0% found this document useful (0 votes)
29 views80 pages

DPF 15-100B Manual. DP 15 - 100

This document outlines the installation, operation, and maintenance manual for TOYO submersible pumps DPF-15 to DPF-100, including the general terms and conditions of sale. It details payment milestones, warranties, shipping responsibilities, and liability limitations. The agreement emphasizes the buyer's responsibility for compatibility and suitability of the goods with their systems, as well as the seller's rights regarding cancellations and modifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views80 pages

DPF 15-100B Manual. DP 15 - 100

This document outlines the installation, operation, and maintenance manual for TOYO submersible pumps DPF-15 to DPF-100, including the general terms and conditions of sale. It details payment milestones, warranties, shipping responsibilities, and liability limitations. The agreement emphasizes the buyer's responsibility for compatibility and suitability of the goods with their systems, as well as the seller's rights regarding cancellations and modifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 80

Manual de Instalación, Operación y Mantenimiento

bombas sumergibles TOYO DPF-15 a DPF-100

Distribuidas por:

Carrera 25 # 3-45 of 267

Medellín-Colombia

+(057) 4-3161604

Celular: 3006036884

[email protected]
TOYO PUMPS NORTH AMERICA CORPORATION
Revision No. 10 Revision Date: December 12th, 2019

GENERAL TERMS & CONDITIONS OF SALE Milestone


Acceptance of Purchase Order 15%
Submittal of Approval Drawings 20%
GENERAL TERMS & CONDITIONS OF SALE
Purchase of Major Components 20%
The following terms and conditions shall apply to the purchase and sale of any Goods ready to ship 25%
products, materials, parts or other goods (collectively, “Goods”) from Toyo Pumps
30 days after Shipment* 20%
North America Corp. (“TPNA”), Toyo Pumps North America, LLC. (“Toyo”), and
*(subject to credit approval and at Seller’s discretion)
Hevvy Pumps Inc. (“Hevvy” and, together with “Toyo” and “TPNA”, the “Seller”).
and the performance of any installation, repair, advisory, consulting or other
All milestone payments are due upon receipt of invoice, with the exception of the
services by Seller (collectively, the “Services”): 30 days after Shipment milestone.
TERMS & CONDITIONS OF SALE Interest will accrue at the annual rate of 24% per annum to be compounded
monthly on the balance due and owing but will not exceed the maximum permitted
1. Acceptance of Purchase Order: Formal acknowledgment of the purchase
by law.
order by Seller by return to the purchasing party (the “Buyer”) of the executed copy
or Seller’s commencement of such performance or acceptance of any payment
Should the Buyer for any reason default in payments due under this Agreement,
shall constitute acceptance by Seller subject to having the Goods in stock and/or the Buyer agrees to pay all collection costs and indemnify Seller for all solicitors’
being willing to manufacture the Goods and perform the Services and these terms
fees arising from the default in payment.
and conditions. If the Buyer submitted a purchase order to any company,
partnership or other entity that directly or indirectly through one or more
5. Shipping: Unless shipping instructions accompany each order and are
intermediaries controls, is controlled by or is under common control with Seller (in
accepted by Seller, the manner of shipping is at the discretion of Seller. Seller’s
each case, an “affiliate”), including Toyo Pumps North America, L.L.C. (“TPNA responsibility for the Goods ceases when they pass into the hands of the carrier at
LLC”), or to any field or business consultant, salesman or other contractor of Seller which time the Buyer assumes the risk for the Goods.
or their respective affiliates, then the Buyer acknowledges that such affiliate
(including TPNA LLC), consultant, salesman or other contractor, as the case may 6. Damaged Goods: Seller’s Goods are carefully inspected and checked for any
be, does not have the authority to bind Seller and the purchase order will not be
damage prior to shipment. The Buyer assumes all responsibility for risk relating to
accepted until the earlier of receipt by the Buyer of an executed copy of the
loss or damage of Goods once the Goods pass into the hands of the carrier.
purchase order signed by an officer of Seller, Seller’s commencement of
performance under the purchase order or acceptance by Seller of any payment 7. Delayed Performance: Seller shall not be responsible for delays in shipments
under the purchase order. Seller’s acceptance of the purchase order is conditional
or performance of the Services caused by (a) earthquake or explosion; (b) war,
upon the Buyer’s agreement that the terms and conditions set out in this
invasion, hostilities (whether war is declared or not), terrorist threats or acts, riot or
Agreement govern the relationship between the parties.
other civil unrest; (c) requirements of law; (d) actions, embargoes, tariffs, or
In the event of any conflict or inconsistency between the terms and conditions of
blockades in effect on or after the date of this Agreement; (e) action by any
sale herein and the terms and conditions contained in the Buyer’s order or in any governmental authority; (f) national or regional emergency; and (g) strikes, labor
other form issued by the Buyer, whether or not any such form has been stoppages or slowdowns or other industrial disturbances; (h) material shortages;
acknowledged or accepted by Seller, Seller’s terms and conditions herein shall (i) transportation delays; (j) accidents; (k) acts of God or other causes beyond
prevail. No waiver, alteration or modification of these terms and conditions shall be Seller’s reasonable control; or for delay caused by the acts or omissions of Seller,
binding upon Seller unless made in writing and signed by a duly authorized its servants, employees, contractors, subcontractors or agents. In any event, Seller
representative of Seller.
shall not be responsible for the Buyer’s lost profits or other consequential damages
incurred by the Buyer for any delay or failure by Seller to make delivery of Goods
2. Materials and Compatibility with Buyer’s System or Process: Quotations or performance of Services under any order, it being agreed that Seller’s sole
and recommendations including, but not limited to, materials of construction and liability shall be to refund any amounts prepaid by the Buyer to Seller on account
compatibility of the Goods with the Buyer’s system and process are based on
of such delayed or non-delivered order.
information supplied by the Buyer. The Buyer is responsible for final confirmation
of the metallurgical suitability of the construction materials and compatibility of the
8. Warranties: Seller makes no warranties expressed or implied, other than the
Goods with the Buyer’s system or process. By placing an order further to a
following:
quotation, the Buyer acknowledges and agrees that it has confirmed the
metallurgical suitability of the construction materials and the compatibility of the (a) Seller warrants its Goods to be free from defects in material and
Buyer’s system and process with the Goods. workmanship until the earlier of one year from the date of start of
Seller expressly disclaims any warranty that the Goods will be compatible with the operation or use of the Goods or 18 months from the date of shipment
Buyer’s operating system or process, and that the construction materials are to the original retail customer, provided no alteration has been made
metallurgically suitable for the Buyer’s purposes. In the event that the Goods are
thereto after delivery.
not compatible with the Buyer’s operating system or process, and/or that the
construction materials are not metallurgically suitable, the Buyer shall be
(b) Any part or parts contained in the Goods which are proven defective
responsible for the cost of all changes in the Goods, and if the Buyer’s order is
after inspection by and to the satisfaction of Seller will be (at Seller’s
cancelled, Seller shall be reimbursed for all costs and expenses incurred and
option) adjusted or repaired or replaced free of charge, on return of
reasonable profit for performance executed prior to the date of such termination.
such defective part(s) by the Buyer. The Buyer shall assume all
responsibility and expense for removal, reinstallation, freight and any
3. Taxes: Any taxes, excise duties, levies or other assessments under any existing
related duties or taxes in connection with the foregoing.
or future laws which Seller may be required to pay or collect in connection with the
order, under any existing or future laws, including any taxes, excise duties, levies (c) Seller shall not be liable and shall not have any obligation for fair wear
or other assessments levied on the sale, purchase, delivery, storage, processing, and tear, seal failures, damage caused by vibration, failure to properly
use or consumption of any other materials necessary for the completion of this maintain, damage caused by operating without flow or adequate
order are not included in the purchase price and shall be for the account of the
submersion, damage caused by corrosives, abrasives or foreign
Buyer. The Buyer shall promptly pay the amount thereof to Seller upon demand,
objects and other damage caused by the improper storage, handling,
or in lieu thereof, furnish Seller with a tax exemption certificate acceptable to the
operation, or maintenance contrary to good practice or instructions in
taxing authorities. Without restricting the generality of the foregoing, HST or GST,
any manuals, or due to the fault, negligence, want of skill or wrongful
if applicable, shall be added to the purchase price.
acts of the Buyer, its employees, agents, contractors or suppliers.
4. Payments: For orders of Goods having an aggregate purchase price of less
(d) With respect to any equipment and materials which are included in the
than $100,000 and orders for Services, Seller’s regular terms are net 30 days
Goods furnished by Seller, but manufactured by others, the Buyer shall
subject to credit approval and at Seller’s discretion. For orders of Goods having an
accept in lieu of any liability or guarantees on the part of Seller, the
aggregate purchase price equal to or greater than $100,000, progress payments
benefits of any guarantees (if any) that are obtained by Seller from
in accordance with the following milestones shall apply: such manufacturers or vendors.

