NEW B. R.
ENGINEERING
ALL TYPE OF PIPELINES, STRUCTURE, MS & SS TANK FABRICATION & EQUIPMENT ERECTION WORKS
OFFICE: SR. NO.72/5, SAINIK COLONY, SAI PARK, DIGHI, PUNE- 411015
MOBILE NO.:- +91 9922166030 (BALDEV SINGH); +91 8793884569 (RITESH SINGH)
EMAIL:- [email protected]; [email protected]
GST NO.:- 27AOSPD5151R1Z8
PAGE NO.: 01
TO
KALEESUWARI AGRO INDUSTRIES PRIVATE LIMITED
PROJECT: KARMA22
SITE: KALEESUWARI AGRO INDUSTRIES PRIVATE LIMITED, TUTICORIN, TAMIL NADU-628004.
DATE: 31/05/2025
RA BILL NO.: 03
SUMMARY
SR. RATE AMOUNT
DESCRIPTION QUANTITY UNIT
NO. (INR) (INR)
1 INSTALLATION OF PIPING ELEMENTS
1A FLANGED ENDS 32.50 INCH DIA 59.00 1,917.50
1B CS WELDED ENDS 119.00 INCH DIA 94.00 11,186.00
1C SS WELDED ENDS 67.00 INCH DIA 138.00 9,246.00
2 FABRICATION & ERECTION OF CS (NON IBR) PIPING
2A WELDING 118.00 INCH DIA 127.00 14,986.00
2B ERECTION 43.50 INCH MTR 77.00 3,349.50
3 FABRICATION & ERECTION OF SS 304 PIPING
3A WELDING 67.00 INCH DIA 154.00 10,318.00
3B ERECTION 45.15 INCH MTR 94.00 4,244.10
4 SITE FABRICATION ITEMS MOC CS
4A TEE STRAIGHT 11.00 INCH DIA 187.00 2,057.00
4B TEE REDUCING 16.50 INCH DIA 204.00 3,366.00
4C REDUCER_CON 40.00 INCH DIA 182.00 7,280.00
4D BEND 27.00 INCH DIA 198.00 5,346.00
5 SITE FABRICATION ITEMS MOC SS 304
5A TEE REDUCING 6.50 INCH DIA 407.00 2,645.50
6 FABRICATION & ERECTION OF SHOE SUPPORTS 6.00 INCH DIA 83.00 498.00
7 FABRICATION & ERECTION OF PIPE SUPPORTS 0.052 MT 13,750.00 715.00
8 MANPOWER CHARGES FOR MISCELLANEOUS WORK 1.00 JOB 1,08,317.40 1,08,317.40
TOTAL AMOUNT INR 1,85,472.00
1 TO 3. FABRICATION & ERECTION OF CS & SS304 PIPELINE PAGE NO. 2
FLANGED CS WELDED SS WELDED SCREWED
PIPELINE DETAILS ERECTION WELDING
SR. PIPE ENDS ENDS ENDS ENDS
MATERIAL
NO. SIZE RUNNING INCH INCH INCH INCH INCH INCH
PIPLINE NO. FROM TO QTY QTY QTY QTY QTY
METER METER DIA DIA DIA DIA DIA
A FABRICATION & ERECTION OF CS PIPING
DRAWING NO: IN130596
1 VESSEL 1046/82 _ CS-ERW 500NB 1.20 24.00 2 40.00 0 0.00 2 40.00 0 0.00 0 0.00
2 L0147 F1046/82 ATM (NOZZLE) CS-ERW 150NB 0.25 1.50 2 12.00 2 12.00 2 12.00 0 0.00 0 0.00
F1046/82
3 L0139 F1082C, F1082B CS-ERW 150NB 0.40 2.40 1 6.00 1 6.00 1 6.00 0 0.00 0 0.00
(NOZZLE)
F1001A/460V
4 L0026 F1046/82 CS-ERW 40NB 0.15 0.23 1 1.50 1 1.50 1 1.50 0 0.00 0 0.00
(NOZZLE)
F1046/82
5 L0136 LP STEAM CS-ERW 15NB 6.80 6.80 12 12.00 0 0.00 12 12.00 0 0.00 0 0.00
(NOZZLE)
6 LEVEL SWITCH F1046/82 LSH F46/82-1 CS-ERW 25NB 0.10 0.10 0 0.00 0 0.00 1 1.00 0 0.00 0 0.00
7 L0144 LP STEAM F1021C CS-ERW 80NB 0.65 1.95 3 9.00 1 3.00 3 9.00 0 0.00 0 0.00
L0144 LP STEAM F1021C CS-ERW 50NB 0.90 1.80 6 12.00 3 6.00 6 12.00 0 0.00 0 0.00
L0144 LP STEAM F1021C CS-ERW 40NB 0.15 0.23 1 1.50 1 1.50 1 1.50 0 0.00 0 0.00
8 L0103 F1082B LP CONDENSTER CS-ERW 15NB 0.10 0.10 2 2.00 0 0.00 2 2.00 0 0.00 0 0.00
9 L0149 F1082B LP CONDENSTER CS-ERW 15NB 0.10 0.10 2 2.00 0 0.00 2 2.00 0 0.00 0 0.00
10 L0134 F1082C LP CONDENSTER CS-ERW 15NB 0.10 0.10 2 2.00 0 0.00 2 2.00 0 0.00 0 0.00
11 L0142 F1082C LP CONDENSTER CS-ERW 20NB 0.10 0.10 2 2.00 0 0.00 2 2.00 0 0.00 0 0.00
12 L0138 F1082C LP CONDENSTER CS-ERW 20NB 0.10 0.10 2 2.00 0 0.00 2 2.00 0 0.00 0 0.00
DRAWING NO: IN130595
COMPRESSED F1016A
1 L0063 CS-ERW 50NB 2.00 4.00 7 14.00 0 0.00 7 14.00 0 0.00 0 0.00
