Uploaded by

reddyapdsc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views3 pages

DG Vrov4 Schedule 1748004556552

The Vehicle Delivery Order outlines the details of a claim for a Suzuki Access vehicle, including the owner's information, claim number, and estimated repair costs totaling ₹5272. The document specifies parts to be replaced and repaired, along with associated labor costs, and notes that any additional expenses must be covered by the insured. Final liability for the insurer is set at ₹3217.8, with instructions for further communication and approval processes.

Uploaded by

reddyapdsc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Vehicle Delivery Order (VDO) Printed:23-May-2025

Policy Number:D161495692 | Claim Number:202500626426

VRO Date 2025-May-23

MUDUMPATI REDDY
Name of Owner: Engine No.: AF217568642 Workshop Name: TIRUPATI VOC 2W
SEKHAR

Registration No.: AP40K5540 Surveyor Name: Workshop Gst Number: 37AAEFW6567E1ZT

Date of Reg.: 03-Aug-2023 Claim coordinator: Ganesh Bathina Date of Accident: 19-May-2025

Vehicle Make & Model: SUZUKI ACCESS Chassis No: MB8DP12PGP8319218 Vehicle Age(Years) : 1.0

Payment to: Insured

Please find the below tentative estimation for the subject vehicle as per the visible damages found on the vehicle. Any further replacement / repair of part required during
the course of repair shall be verified and included in the estimation.
We request you to take prior approval from the insurer for all kept open part approval, if any. Please find the below tentative preliminary assessment for the subject
vehicle. Any further replacement / repair of part required during the course of repair shall be verified and included in the assessment subject to admissibility of the claim.
We request you to take prior approval from the insurer for all parts put on hold and are pending for approval.

Important Notes:
After completion of repairs,you shall submit the vehicle for reinspection and also produce the salvage of parts replaced.
Please have the final tax invoice raised in favour of Go Digit Insurance Limited up to the Insurer liability and remaining balance be invoiced in favour of the
Insured.

For any further clarification(s) regarding your claim, please feel free to reach out to Ganesh Bathina at 8087566641 or [email protected],
you can reach out to our WhatsApp Chatbot @ 70260-61234, or mail us at [email protected]
PARTS

REPAIR
TAXABLE TAX TAX TOTAL DEP. DEP R&R PAINTING
S.NO JOB MATERIAL DESCRIPTION HSN QTY. RATE CHARGES
AMOUNT (%) AMOUNT AMOUNT (%) AMOUNT CHARGES CHARGES

SHIELD, LEG
1 Replace Metal 87141090 1.0 742.0 742.0 0.0 0.0 742.0 10.0 74.2 100.0 0.0 0.0
FRONT, RH

SHIELD, LEG RR
2 Replace Plastic 8714 1.0 510.0 510.0 0.0 0.0 510.0 50.0 255.0 100.0 0.0 0.0
SIDE RH

SHILED LEG
3 Replace Plastic 87141090 1.0 1483.0 1483.0 0.0 0.0 1483.0 50.0 741.5 100.0 0.0 0.0
FRONT

LAMP ASSY
4 Replace Plastic FRONT LH 8708 1.0 1169.0 1169.0 0.0 0.0 1169.0 50.0 584.5 90.0 0.0 0.0
TURNSIGNAL

COVER,HANDLE
5 Replace Plastic 8714 1.0 503.0 503.0 0.0 0.0 503.0 50.0 251.5 80.0 0.0 0.0
FRONT UPPER

6 Replace Plastic EMBLEM S 8714 1.0 95.0 95.0 0.0 0.0 95.0 50.0 47.5 0.0 0.0 0.0

fork setting
7 Repair Plastic 0 0.0 0.0 0.0 0.0 0.0 0.0 50.0 0.0 0.0 300.0 0.0
charges

Sub Total ₹ 4502.0 ₹ 0.0 ₹ 4502.0 ₹ 1954.2 ₹ 470.0 ₹ 300.0 ₹ 0.0

LABOUR TYPE TAXABLE AMOUNT TAX AMOUNT TOTAL AMOUNT DEP AMOUNT

Remove & Refittng ₹ 470.0 ₹ 0.0 ₹ 470.0 ₹ 0.0

Repair ₹ 300.0 ₹ 0.0 ₹ 300.0 ₹ 0.0

Paint Material ₹ 0.0 ₹ 0.0 ₹ 0.0 ₹ 0.0

Paint Labour ₹ 0.0 ₹ 0.0 ₹ 0.0 ₹ 0.0

Total ₹ 770.0
FINAL CALCULATION AMOUNT (₹)

Total Liability ₹ 5272.0

Compulsary Deductible ₹ 100.0

Voluntary Deductible ₹ 0.0

Salvage Deductions ₹ 0.0

Non Standard Amount ₹ 0.0

Towing Amount ₹ 0.0

Digit Liability ₹ 3217.8

ASSESSMENT NOTES

1. Any additional amount over and above the approved assessment, shall be borne by the Insured.

The final liability has been arrived as full and final settlement after consent from the Insured. Do get back to us within the next 24 hours for any queries or
2.
clarification(s).

You might also like