Page 1 of 2

TSD – General Terms and Conditions of Sale- Rev10


TOYO PUMPS NORTH AMERICA CORPORATION
Revision No. 10 Revision Date: December 12th, 2019

(e) Seller shall perform the Services in a workmanlike manner consistent by a sole arbitrator. The award of the arbitrator shall be final and binding upon
with industry standards applicable at the time and place where such each of the parties and shall not be subject to appeal or judicial review.
Services are performed.
16. Governing Law: This Agreement shall be governed by and interpreted in
The above warranties cease to be effective if the Goods are altered or repaired accordance with the laws in effect in the Province of British Columbia, and, subject
other than by persons authorized or approved by Seller to perform such work. to Article 14, the parties attorn to the courts of the Province of British Columbia for
Repairs or replacement deliveries do not interrupt or prolong the term of the the resolution of any disputes arising out of this Agreement. The United Nations
warranty. The warranties above cease to be effective if the Buyer fails to operate Convention on Contracts for the International Sale of Goods will not apply to the
and use the Goods sold hereunder in a safe and reasonable manner and in supply of Goods or Services.
accordance with any written instructions from the manufacturer.
17. Exclusion of Liability for Oral Representations: The Buyer acknowledges
9. Exclusivity of Warranties: Seller expressly disclaims to the full extent that none of Seller, their respective affiliates or agents has made any oral or
permitted by law all express, implied, statutory and other warranties, guarantees written representations, inducements, or promises that are not expressly
or representations, including, without limitation, the warranties of merchantability, contained in this Agreement. The Buyer acknowledges and agrees that ANY
merchantable quality, durability or fitness for a particular purpose, and non- ORAL OR WRITTEN REPRESENTATIONS, INDUCEMENTS OR PROMISES
infringement of proprietary and intellectual property rights. For further clarity, the MADE BY ANY FIELD OR BUSINESS CONSULTANT, SALESMAN OR OTHER
parties acknowledge and agree that, to the extent permitted by law, section 18 of CONTRACTOR OF SELLER OR THEIR RESPECTIVE AFFILIATES ARE
the Sale of Goods Act, R.S.B.C. 1996, c. 410, and any similar legislation in other EXPRESSION OF OPINION ONLY AND ARE NOT BINDING ON SELLER OR
applicable jurisdictions, is excluded from and inapplicable to this Agreement. THEIR RESPECTIVE AFFILIATES UNLESS EXPRESSLY CONTAINED
HEREIN. NEITHER SELLER NOR ANY OF THEIR RESPECTIVE AFFILIATES
10. Limitation of Liability: The liability of Seller and their respective affiliates, IS LIABLE FOR ANY ORAL OR WRITTEN REPRESENTATIONS,
including but not limited to TPNA LLC, and their respective directors, INDUCEMENTS OR PROMISES MADE BY ANY FIELD OR BUSINESS
officers, employees, contractors, subcontractors and agents (“Seller and CONSULTANT, SALESMAN OR OTHER CONTRACTOR OF SELLER OR
Others”) is limited to the repair, replacement or refund of the original THEIR RESPECTIVE AFFILIATES UNLESS EXPRESSLY CONTAINED IN THIS
purchase price actually paid by the Buyer for the particular Goods or AGREEMENT. This Agreement may be modified only in writing signed by the
Services which are the subject of the claim. Except as expressly provided in Buyer and an officer of either Seller. The Buyer acknowledges that any field
the foregoing, Seller and Others will not be liable for any loss, damage or or business consultant, salesman or other contractor of Seller or its affiliates
expense including, but not limited to, the following: bodily harm to any is not authorized to modify or change any term of this Agreement.
individual, loss of profits, revenue, interest, loss by reason of shutdown or
non-operation, increased expense of operation of the equipment, loss of 18. Intellectual Property: Title to, ownership of and all intellectual property rights
power system, cost of purchase or replacement power, or claims of Buyer in, any facilities, designs, equipment, specifications, drawings, formulas,
or customers of Buyer for service interruption, or any special, indirect, engineering notices, technical data, software, processes, documentation and
incidental or consequential damages arising out of this contract or any information used in connection with Seller’s supply of the Goods or Services (the
breach thereof, negligence of Seller and Others, the performance of the “Goods Components”) shall be and remain with Seller, or their suppliers or
Services or defect in, failure of, or malfunction of the Goods furnished to the licensors. This Agreement does not grant to the Buyer any intellectual property or
Buyer or the customers of the Buyer. Seller and Others will not be other rights or licenses in or to any Goods Components. Buyer shall not, and shall
responsible for any special, indirect, consequential or incidental damages or not knowingly permit a third party to, whether directly or indirectly, modify, reverse
expense of any kind or nature, regardless of the cause, even if Seller and engineer or disassemble any Goods without the prior written consent of Seller.
Others have any knowledge regarding the probability of their occurrence.
19. Severability: If any provision of this Agreement is determined to be invalid,
11. Cancellation or Modification: The Buyer may cancel or modify a shipment of void or unenforceable, in whole or in part, such invalidity, voidance or
any part thereof only upon Seller receiving written notice seven (7) days prior to unenforceability shall attach only to such provision or part thereof, and the
the cancellation or modification and upon payment to Seller of reasonable and remaining part of such provision and all other provisions thereof shall continue in
proper cancellation or modification charges based upon expenses already incurred full force and effect.
and commitments made by Seller, including, without limitation, any labour done,
material purchased, Services performed and also including Seller’s usual 20. Applicability: This Agreement applies only to this order. Prospective orders
overhead and reasonable profit and cancellation charges from Seller’s suppliers. may be subject to revised terms and conditions. It is the Buyer’s responsibility to
request and review Seller’s current terms and conditions in respect of prospective
12. Cancellation or Modifications due to Unusual Market Conditions: The orders.
Seller will take all reasonable precautions to mitigate the risk related to Unusual
Market and Supply Chain conditions related to commodities/ materials, economic 21. Entire Agreement Clause: This Agreement constitutes the entire agreement
tariffs, and sanctions. However, if, following the receipt and acceptance of a between the parties, and is subject to no other oral or written proposals,
purchase order by Hevvy, the cost to Hevvy of the raw materials required to agreements, implied terms, agreements through course of conduct, conditions
manufacture the Products ordered under such purchase order increases by a precedent or understandings whatsoever.
material amount, then notwithstanding Hevvy’s prior acceptance of such purchase
order, Hevvy may, in its sole discretion, either cancel such purchase order or
increase the price for such Products by a corresponding amount by providing
written notice to the Channel Partner, and upon receipt of such written notice the End of General Terms & Conditions of Sale
Channel Partner will have the option to either accept such increased price or
cancel the purchase order; provided that if the Channel Partner fails to notify Hevvy
that it wishes to cancel the purchase order within 10 days of the date of receipt of
Hevvy’s notice of the price increase, then the Channel Partner will be deemed to
have accepted the price increase.

13. Return of Goods: No credit or refund will be permitted for Goods returned
unless Seller’s prior written permission has been obtained. If accepted, returned
Goods may be subject to a handling or restocking charge.

14. Back Orders: The Buyer agrees that if it has ordered items which are
unavailable at the time of the placement of the order, Seller will ship them as soon
as they are available or at a later time.

15. Arbitration: If there is any disagreement, dispute or controversy (a "Dispute")


between the parties with respect to any matter arising under this Agreement or the
construction of this Agreement, then the Dispute shall be referred to and finally
resolved by arbitration under the rules of the Arbitration Act, R.S.B.C. 1996, c. 55

Page 2 of 2

TSD – General Terms and Conditions of Sale- Rev10


TOYO PUMPS NORTH AMERICA CORPORATION
4

TABLE OF CONTENTS

TABLE OF CONTENTS .......................................................................................................... 1

SECTION I - INTRODUCTION .................................................................................................. 5


I-A General ............................................................................................................. 5
I-B Safety ............................................................................................................... 5
I-C Upon Arrival ........................................................................................................ 6
I-D Storage.............................................................................................................. 6
SECTION II – INSTALLATION ................................................................................................. 7
II-A Pre-start Preparations ............................................................................................ 7
II-B Installing the Pump ............................................................................................... 7
II-C Electrical Wiring ................................................................................................... 8
II-D Internal Sensor Systems ......................................................................................... 9
SECTION III – OPERATION .................................................................................................. 10
III-A Pre-start Checks ............................................................................................... 10
III-B Test Operation ................................................................................................. 10
III-C Operation ....................................................................................................... 11
SECTION IV – MAINTENANCE............................................................................................... 12
IV-A Regular Inspections .......................................................................................... 12
IV-B Lubrication and additional Maintenance ................................................................. 12
IV-C Recommended Spare Parts ................................................................................. 13
IV-D Electrical Check (Megger Test)............................................................................. 14
SECTION V – TROUBLESHOOTING ......................................................................................... 15

SECTION VI – APPENDIX .................................................................................................... 17


A Model Identification
B Pump Specifications
C Performance Curves
D Motor Protection
E Pump Lubrication and Additional maintenance
F Disassembly and Assembly Procedures
G Optional equipment (if applicable)
H Drawings & Parts Lists

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
5

SECTION I - INTRODUCTION

I-A General
Thank you for selecting a Toyo submersible pump.