AIR HEADER (MODIFICATION)
43.50 118.00
TOTAL
INCH MTR INCH DIA
B FABRICATION & ERECTION OF SS304 PIPING
DRAWING NO: 100288981
PSV 821A1
1 L0298, L0307 821 A1 SS304 25NB 0.55 0.55 4 4.00 1 1.00 0 0.00 4 4.00 0 0.00
(MODIFICATION)
PSV 821A1
L0298, L0307 821 A1 SS304 40NB 0.10 0.15 1 1.50 1 1.50 0 0.00 1 1.50 0 0.00
(MODIFICATION)
HOT WATER
HOT WATER
2 HOT WATER RECOVERY MAIN SS304 65NB 1.00 2.50 2 5.00 0 0.00 0 0.00 2 5.00 0 0.00
TANK
HEADER
DRAWING NO: 100265995
1 L811IC.1 SEWER _ SS304 50NB 20.00 40.00 12 24.00 0 0.00 0 0.00 12 24.00 0 0.00
DRAWING NO: IN130595
F1001A/460V
1 L00282 F1016A SS304 80NB 0.30 0.90 2 6.00 0 0.00 0 0.00 2 6.00 0 0.00
(MODIFICATION)
2 L0082 F1021C F1016A SS304 80NB 0.35 1.05 3 9.00 0 0.00 0 0.00 3 9.00 0 0.00
1 TO 3. FABRICATION & ERECTION OF CS & SS304 PIPELINE PAGE NO. 3
FLANGED CS WELDED SS WELDED SCREWED
PIPELINE DETAILS ERECTION WELDING
SR. PIPE ENDS ENDS ENDS ENDS
MATERIAL
NO. SIZE RUNNING INCH INCH INCH INCH INCH INCH
PIPLINE NO. FROM TO QTY QTY QTY QTY QTY
METER METER DIA DIA DIA DIA DIA
(MODIFICATION)
DRAWING NO: IN130596
F1082/16
1 L0109, L0110 PF1082/16 SS304 100NB 0.00 0.00 4 16.00 0 0.00 0 0.00 4 16.00 0 0.00
(MODIFICATION)
F1082/16
L0109, L0110 PF1082/16 SS304 40NB 0.00 0.00 1 1.50 0 0.00 0 0.00 1 1.50 0 0.00
(MODIFICATION)
45.15 67.00 32.50 119.00 67.00
TOTAL 0.00
INCH MTR INCH DIA INCH DIA INCH DIA INCH DIA
4 TO 6. SITE FABRICATION ITEMS MOC CS & MOC SS304 PAGE NO. 4
REDUCING
PIPELINE DETAILS SHOE SUPPORT TEE STRAIGHT TEE REDUCING REDUCER CON BEND
SR. PIPE ECC
MATERIAL
NO. SIZE INCH INCH INCH INCH INCH
PIPLINE NO. FROM TO QTY INCH DIA QTY QTY QTY QTY QTY
DIA DIA DIA DIA DIA
A SITE FABRICATION ITEMS MOC CS
DRAWING NO: IN130596
1 VESSEL 1046/82 _ CS-ERW 500NB 0 0.00 0 0.00 0 0.00 1 20.00 0 0.00 0 0.00
VESSEL 1046/82 _ CS-ERW 500NB 0 0.00 0 0.00 0 0.00 1 20.00 0 0.00 0 0.00
2 L0147 F1046/82 ATM (NOZZLE) CS-ERW 150NB 1 6.00 1 6.00 1 6.00 0 0.00 0 0.00 0 0.00
3 L0139 F1082C, F1082B F1046/82 (NOZZLE) CS-ERW 150NB 0 0.00 0 0.00 1 6.00 0 0.00 0 0.00 0 0.00
4 L0136 LP STEAM F1046/82 (NOZZLE) CS-ERW 15NB 0 0.00 3 3.00 0 0.00 0 0.00 0 0.00 27 27.00
5 LEVAL SWITCH F1046/82 LSH F46/82-1 CS-ERW 25NB 0 0.00 0 0.00 1 1.00 0 0.00 0 0.00 0 0.00
6 L0144 LP STEAM F1021C CS-ERW 40NB 0 0.00 0 0.00 1 1.50 0 0.00 0 0.00 0 0.00
DRAWING NO: IN130595
COMPRESSED AIR F1016A
1 L0063 CS-ERW 50NB 0 0.00 1 2.00 1 2.00 0 0.00 0 0.00 0 0.00
HEADER (MODIFICATION)
11.00 16.50 40.00 27.00
TOTAL 0.00
INCH DIA INCH DIA INCH DIA INCH DIA
B SITE FABRICATION ITEMS MOC SS304
DRAWING NO: 100288981
PSV 821A1
1 L0298, L0307 821 A1 SS304 25NB 0 0.00 0 0.00 1 1.00 0 0.00 0 0.00 0 0.00
(MODIFICATION)
HOT WATER
2 HOT WATER HOT WATER TANK RECOVERY MAIN SS304 65NB 0 0.00 0 0.00 1 2.50 0 0.00 0 0.00 0 0.00
HEADER
DRAWING NO: IN130595
F1001A/460V
1 L00282 F1016A SS304 80NB 0 0.00 0 0.00 1 3.00 0 0.00 0 0.00 0 0.00
(MODIFICATION)
6.00 6.50
TOTAL 0.00 0.00 0.00 0.00
INCH DIA INCH DIA
7. FABRICATION & ERECTION OF PIPE SUPPORTS PAGE NO. 5
MEASUREMENT IN
SR. PIPELINE DETAILS STEEL SECTION QUANTITY UNIT WEIGHT TOTAL WEIGHT
METER
NO. USED (NOS) (KG) (KG)
PIPELINE NO. FROM TO LENGTH WIDTH
DRAWING NO: IN130596
1 VESSEL 1046/82 _ ISMC 100 1.600 1 9.56 15.30
VESSEL 1046/82 PLATE 5 MM 0.200 0.200 2 39.25 3.14