In order to ensure that you receive the maximum benefit of this equipment, it is required that this
INSTRUCTION & SERVICE MANUAL be thoroughly read prior to use, and that all instruction be
carefully followed.

The descriptions and instructions in this manual cover the standard design of the equipment and the
variations for the range of models. This manual does not cover all the design details (see specific pump
model drawings) nor does it provide for every contingency which may be encountered. If information
cannot be found in this manual, contact the nearest Toyo branch office.

This pump has been designed to provide safe and reliable service. It is, however, both a pressure
vessel and a piece of rotating machinery. The operator must exercise good judgment and proper safety
practices to avoid damage to the equipment and surroundings to prevent personal injury. The
instructions in this manual are intended for personnel with a general training in operation and
maintenance of centrifugal pumps.

Toyo Pumps reserves the right to change the design, construction material of any part without incurring
the obligation of installing such changes on pumps already delivered.

I-B Safety

It is assumed that your safety department has established a safety program based upon a thorough
analysis of industrial hazards. Before installing, operating or performing maintenance on the pump and
associated components described in this manual, it is suggested that the safety program be reviewed to
ensure that it covers the hazards arising from high speed rotating machinery.

WARNING!!

Standard pumps are not explosion-proof or spark-proof.


Pumps should not be operated in any area where
flammable or explosive gases, vapors, liquids or particles
are or may be present or where a spark could cause a

In general, all personnel should be guided by all the basic rules of safety associated with the equipment
and the process.

It should be understood that the information contained in this manual does not relieve operating and
maintenance personnel of the responsibility of exercising normal good judgment in operation and care
of the pump and its components.

Toyo cannot be held responsible for accidents or damage incurred to equipment or personnel due to
any use of the equipment not described in this manual.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
6

I-C Upon Arrival

The unit should be inspected upon arrival. If there are any product irregularities, contact Toyo
immediately. Damage due to shipment should be reported to the carrier.

Care should be taken when unpacking and moving pumps. Rough handling of the pump can cause
breakage. Make sure that any equipment used to lift the pump or any of its components is capable of
supporting the weights encountered. Make sure that all parts are properly rigged before attempting to
lift.

Take note of the pump model (with correct frequency and voltage) as per your order. Pump parts and
accessories may be packed inside the shipping container or attached to skids in individual packages.
Inspect all containers, crates and skids before discarding.

A copy of this instruction book as well as instruction sheets for other various components may be
included in the shipment. Put these papers in a safe, accessible place for ready reference when
required. It is important that the entire contents of this booklet be studied before installation.

I-D Storage
The pump is protected against corrosion for the period of shipment and installation only.

If the pump is not to be installed at once, find a clean, dry location for storage indoors. The unit should
be stored in an approximately level position with no strains applied. Protective coverings should be left
in place. The pump can be left in its shipping container or skid for storage. The unit is shipped oil and
grease filled.

Rotate the pump once per month by hand to re-lubricate the bearing surfaces.

If the pump has been in use before, make sure the unit is cleaned and dried completely prior to putting
in storage.

For extended storage suitable covers out of plywood or plastic must be installed on the suction and
discharge flanges and any other openings on auxiliary equipment to provide adequate protection
against dirt, dust and nesting animals.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
7

SECTION II – INSTALLATION

II-A Pre-start Preparations

1. Installation will require the following tools: AC voltmeter and ammeter (clamp type), meg-ohm
meter, wrenches, and screwdriver.
2. If the pump is not in its fully assembled state or has parts missing, do not install the pump and
contact Toyo for replacement parts.
3. Choose a location for the pump that is away from flammable or explosive materials. The pump
should be located in an area where water levels will be sufficient at all times (see appendix
drawings for minimum water level).

WARNING: Allowing the pump to operate with insufficient discharge head or a clogged strainer
stand can result in excessive vibration, current draw and/or noise, which could cause electrical
hazards and damage to the pump.

4. Using a meg-ohm meter check the motor’s insulation resistance by taking a measurement between
each power conductor of the cabtyre cable and the ground conductor. Insulation resistance should
be 1 MΩ or greater for new or newly repaired pumps with cable attached.
5. Ensure your power supply is within ±5% of its rated voltage.
6. Do not pump fluids other than recommended without contacting Toyo first.

WARNING: Using the pump outside its temperature range could lead to electrical hazards or pump
failure.

II-B Installing the Pump

1. Lifting the pump can be done by securing a rope/chain to the eye bolts, ensuring not to drop or
heavily impact the unit on contact.

CAUTION: During placement, be aware of the weight and movement of the centre of gravity of the
pump as it can easily fall or cause damage.
WARNING: Never hold or suspend the pump by its cabtyre cable. This could lead to electrical
shorts, shock to personnel or fire if damaged.

2. Place the pump on a flat, clear surface for use in the upright position. A mounting block may be
used if necessary to prevent the suction strainer from being submerged in mud.
3. Using suitable piping materials, arrange pump piping as directly as possible while preventing any
load on the pump itself.
4. Any recoil from the pump starting up should be able to be taken by the piping.
5. Avoid getting welding sparks and paint on the pump when making connections.
6. Avoid submerging the discharge piping to prevent backflow when the pump stops.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
8

II-C Electrical Wiring

1. Choose qualified personnel to perform all electrical wiring according to local rules and regulations.

WARNING: Failure to abide by standard practices by qualified electricians may risk safety and lead
to breaking regulations.

2. The pump must be outfitted with appropriate breakers and overload protectors per local rules and
regulations to prevent electrical shock and/or pump damage.

If unsure of the recommended breaker and overload protection settings for your pump, contact your
local Toyo representative.

3. Properly ground the pump prior to usage, making certain not to attach the grounding wire to
gas/water pipes, telephone ground wires, or lightning arrestors.

WARNING: Improper grounding could result in electrical shock.


4. Disconnect all power supplies to the pump before any wiring or maintenance activities. Source of
power should be from a non-shared, dedicated power source rated for the pump current.

CAUTION: If power is not disconnected prior to electrical setup or the source power is shared with
other equipment, this may lead to unforeseen accidents and hazards such as shock and fire.

5. To connect the cabtyre cable, connect all the leads to the terminals of the control panel. See
diagram below. Avoid excessive twisting, bending or impact of the cable and the individual wires to
prevent damage.

WARNING: If the cabtyre cable becomes damaged or cut it may cause electrical hazards or fire.

6. If the cabtyre cable requires extending, use a conductor size equal to or greater than the previous
cable to maintain performance and prevent overheating. For length longer than a total cable length
of 100 feet consult your cable supplier or Toyo to confirm line voltage drop is less than 5% total.

WARNING: If the cabtyre cable overheats it may lead to electrical hazards or fire.

7. Keep the power supply and cabtyre cable away from water. If the cabtyre cable needs to be
submerged in water, make certain there is no damage to the insulation and any splices are
completely sealed and protected from water damage.

WARNING: Stop using the pump if there is wear/handling damage or water damage to the cabtyre
cable. This may lead to hazards such as shock and fire.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
6

Wiring & Circuit Diagrams

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
9

II-D Internal Sensor Systems

Each pump is equipped with internal sensor systems as detailed in the appendix. Some of these
systems can be wired to halt operation of the pump as soon as a problem has been indicated.

CAUTION: Avoid switching the pump on and off repeatedly once a problem has been established to
prevent further damage of the motor and pump.

WARNING: These options do not replace the need for correctly sized starter and overloads.

CAUTION: Sensors wired for auto shut-down must be connected to a trip relay to prevent the pump
restarting without warning. Always lock out pump before service.

CAUTION: Auto shut-down of the pump while pumping slurry through the lines risks the lines getting
plugged and the pump being buried.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
10

SECTION III – OPERATION

III-A Pre-start Checks


1. Double check the frequency and voltage rating are correct for the pump model.

CAUTION: Using incorrect power ratings may lead to damage of the pump as well as lower
performance and efficiency.

2. Double check the rating for the breaker and overload protection (in accordance with rated current of
pump) and verify insulation resistance (should be greater than or equal to 1 M for a pump with
cable attached).

3. When powering the pump with a generator, do not share the generator with other equipment.

III-B Test Operation

WARNING: If testing while suspended in mid air, special attention should be paid to stay clear of
the discharge piping. Extreme caution should be exercised. The recoil that occurs on startup can
result in accidents or damage to unit or nearby objects.

1. Bump start the pump. Check the direction of rotation is counterclockwise when viewed from the
suction end (ie. correct recoil on starting is counterclockwise when viewed from the top).

WARNING: For a pump with mechanical seals Bump starting must be limited to one or two
seconds or expensive seal failure will occur.
WARNING: These pumps will pump a significant fraction of rated performance running backwards.
The fact that the pump is pumping does not verify correct rotation.
WARNING: The pump rotation check should never be done while submerged. If the impeller is
rotating in the reverse direction while in water it could damage the pump.

2. If the direction of rotation is incorrect interchange connections between any two leads U, V, or W.

WARNING: Remember to turn off power supply circuit breaker and ensure the pump has
completely stopped prior to performing any rewiring.

3. Submerge the pump to the recommended minimum submergence (see outline drawing in appendix)
and allow it to run for 2 to 5 minutes. Measure the voltage (within ±5% rated voltage) and the
operating current for leads U, V and W.
 Refer to nameplate data. If voltage exceeds tolerance levels re-check power supply.
 Refer to nameplate data. If current exceeds the rated value overloading the motor is the likely
reason, check pump specifications.

4. Stop the test operation of the pump if abnormal sounds, vibration or smells result and contact Toyo
immediately. If no problems arise, allow the pump to continue under operation.

CAUTION: Allowing the pump to operate under such non-desirable conditions may result in
electrical hazard or damage.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
11

III-C Operation

1. If no abnormal occurrences happen during the test, continue as fully operational.

CAUTION: With continued use, the pump may become hot, avoid contact.

2. For operation in air follow these guidelines:


a. DL Pumps: Although not recommended these can run dry continuously.
b. DXL Pumps: Bump only, for operation the wet end must be submerged to the
recommended level.
c. DP-xx-2 & DPF Pumps:
i. Lip seal: 10 minutes maximum run time in air
ii. Mechanical seal: Bump only, running dry will damage seal. During operation
the motor must be completely submerged or cooled with a water jacket.
d. DEM/DBS Pumps: Bump only, running dry will damage seal. During operation the
motor must be completely submerged or cooled with a water jacket.

3. Start the pump in clear fluid to prime the discharge hoses/piping. Ensure that no hoses are kinked
as the pump may not be able to force them open to start flow. Where flexible hose is required use
non-collapsible hose.

4. Lower the pump slowly into the material being pumped.

5. Slurry density can be observed by watching an ammeter for current loading. Higher current means
higher specific gravity and thus higher density.

6. Slurry density can often be controlled by raising and lowering the pump into the material.

7. The hose must be sized carefully to ensure suitable carrying velocities in the line. Typically,
velocities of 8 to 10 ft/sec (2.4 to 3 m/sec) in the hose are suitable for normal slurries. Using larger
or smaller hose could result in plugging the line. Make sure that the discharge hose is not bent or
folded as this will cause a decrease in pump output. Always use the shortest possible length of
hose.

8. Prior to pump shutdown lift the pump into clear fluid for several minutes to completely flush the
system of any slurry.

CAUTION: Never stop the pump while pumping slurry through the lines as there is a risk the lines
will plug and the pump will be buried.

9. After shutdown, to keep the pump in good condition and maintain high pumping efficiency, clean out
any solids (i.e. sand, mud, etc.) which may have been collected in the pump casing or around the
strainer stand.

10. For storage after use, the pump should be stored in a dry warehouse after cleaning both the inside
and outside of the pump thoroughly.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
12

SECTION IV – MAINTENANCE
In order for the pump to continue running efficiently and provide a long service life, regular inspections
and maintenance should be done in addition to monitoring the pump’s internal sensors.

IV-A Regular Inspections

1. Turn off the power and disconnect the pump’s cabtyre cable from the power source.

WARNING: All electrical work must be performed by qualified personnel.

2. Clean the pump with water, removing any dirt or fragments that may have collected within the
impeller or other crevices.
3. A general inspection should be done to make sure there are no cracks, no loose bolts any other
obvious abnormalities.
4. The following is an inspection schedule listing items to check on a regular basis. See the section on
Spare Parts for spares/replacements.

Regular Inspection and Maintenance Schedule:


Schedule Maintenance to be performed
Daily -Remove excessive accumulations of dirt on the motor
-Check for abnormal noise or vibration
-Check clarity of oil and oil level (see Lubrication Section)
Weekly -Check values for voltage, current and insulation resistance with rated
values.
-Supply voltage • ±5% rated value
-Operating current • compare with rated value
-Insulation resistance • Must be 1MΩ or greater for pump with cable
attached, record value, any change from previously recorded value
should be minimal otherwise inspection of the motor may be required
-General inspection of pump efficiency and check for plugging or wear of
Monthly
the impeller which may reduce performance significantly.
Every 3 Months or 1500
-Re-grease top and bottom bearings if applicable
Hrs (earlier of two)
Every Year or 4000 Hrs -Change oil and re-grease bearings if applicable (see Pump Lubrication in
(earlier of two) appendix).
Every 6 Months (for
heavy dredge -Replace all seals
application)
Every 1-2 Years
-Complete servicing (regardless of pump's condition)
depending on severity of
-Replace all seals
service
-Clean and dry the pump for indoor storage
Out of Use
-Rotate once a month by hand

IV-B Lubrication and additional Maintenance


1. For lubrication and additional maintenance details see appendix.
2. Always tailor lubrication intervals to your application specific requirements. If pump is run
intermittently, the oil reservoir should be examined more often.
3. If the pump has not been operated for a long period of time, the oil reservoir should be
examined shortly after startup to ensure there has been no deterioration of seals.
TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
13

IV-C Recommended Spare Parts

To ensure against possible long and costly downtime periods, especially on critical services, it is
advisable to have spare parts on hand. A list of spare parts is found in the parts list. Repair orders will
be handled with minimal delays if the following directions are followed:

1. Give model number and serial number. These can be obtained from the nameplate on the pump.

2. Write plainly the name and part number of each part required. These names and numbers should
agree with those on the sectional drawings.

3. Give the number of parts required.

4. Give complete shipping instructions.

Some parts have long lives and therefore do not have to be carried in stock. These items should be
checked at regular intervals, and when replacement is indicated, the parts should be ordered.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
14

IV-D Electrical Check (Megger Test)

Whenever the pump is serviced the following test should be performed to check the insulation
resistance of the motor and cable.

a) Disconnect the cabtyre cable from the power source.

b) Verify continuity between the cable ground conductor and the motor frame.

c) Test the motor and cable assembly. Using the 500 VDC Megger Tester, check the electrical
insulation resistance between the cable ground conductor (green) and each power conductor in
turn (See Fig.1).

d) Any reading less than 1 meg-ohms (M) indicates damage to the cabtyre cable and/or the
motor.

e) If any reading is less than 1 meg-ohms (M), disconnect the cabtyre cable from the motor and
Megger Test the insulation resistance of the motor itself in the same manner as above.

f) If all motor readings are more than ten (10) meg-ohms (M) it indicates the problem is in the
cable and requires immediate replacement of the Cabtyre Cable.

g) Any motor reading less than ten (10) meg-ohms (M) indicates damage in the motor in which
case the motor must be checked by a qualified repair facility.

CAUTION: It is absolutely imperative that appropriate corrective action/repair be performed before the
pump is returned to service if it does not pass the Megger Test.

Serious personal injury can result from electrical shock.

The above maintenance inspection, if it is performed regularly, will result in greatly improved pumping
efficiency and pump life.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
15

SECTION V – TROUBLESHOOTING
Problem Possible Causes & Solutions
Pump won't start. The power has not been turned on
Fuse or circuit breaker blown
The power supply is inadequate
The motor is burned out or is burning out
The cabtyre cable has been incorrectly connected.
See section on Electrical Wiring.
The cabtyre cable has been damaged and needs to
be replaced or repaired.
Pump's motor overload protection
Debris between the rotating and stationary elements
system stops the pump right after
requires cleaning
startup.
The voltage may be too low and not in accordance
to the rated voltage. (Or the cabtyre cable has been
extended with an improper gauge cable).
The power supply/frequency does not match the
pump nameplate. Replace the power supply
The motor may be faulty and need replacing, see
section on Electrical Check
Too much solid material is being sucked into the
pump. Raise the pump into clear liquid and lower
slowly into the solids
Pump requires excessive power. Specific gravity of liquid higher than design.
Viscosity of liquid differs from that for which
designed.
Total system head lower than pump design head
resulting in too much flow
For pumps without water jackets, there is insufficient
submergence for motor cooling.
Where applicable, impeller front or back axial
running clearance set too tight.
Excessive bearing lubricant or lack of cooling
causing excessive bearing temperatures.
The impeller is excessively worn and needs
Lift or discharging capacity is low.
replacement.
The discharge piping is partially clogged. Raise the
pump into relatively clear water and flush the piping.
(Avoid stopping the pump without flushing the piping
with relatively clear water)
The discharge valve closed or incorrectly set.
The discharge hose is kinked.
The suction strainer is clogged and requires
cleaning of debris. The pump may be placed on a
mounting block to reduce clogging.
The motor direction is reversed. See sections on
Electrical Wiring and Test Operation for
interchanging leads.
The pump is not completely filled with liquid or there
is an excessive amount of gas entrained in the liquid

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
16

Problem (continued) Possible Causes & Solutions


The motor shaft or bearings are worn or damaged
Excessive noise and vibration.
and need replacement.
Resonance of piping system.
Operation at low capacity.
Rust on bearings due to water getting into housing.
Brinelling of bearing races due to high ambient
vibration produced by nearby equipment or long
storage.
Insufficient grease in seal housings.
Incorrect bearing lubricant used.
Contaminated lubricant.
Impeller loose on shaft due to improper assembly.
Impeller or rotor damaged and out of balance.
One or more impeller vanes clogged
Lip Seals have short life. Shaft sleeve worn or scored at the seals.
Incorrect type of seals for operating conditions.