F1082/16
2 L0109, L0110 PF1082/16 ISMC 150 1.500 1 17.70 26.55
(MODIFICATION)
DRAWING NO: IN1305995
1 L811IC.1 SEVER _ ISA 50 1.500 1 4.47 6.71
TOTAL WEIGHT 51.69 KG
8. MANPOWER CHARGES FOR MISCELLANEOUS WORKS PAGE NO. 6
SR MANPOWER PRESENT OT RATE AMOUNT
DATE IN TIME OUT TIME
NO. DESIGNATION QUANTITY (DAY) (HOURS) (INR) (INR)
1 NUT-BOLTING MANHOLE OPENING AND TIGHTENING
16-04-2025 8:00 AM 7:00 PM FITTER 1 1 2 1210.00 1,512.50
16-04-2025 8:00 AM 7:00 PM WELDER 1 1 2 935.00 1,168.75
16-04-2025 8:00 AM 7:00 PM RIGGER 1 1 2 935.00 1,168.75
2 NUT BOLTING
17-04-2025 8:00 AM 7:00 PM FITTER 1 1 2 1210.00 1,512.50
17-04-2025 8:00 AM 7:00 PM WELDER 1 1 2 935.00 1,168.75
17-04-2025 8:00 AM 7:00 PM RIGGER 1 1 2 935.00 1,168.75
3 NUT BOLTING
18-04-2025 8:00 AM 7:00 PM FITTER 1 1 2 1210.00 1,512.50
18-04-2025 8:00 AM 7:00 PM WELDER 1 1 2 935.00 1,168.75
18-04-2025 8:00 AM 7:00 PM RIGGER 1 1 2 935.00 1,168.75
4 PLF DOOR FABRICATION
18-04-2025 8:00 AM 7:00 PM FITTER 1 1 2 1210.00 1,512.50
18-04-2025 8:00 AM 7:00 PM WELDER 1 1 2 935.00 1,168.75
18-04-2025 8:00 AM 7:00 PM RIGGER 1 1 2 935.00 1,168.75
5 PLF DOOR FABRICATION
19-04-2025 8:00 AM 7:00 PM FITTER 1 1 2 1210.00 1,512.50
19-04-2025 8:00 AM 7:00 PM WELDER 1 1 2 935.00 1,168.75
19-04-2025 8:00 AM 7:00 PM RIGGER 1 1 2 935.00 1,168.75
6 NUT BOLTING AND DUMMY INSTALATION AND MANUAL OPEN AND CLOSE
30-04-2025 11:00 AM 8:00 PM FITTER 1 1 0 1210.00 1,210.00
30-04-2025 11:00 AM 8:00 PM WELDER 1 1 0 935.00 935.00
30-04-2025 11:00 AM 8:00 PM RIGGER 1 1 0 935.00 935.00
30-04-2025 11:00 AM 8:00 PM HELPER 1 1 0 660.00 660
7 NUT BOLTING AND GASKET AND MESH FITTING
02-05-2025 8:00 AM 8:00 PM FITTER 1 1 3 1210.00 1,663.75
02-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
02-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
8 NUT BOLTING AND MESH FITTING
03-05-2025 8:00 AM 8:00 PM FITTER 1 1 3 1210.00 1,663.75
03-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
03-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
9 NUT BOLTING MESH FITTING AND WELDING
05-05-2025 8:00 AM 8:00 PM FITTER 1 1 3 1210.00 1,663.75
05-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
05-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
10 NUT BOLTING MESH FITTING
06-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
06-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 935.00 2,571.25
11 NUT BOLTING AND MESH FITTING
07-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
07-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 935.00 2,571.25
12 NUT BOLTING
8. MANPOWER CHARGES FOR MISCELLANEOUS WORKS PAGE NO. 7
SR MANPOWER PRESENT OT RATE AMOUNT
DATE IN TIME OUT TIME
NO. DESIGNATION QUANTITY (DAY) (HOURS) (INR) (INR)
08-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
08-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 935.00 2,571.25
13 NUT BOLTING
09-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 935.00 2,571.25
14 NUT BOLTING
10-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 935.00 2,571.25
15 NUT BOLTING
11-05-2025 8:00 AM 2:00 PM RIGGER 2 1 0 935.00 1,870.00
16 NUT BOLTING
12-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 1105.00 3,038.75
17 NUT BOLTING