TED-130 Rev5
TOYO PUMPS NORTH AMERICA CORPORATION
17

SECTION VI – APPENDIX

A Model Identification
B Pump Specifications
C Performance Curves
D Motor Protection
E Pump Lubrication and Additional Maintenance
F Disassembly and Assembly Procedures
G Optional Equipment (if applicable)
H Drawings & Parts Lists

TED-130 Rev5
APPENDIX A - DPF MODEL IDENTIFICATION

TSD-367 Rev.0

Basic designation
-Below 15hp DP – XX
-15hp and above DPF – XX XX = Motor Horsepower for standard pump

Optional Motor size DPF – XX/YY XX Wet End with YY optional motor HP

Low head/High flow DPF – XXB

Guide Rail Version DPFE - XX

Options DP – XX – ZZZZ
Or DPF – XX – ZZZZ

Z= A Pressure compensated
C High temperature option (upgraded seals, bearings & class H insulation)
D Mechanical seal
G Thermistor motor protection
H High head
M Moisture sensor
Q Stainless steel
S Special
T Thermostat motor protection – standard
1 Single cable (No sensor conductors)
2 Two cable system (1 Power & 1 Sensor)

Model number examples DP-10-C


DPF-50B-CMT2
–¬ !˜P-3 to 10H HEAVY DUTY SUBMERSIBLE PUMPS SPECIFICATION SHEET
TSD-365 Rev 3

MODEL NUMBER DP-3 DP-5 DP-7.5 DP-7.5B DP-10 DP-10H

Discharge diameter - inch (mm) 3 (80) 3 (80) 3 (80) 4 (100) 4 (100) 4 (100)
Flow at rated point - Usgpm (m3/min) 130 (0.5) 130 (0.5) 130 (0.5) 260 (1.0) 260 (1.0) 208 (0.8)
Head at rated point - ft (m) 22 (7) 38 (12) 48 (15) 38 (12) 48 (15) 64 (20)
Impeller diameter - inch (mm) 7.28 (185) 8.23 (209) 9.13 (232) 9.13 (232) 9.53 (242) 10.5 (266)
Impeller - number of vanes 3 3 3 3 4 7
Max. solid size - inch (mm) 0.8 (20) 0.8 (20) 1.0 (25) 1.0 (25) 1.0 (25) 0.55 (14)
Weight without cable - lb (kg) 342 (155) 363 (165) 430 (195) 430 (195) 495 (225) 495 (225)
Standard motor hp 3 5 7.5 7.5 10 10
Optional motor hp 5 N/A 10 10 N/A N/A
Standard seal Dbl. Mech. Seal Dbl. Mech. Seal Dbl. Mech. Seal Dbl. Mech. Seal Dbl. Mech. Seal Dbl. Mech. Seal
Oil capacity - USgal (l) 0.58 (2.2) 0.58 (2.2) 0.69 (2.6) 0.69 (2.6) 0.69 (2.6) 0.69 (2.6)
Number of bearings 3 3 3 3 3 3
Speed (rpm) 1740 1740 1750 1750 1750 1750
Voltage 220 / 460 / 575 220 / 460 / 575 220 / 460 / 575 220 / 460 / 575 220 / 460 / 575 220 / 460 / 575
F.L. current 8.7 / 4.2 / 3.4 13.6 / 6.6 / 5.3 21 / 10.1 / 8.0 21 / 10.1 / 8.0 27 / 13 / 10.3 27 / 13 / 10.3
Breaker settings 10.9 / 5.3 / 4.3 17.0 / 8.3 / 6.6 26.3 / 12.6 / 10.0 26.3 / 12.6 / 10.0 33.8 / 16.3 / 12.9 33.8 / 16.3 / 12.9
Motor protector - Klixon Standard Standard Standard Standard Standard Standard
Moisture sensor + relay Optional Optional Optional Optional Optional Optional
Starting method D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L.
Motor service factor 1.35 1.35 1.35 1.35 1.35 1.35
Sensor cable (replacement type) Optional Optional Optional Optional Optional Optional
Power cable (replacement type) SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 8 SOOW 4c - 8 SOOW 4c - 8 SOOW 4c - 8
Electric cable length - ft (m) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20)
Insulation Class F F F F F F
Max. pumpage temp. STD INS. 105F 105F 105F 105F 105F 105F
Max. pumpage temp. OPT INS. 175F 175F 175F 175F 175F 175F
Max. run time motor in air 15 min 15 min 15 min 15 min 15 min 15 min
Water jacket Optional Optional Optional Optional Optional Optional
Water jacket flow rate 1-3 gpm 1-3 gpm 1-3 gpm 1-3 gpm 1-3 gpm 1-3 gpm
Shaft Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel
Pump casing STD Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron
Pump casing OPT 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome
Impeller 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome
Wear plate - top Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron
Wear plate - bottom N/A N/A N/A N/A N/A N/A
Suction cover 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome
Agitator 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome 25% Chrome
Sacrificial stub shaft N/A N/A N/A N/A N/A N/A
–¬ !˜DPF / DP HEAVY DUTY SUBMERSIBLE PUMPS - SPECIFICATION SHEET
TSD-366 Rev 2

MODEL NUMBER DPF-15 DPF-15B DPF-20 DPF-20B DPF-30 DPF-30B DPF-50 DPF-50B DPF-75 DPF-75B DP-100B DP-110B DP-150B
Discharge diameter - in (mm) 4 (100) 6 (150) 4 (100) 6 (150) 4 (100) 6 (150) 6 (150) 8 (200) 6 (150) 8 (200) 8 (200) 8 (200) 10 (250)
Flow at rated point Usgpm(m3/min) 400 (1.5) 850 (3.2) 400 (1.5) 850 (3.2) 400 (1.5) 850 (3.2) 850 (3.2) 1600 (6.0) 850 (3.2) 1600 (6.0) 1600 (6.0) 1400 (5.3) 3200 (12)
Head at rated point - ft (m) 48 (15) 25 (8) 64 (20) 32 (10) 95 (30) 48 (15) 80 (25) 48 (15) 95 (30) 92 (28) 95 (30) 128 (39) 70 (22)
Impeller diameter - inch (mm) 12.6 (320) 11.5 (290) 13.9 (353) 11.8 (300) 16.54 (420) 14.0 (358) 14.94 (380) 14.94 (380) 16.54 (420) 16.54 (420) 21.65 (550) 25 (635)
Impeller - number of vanes 3 3 2 3 2 2 3 3 3 3 3 3 2
Max. solid size - inch (mm) 1.4 (35) 2.4 (60) 1.4 (35) 2.4 (60) 1.4 (35) 2.4 (60) 2.4 (60) 2.4 (60) 2.4 (60) 2.4 (60) 2.4 (60) 2.0 (50) 4.7 (120)
Weight without cable - lb (kg) 1078 (490) 1166 (530) 1210(550) 1190(540) 1650 (750) 1610 (730) 2100 (950) 2140 (970) 2200 (1000) 2250 (1020) 5060 (2300) 5060 (2300) 7700 (3500)
Standard motor hp 15 15 20 20 30 30 50 50 75 75 100 110 150
Optional motor hp 20 20 30 30 40 40 60 or 75 60 or 75 N/A N/A N/A N/A N/A
Standard seal Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip Toyo lip
Oil capacity – Lip seal - USgal(l) 1.1 (4.1) 1.1 (4.1) 1.1 (4.1) 1.1 (4.1) 1.56 (5.9) 1.56 (5.9) 1.64 (6.2) 1.64 (6.2) 1.64 (6.2) 1.64 (6.2) 6.6 (25) 6.6 (25) 7.9 (30)
Oil capacity – Mech seal - USgal(l) 0.87 (3.3) 0.87 (3.3) 0.87 (3.3) 0.87 (3.3) 1.24 (4.7) 1.24 (4.7) 1.3 (5.0) 1.3 (5.0) 1.3 (5.0) 1.3 (5.0) N/A N/A N/A
Number of bearings 4 4 4 4 4 4 4 4 4 4 5 5 6
Speed (rpm) 1160 1160 1170 1170 1175 1175 1180 1180 1175 1175 890 885 710
Voltage 220/460/575 220/460/575 220/460/575 220/460/575 220/460/575 220/460/575 220/460/575 220/460/575 220/460/575 220/460/575 460/575 460/575 460/575
F.L. current 43/21/16 43/21/16 56/27/21 56/27/21 87/44/33 87/44/33 135/65/52 135/65/52 202/97/78 202/97/78 130/103 139/111 182/145
Breaker settings 54/26/20 54/26/20 70/34/26 70/34/26 109/55/41 109/55/41 169/81/65 169/81/65 253/121/98 253/121/98 163/129 174/139 228/181
Thermostat in windings Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard N/A
Moisture sensor + relay Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard
Starting method D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L. D.O.L.
Motor service factor 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.2 1.35
Replacement Sensor cable SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 SOOW 4c - 10 N/A
Replacement Power cable SOOW 4c - 8 SOOW 4c - 8 SOOW 4c - 8 SOOW 4c - 8 GGC 3c - 4 GGC 3c - 4 GGC 3c - 1 GGC 3c - 1 GGC 3c - 1 GGC 3c - 1 GGC 3c -2/O GGC 3c - 2/O GGC 3c -250*
Electric cable length - ft (m) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20) 65 (20)
Insulation Class F F F F F F F F F F B B B
Max pumpage temp Std 105F 105F 105F 105F 105F 105F 105F 105F 105F 105F 105F 105F 105F
Max pumpage temp Optional 175F 175F 175F 175F 175F 175F 175F 175F 175F 175F 175F 175F 175F
Max run time in air - lip seal only 15 min 15 min 15 min 15 min 15 min 15 min 15 min 15 min 15 min 15 min 15 min 15 min 15 min
Water jacket Optional Optional Optional Optional Optional Optional Optional Optional Optional Optional Optional Optional Optional
Water jacket flow rate 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm 3-5 gpm
Shaft Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel Alloy Steel
Pump casing STD Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron Ductile Iron
Pump casing OPT 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr
Impeller 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr
Wear plate - top 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr
Wear plate - bottom 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr
Suction cover Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron Cast Iron
Agitator 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr 25% Cr
Sacrificial stub shaft N/A N/A N/A N/A N/A N/A Included Included Included Included Included Included Included
*Requires modification to the packing gland
TOYO PUMPS NORTH AMERICA CORPORATION
D-1

APPENDIX D – DPF Motor Protection

For DP 3-3 to 10H-3


Circle Thermal Sensor (Klixon)
Pumps with Klixons: A bi-metallic contact attached to the
stator. If the pump motor begins to overheat the sensor will
directly disconnect the power to the motor windings.

CAUTION: These sensors will reset as the pump cools.


This will cause the pump to restart without warning.
Always lock out pump before service.

For DPF 15 - 100B


Miniature Motor Protector (Thermostat)
Pumps with thermostats: A bi-metallic contact imbedded in
each winding of the stator wired independently from the
power conductors. If the motor’s coil begins to overheat,
the sensor will trigger and open the control circuit. The
signal from this sensor is conveyed to the control panel via
the cabtyre or control cable. At the panel wiring can be
connected to warning lights or alarms or may be connected
to the starter to auto shut down the pump. Once
temperature returns to normal, the sensor automatically
resets.

RECOMMENDATION: Use a holding circuit to avoid


damage which could occur when the pump restarts after the
sensor resets.

Contact rating 13A@230VAC/5.5A@460VAC

Rev 4
TOYO PUMPS NORTH AMERICA CORPORATION
D-2

For DPF 15 – 100B


Moisture Sensor (Conductivity)

Pumps with moisture sensors: A conductivity sensor is mounted in the oil chamber of the pump. If
water leaks into the oil chamber the sensor signal can be sensed with an external relay.

Recommendation: The relay contacts should be wired to trip an alarm or light rather than a motor shut
down. This is because shutdown of the pump during heavy slurry operation can plug the pipeline.

Once this sensor is tripped, maintenance should be scheduled within 1 or 2 days to replace the lower
seals, shaft sleeve and possibly the lower bearing. Note: An induced current can also set off the
sensor, so it is necessary to configure the control panel to only halt operation only after the sensor has
been signaled for several seconds.

Sensor Parameters:
No moisture present: Open Circuit
Moisture present: 2 to 20 kOhms

10mm gap
Relay Contact rating: 5A resistive at 240VAC

Moisture Sensor Relay Wiring (ABB LLC5AA): (Suggested wiring, customer may use alternate)

Rev 4
TOYO PUMPS NORTH AMERICA CORPORATION
E-1

APPENDIX E – DPF Pump Lubrication and additional Maintenance

CAPACITY MAINTENANCE

The amount of liquid being pumped will lessen as wear occurs between the faces of the impeller and the
impeller disc. To maintain full pump capacity, the impeller clearance must be adjusted periodically. Each
application is different and it is necessary to determine the amount of wear for a certain time limit before setting
up a schedule for adjustment.

1. Remove the agitator and strainer.


2. Clean wet end internally
3. Measure the gap between the impeller and impeller disc (Nominal gap is 1mm (0.040”)).
4. Loosen the impeller disc set nuts.
5. Turn impeller clearance adjusting bolts to move the impeller disc up until it touches the impeller. Turn
the bolts in the opposite direction ¾ turn to lower the suction cover approximately 0.04" (1 mm) and
tighten impeller disc set nuts. This resets the recommended operating clearance.

MOISTURE SENSOR (IF APPLICABLE)


If moisture sensor is tripped, go through normal shutdown procedure then immediately check the oil reservoir
per instructions below. Replace the shaft seals as necessary.

LUBRICANT CHECK

Check lubrication oil level in oil reservoir at least every 500 operating hours or monthly. Set the pump
horizontally on appropriate wooden blocks with one of the oil covers facing up. Remove the oil cover and angle
the pump allowing some oil to drain slightly to check for its consistency.

CAUTION: Be aware of the pump’s weight and centre of gravity when moving to prevent serious accidents or
damage.

If the oil is m ilky white or has water mixed in with it replace th e oil with type and quan tity as follows. Check
oil within a few days to confirm oil is still clear. If the oil is cloudy, the pum p may require disassembly for
replacement of the shaft seal. Contact Toyo for technical assistance.

Inspect seal on oil cover and replace if damaged.

If the oil level is low top up the oil with type per table. Check oil within a few days to confirm oil level, if level
is again low the pump may have to be disassembled to replace seals. Contact Toyo for technical assistance.

Rev 1
TOYO PUMPS NORTH AMERICA CORPORATION
E-2

OIL REPLACEMENT
1. Set the pump horizontally on appropriate wooden blocks with one of the oil covers facing up. Remove
both oil covers and drain oil.

Note: Used oil should be appropriately disposed of by waste disposal contractors in compliance with
local regulations.

2. If water (milky white oil) and sludge have contaminated the oil reservoir, check the shaft seals and
lower bearing and replace as necessary.

3. Replace the seal on the oil covers and install the lower cover

4. Re-fill the oil to the quantity in the table.

Pump Model DP 3, 5 DP 7.5, DPF 15, 20, DPF 30, 30B DPF 50, DPF 100B
7.5B, 10 20B 50B,75, 75B
10H
Lip seal Not Not 4.1 liters 5.9 liters 6.2 liters 25 liters
option applicable applicable (1.1 US Gal) (1.56 US Gal) (1.6 US Gal) (6.6 US Gal)
Mechanical 2.2 liters 2.6 liters 3.3 liters 4.7 liters 5.0 liters 25 liters
seal option (0.58 US Gal) (0.69 US Gal) (0.87 US Gal) (1.24 US Gal) (1.3 US Gal) (6.6 US Gal)

5. Use the following oils:

Pumps with lip seals ISO Grade #100 turbine oil (or non-detergent
SAE 30 if turbine oil unavailable)
Pumps with mechanical seals ISO Grade #32 turbine oil (or non-detergent
SAE 10 if turbine oil unavailable)

6. If pump is run intermittently, the oil reservoir should be examined more often.

7. If the pump has not been operated for a long period of time, the oil reservoir should be examined
shortly after startup to ensure there has been no deterioration of seals.

BEARING GREASE LUBRICATION


Toyo pumps are properly greased at the time of manufacture. Every 1000 operating hours or if the pump has
been stored for 6 months or more lubricate the motor bearings with premium quality grease using a standard
hand held grease gun.

Grease nipples for the top and bottom bearings are behind plugs. Inspect the plug o-ring seal and replace if
damaged before replacing the grease inlet plugs.

Recommended Grease: SKF LGHP 2


Chevron SRI Grease NLGI 2

Pump Model DP 3 to 10H DPF 15 to 30 DPF 50 to 75 DPF 100 to 150


Grease quantity Grease during assembly 2 to 3 strokes 4 to 5 strokes 6 to 10 strokes

Rev 1
TOYO PUMPS NORTH AMERICA CORPORATION
F-1

APPENDIX F – DPF / DPF-A Pump Assembly and Disassembly Procedure

Use a location that is dry and dust free. Prepare several small boxes for disassembled small parts, plus rags,
chain block or crane, solvent and tools.