13-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
13-05-2025 8:00 AM 8:00 PM RIGGER 2 1 3 935.00 2,571.25
13-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
18 NUT BOLTING
14-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
14-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
14-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
19 NUT BOLTING
15-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
15-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
15-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
20 NUT BOLTING
16-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
16-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
16-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
21 NUT BOLTING
17-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
17-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
17-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
22 NUT BOLTING
19-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
19-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
19-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
23 NUT BOLTING
20-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
20-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
20-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
24 NUT BOLTING
21-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
21-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
21-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
25 NUT BOLTING
22-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
8. MANPOWER CHARGES FOR MISCELLANEOUS WORKS PAGE NO. 8
SR MANPOWER PRESENT OT RATE AMOUNT
DATE IN TIME OUT TIME
NO. DESIGNATION QUANTITY (DAY) (HOURS) (INR) (INR)
22-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
22-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
26 NUT BOLTING
23-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
23-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
23-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
27 NUT BOLTING
24-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
24-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
24-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
28 NUT BOLTING
26-05-2024 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
26-05-2024 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
26-05-2024 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
29 NUT BOLTING
27-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
27-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
27-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
30 NUT BOLTING
28-05-2025 8:00 AM 8:00 PM WELDER 1 1 3 935.00 1,285.63
28-05-2025 8:00 AM 8:00 PM RIGGER 1 1 3 935.00 1,285.63
28-05-2025 8:00 AM 8:00 PM HELPER 1 1 3 660.00 907.50
TOTAL MANPOWER COST (A) INR 1,07,305.00
CONSUMABLES USED (B) INR 1,012.40
TOTAL AMOUNT (A+B) INR 1,08,317.40
CONSUMABLES USED
SR. RATE AMOUNT
DATE DETAILS QUANTITY UNIT
NO. (INR) (INR)
1 18-04-2025 CUTTING WHEEL 4" 12 NOS 17.70 212.40
18-04-2025 ESAB 6013 WELDDING ROD 30 NOS 10.00 300.00
2 19-04-2025 ESAB 6013 WELDDING ROD 20 NOS 10.00 200.00
3 30-04-2025 ESAB 6013 WELDDING ROD 10 NOS 10.00 100.00
4 05-05-2025 ESAB 6013 WELDDING ROD 20 NOS 10.00 200.00
TOTAL AMOUNT (B) INR 1,012.40