NOTE: For models DPF-15 to DPF-75B the numbers marked with ( ) in the following descriptions
correspond to the part numbers in the exploded view drawings. For model DP-100B and 150B use the
applicable construction drawing number which may be slightly different.

F-A DISASSEMBLY OF LEAD INLET – FOR CABLE CHANGE


1. Remove cap nuts (1) and take off the lead cover (8).

2. To detach the power leads of the cabtyre cable (7, 9) from the motor lead wire, take off the vinyl tape
and the insulation tape and remove the connecting screw with a screwdriver.

3. The cabtyre cable (7, 9) is fixed with epoxy resin inside the lead cover (8). Remove by drilling holes
in the epoxy to weaken it then break it up with a screwdriver or chisel.

4. Remove the packing gland (3, 11) by removing the cap nuts (14, 106).

5. Remove the rubber packing (4, 12), packing set ring (5, 13), cable protection tube (6, 10) and packing
gland from the cabtyre cable.

6. For DPF-A pumps only, the cabtyre cable (7, 9) is fixed with epoxy resin and a jelly like encapsulant
inside the upper cover (16). For repairing motor, remove the gel resin and epoxy by drilling holes to
weaken it then break it up with a screwdriver or chisel.

F-B DISASSEMBLY OF WET END


1. The agitator (81) is threaded on the shaft; therefore remove it by tapping it counterclockwise as
viewed from the strainer end. Use caution when tapping the vanes as they are hard and brittle –
WEAR EYE PROTECTION.

2. Remove the set bolts (79) and take off the strainer (80).

3. Remove the cap nuts (69) and take off the suction cover (74) with the impeller disc (73).

4. Remove the impeller nut (83) by using a wrench. For DPF 50 and DPF 75 remove extension shaft
(84).

5. Pull the impeller (72) off the shaft and remove the key (55).

6. Remove cap nuts (67 & 69) and remove the casing (56) and delivery cover (71).

F-C DISASSEMBLY OF SHAFT SEAL – LIP SEAL OPTION


Refer to exploded view drawings for oil chamber and lip seal.

1. Remove the set bolt (21) and take off the oil inlet cover (66), then drain the oil.

Rev 3
TOYO PUMPS NORTH AMERICA CORPORATION
F-2
2. Remove the set bolts (35 or 87) and take off the oil seal housing B (61).

3. Remove the distance sleeve (54), o-ring (53) and shaft sleeve B (51) from the shaft.

4. Remove the set bolts (64) and the oil chamber (60) with the bearing lock plate B (48).

5. Remove set bolts (59), bearing set plate (46) and remove the bearing (47).

6. Remove the bearing sleeve (45), set bolts (35) and oil seal housing A (58).

7. Remove the o-ring (40), and shaft sleeve A (44) from shaft.

8. Remove the oil seals and the Rareflon seals from both oil seal housings.

Typical Lip Seal Arrangement 40 O-ring


41 Oil Seal A
42 Space Ring A
43 Rareflon Seal A
49 Oil Seal B
50 Space Ring B
52 Rareflon Seal B
53 O-Ring

F-D DISASSEMBLY OF SHAFT SEAL – MECHANICAL SEAL OPTION


Standard Light Duty Type

Refer to exploded view drawings for oil chamber and mechanical seal.

1. Remove the set bolt (21) and take off the oil inlet cover (66), then drain the oil.

2. Remove the set bolts (87) and take off the oil seal housing B (61).

3. Remove the set bolts (87) and take off the mechanical seal housing (49).

4. Remove the shaft sleeve C (54), o-ring (53), shaft sleeve B (51) and collar (48) from the shaft.

5. Remove set bolts (64) and remove the oil chamber cover (60).

6. Remove set bolts (59), bearing set plate (46) and remove the bearing (47).

7. Remove the bearing sleeve (45), set bolts (35) and oil seal housing A (58).

8. Remove the o-ring (40), and shaft sleeve A (44) from shaft.

9. Remove the mechanical seal, oil seal and Rareflon seal from each housing.

Rev 3
TOYO PUMPS NORTH AMERICA CORPORATION
F-3

Standard Light Duty Mechanical Seal Arrangement

1 Coil Spring
2 Drive Ring
3 Bellows
4 Case
5 Seal Ring
6 Washer
7 Mating Ring
8 O Ring
9 Packing

Heavy Duty Type (For DPF 50 / 50B / 75 / 75B)

Refer to exploded view drawing (C10205) for oil chamber and mechanical seal.

1. Remove the set bolts (21) and take off the oil inlet cover (66), then drain the oil. Remove the pump
wet end.

2. Pull the mechanical seal rotating assembly (711) from the shaft. Ensure that the o-ring located in the
inner diameter of the rotating assembly is not damaged while running over the shaft external thread.

3. Remove the bolts (040.2) in order to pull the mechanical seal stationary assembly, along with the
mechanical seal shaft sleeve.

4. Remove the bolts (040) in order to pull the stationary seal face flange (721) with the mechanical seal
stationary assembly still attached, along with the bearing (47), the stop ring (030), and bearing sleeve
(363).

F-E DISASSEMBLY OF MOTOR SECTION


1. With the wet end removed turn the pump upside down.

2. Remove the under-cover side cap nuts (32) from the under-cover (37).

3. Remove the shaft and bearing parts together by lifting the under-cover (37) out of the (28) motor case.

4. Remove the hex bol ts (35), take off the bearing cover B (34) and remove the under-cover from the
shaft.

5. Remove bearings (38, 39) from shaft and under-cover (37). A puller will be required.

6. Remove the upper-cover side cap nuts (32) and separate motor case (28) from upper-cover (16).

7. Remove set bolts (90) and bearing cover A (26).

8. Remove bearing (23) from upper-cover (16).

9. Remove oil seal (25) from bearing cover A.

Rev 3
TOYO PUMPS NORTH AMERICA CORPORATION
F-4

INSPECTION AND PARTS REPLACEMENT GUIDELINES


1. Impeller: Replace if impeller shows excessive erosion, corrosion, extreme wear, or vane breakage.
Key-way and impeller hub must be in good condition. Reduction in hydraulic performance may be
caused by excessive impeller wear especially on the bottom mating face. Replace if impeller
adjustment is gone.

2. Suction Cover: Replace if impeller mating surface is worn.

3. Shaft Sleeve: Sleeve surface must be smooth. If hard f acing has been worn through to base metal or
if badly grooved or cut, replace.

4. Delivery Cover: Replace if worn.

5. Bearings: Replace if worn, loose, rough or noisy when rotated.

6. Oil Seals: Replace if worn or otherwise damaged, or in conjunction with shaft sleeve replacement.

7. Packing and O-Rings: Replace.

8. General: All parts should be clean before assembly. All burrs should be removed.

F-F SUBMERSIBLE PUMP REASSEMBLY


In general, reassembly is a reversal of the disassembly procedures; however, take note of the following items.

1. Bearings:
- Shrink fit for inner races on shaft - the maximum oil or induction heating temperature should be
120oC. Ensure the bearing inner race is tight against the shoulder on the shaft after cooling.
- Press fit for outer races into a shell – Apply gentle pressure evenly around the bearing race, it is
recommended to use a jig for this.
- Pack the bearings with grease – see lubrication section

2. Oil Seal and Rareflon Seal Installation:


- Use care to ensure the seal lips are not damaged during installation
- Use a thin coat of RTV on seal housing to seal shell of lip seals.
- Insert seals into the housing with a jig to apply even force around the seal. Do not apply
unbalanced force or hammer the seals. If the seals are deformed they will be destroyed.
- Pack the lip seals with grease.

Install the shaft sleeve onto the shaft with the chamfered end towards the o-ring where applicable.
Apply a coating of grease onto the sleeve, then slide the seal housing with seals installed onto the shaft
sleeve.

WARNING:
Do not insert the shaft sleeve onto the shaft after the seal housing is already installed. This will
immediately destroy the seals.

Check for seal leakage by applying pressure (about 15 psi) to the oil inlet hole to confirm zero
pressure loss over 1 minute.

Rev 3
TOYO PUMPS NORTH AMERICA CORPORATION
F-5
3. Mechanical seal:
Standard Light Duty Type
- Follow the procedures above for Oil seal installation as well as the following
- Apply turbine oil to the sliding surfaces of the seal and the floating seat.
- Put spring on mechanical seal.
- Slide shaft sleeve “B” (51) through the upper mechanical seal face (the part with rubber sleeve
inside). Shaft Sleeve “B” flat end faces towards bearing collar (48). Install this as an assembly
onto the shaft.
- Install lower seal face (gray colo r with “U” shaped undercut on it) into housing (49). Undercut to
face motor.
- Put rubber gasket and metal plate (included in mechanic seal kit) over mechanical seal face, make
sure that notch on the metal plate matches undercut on seal face
- Put o-ring (62) and o-ring (93) on housing (49) as shown on drawing
- Install this sub-assembly on the pump using bolts (87A) and lock washers (87B)
- Press lip seals (41) and space ring “A” (42) into oil seal housing “B” ( 61). Lip seals facing down
towards wet end.
- Install o-ring (53) on shaft inside tapered area of shaft sleeve “B”. Slide shaft sleeve “C” (54) onto
shaft, sleeve flat end faces wet end.
- Install lip seal housing (Item 61) with seals installed onto shaft sleeve C (54). Fasten with bolts
(87A) and lock washers (87B)
Vacuum test (-10in H2O) or pressure test (5 psi max.) oil chamber for 15 minutes. If pressure does
not decay, mechanical seal is successfully installed.
Refill the oil chamber and reinstall the pump wet end.
Heavy Duty Type (See drawings C10205, A7844 and A7887)
- Follow the procedures above for Oil seal installation as well as the following.
- Place the o-ring (062.2) to the o-ring groove of the shaft sleeve (707).
- Install the bearing (47), the stop ring (030), and bearing sleeve (363) into the stationary seal face
flange (721). Place the o-ring (062.1) to the shoulder diameter of the stationary seal face flange.
- Bolt the stationary seal face flange (721) to the undercover (37).
- Slide the mechanical seal shaft sleeve over the shaft.
- Bolt the mechanical seal stationary assembly into the stationary seal face flange (721). Ensure that
the mechanical seal stationary assembly o-ring is installed and properly lubricated.
- Insert o-ring installation tool into the mechanical seal rotating assembly (711) and slide the rotating
assembly over the shaft. Push mechanical seal rotating assembly past the o-ring installation tool
and into place.
- Install impeller, impeller collar and impeller nut (from wet end) and compress mechanical seal
with impeller nut until tight.
Vacuum test (-10in H2O) or pressure test (5 psi max.) oil chamber for 15 minutes. If pressure does
not decay, mechanical seal is successfully installed.
Refill the oil chamber and reinstall the pump wet end.
4. Epoxy Resin: If the electrical cable sealing inside the lead cover has been dam aged, remove the
sealing compound and replace it with Epoxylite E805-35 Black Transformer Potting Resin. Hardening
time is 24 hours at 25oC (77oF) or at least 4 hours at 60oC (140oF). Before potting expose 5 to 10mm
of each conductor to allow the epoxy to penetrate the conductors. The exposed conductors must be
fully embedded in the epoxy and spaced equally from each other and the housing.

Rev 3
TOYO PUMPS NORTH AMERICA CORPORATION
F-6
5. Resin: For DPF-A pump, if the electrical cable sealing inside the upper cover has been dam aged,
remove the sealing compound and replace it with th e epoxy resin and Sumitomo 3M No. 4441J Resin
(jelly like encapsulant). See appendix G for DPF-A lead cover details.

6. Oil Reservoir: Fill the oil chamber with ISO grade #32 turbine oil for mechanical seal pumps and ISO
Grade #100 oil for lip seal pumps. See lubrication section for oil capacity.

7. Impeller Clearance: Adjust the clearance between the impeller and t he impeller disc to 0.040" t o
0.060” (1 to 1.5mm) with the adjust and set bolts in the suction cover.

F-G INSTALLTION OF PUMP WITH GUIDE-RAIL


1. In order to install a pipe perpendicularly, please check the position of bend, referring to an outline
dimension.
2. Install the bend to the bottom of a pit. Be careful and do not dam age the connection surface of the
bend.
3. Install a pipe to the guide lug of the bend. Install the upper part of pipes to the guide lug of the guide
support.
4. Make sure the guide pipes are installed perpendicularly.
5. Fix the guide support.
6. Connect a discharge pipe to the bend and attach piping.
7. When the pit is deep and long guide is required, it is necessary to install in termediate support. The
supports are usually attached every 2 meters. Refer to the general arrangement if provided.
8. Intermediate support is attached to the discharge pipe and guide pipes by welding. If t he user makes
his own i ntermediate support, please attach the intermediate support in less than 90º outside of the
guide pipe.

The pump to be
slig htly tilted forward

9. Lower the pump slowly along the pipes. The pump is connected automatically to the bend.
10. When the pump is connected to the bend, m ake sure they are properly attached as shown. The
turnbuckle of a chain is used to adjust the pum p position. If they are connect ed incorrectly, a crevice
would be made in a connection surface and cause premature wear.

Correct Incorrect Completion of connection

11. Check whether a connection is normal and check that the cable is not caught on the pump.

Rev 3
TOYO PUMPS NORTH AMERICA CORPORATION
G-1

APPENDIX G – DPF Pressure compensated Pumps

GENERAL

The accumulator option is available on DPF pum ps for pressure compensation. (Pressure com pensation is
generally utilized on deep subm ergence applications where the subm ergence pressure acting on the seal box
and bearing housing is signifi cant – Depths over 150 feet). The accum ulators balance internal and external
pressures and maintain structural integrity as well as effective sealing from the pumpage.

Two accumulators are typically used, one accumulator on the motor housing and one on the seal oil chamber.

Mounting of Seal Oil Chamber Accumulator Mounting of Motor Chamber Accumulator

INITIAL FILLING

The motor housing (upper reservoir) can be filled through the oil inlet cover located on the upper cover. Fill
completely or until oil runs out of the upper fill plug lo cated on the top of the accumulator. Fill the accumulator
bladder through the second fill plug. The oil level is es tablished with pump in vertical position and oil level
completely topped up at the fill plugs.

The seal oil chamber (lower reservoir) is filled in the same manner except that the initial seal chamber fill is
performed with the pump on its side. Fill oil cham ber through the oil inlet cover. Fill accumulator bladder and
top up through upper fill plugs.

MAINTENANCE FILLING

Periodic top up of the accumulators will be required. A sm all amount of leakage across the seal can be
expected. If the bladder in the accumulators is noticeably deform ed, replenish the oil through fill plug. An oil
inspection plug is located at the lower hose connection from the accumulator.

Rev 1
TOYO PUMPS NORTH AMERICA CORPORATION
G-2

Accumulator Lead Inlet

LUBRICATION

The oil used in these pumps is Turbine Oil ISO VG56.

Pressure compensated pumps


Pump Model Seal oil Motor Accumulator volume
DPF- volume Housing
volume Seal Motor
15-A to 15B-A 4.1 11.7 2.7 2.7
20-A to 20B-A 4.1 16.0 2.7 2.7
30-A to 30B-A 5.9 20.5 2.7 2.7
50-A to 50B-A 6.2 27.1 2.7 4.5
75-A to 75B-A 6.2 27.8 2.7 4.5
All quantities in litres

Rev 1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
PARTS LIST - DPF-15/15B-MT2
Ref. Dwg. No. A7283 Rev.0 to A7285 Rev.0 TPSD-001 Rev.0
Please use the part number when ordering. Effective: April 15, 2005
REF # PART # DESCRIPTION QTY
1A 01890 Bolt, stud 4
1B 01389 Washer, spring 4
1C 02014 Nut, dome 4
KIT ** 2 02800 O-ring 1
CA 3 03438 Gland, packing 1
CA ** 4 03498 Packing 3
CA ** 5 03499 Set ring, packing 1
CA 6 03500 Tube, cable protection 1
CA 7A 08614 Cable, power 20m
7B 18572 Clamp, cable 1set
CA 8 18509 Cover, lead 1
CA 9A 04525 Cable, moisture sensor 20m
9B 18649 Terminal, press 4
9C 20386 Terminal, press 1
9D 19920 Terminal, sleeve 4sets
9E 19190 Clamp, cable 1set
CA 10 03404 Tube, cable protection 1
CA 11 03405 Gland, packing 1
CA ** 12 03407 Packing 3
CA ** 13 03406 Set ring, packing 1
CA 14A 01402 Bolt, stud 2
CA 14B 02046 Washer, spring 2
CA 14C 02013 Nut, dome 2
16 20442 Cover, upper 1
18 18502 Plate, distance 1
KIT ** 19 02804 O-ring 2
KIT ** 20 18643 O-ring 2
21 01746 Bolt, set 8
22 18617 Nipple, grease 2
** 23 00673 Bearing, cylindrical roller 1
** 24 03557 Ring, seal A 1
** 25 02642 Seal, lip 2
26 20447 Cover, bearing A 1
27 18660 Bolt, lubrication 1
28 20446 Case, motor 1
29 25879 Shaft 1
30 20448 Assembly, shaft & rotor 1
31 20446 Assembly, stator & motor case 1
32A 16526 Bolt, stud 12
32B 01389 Washer, spring 24
32C 02014 Nut, dome 24
32D 01694 Bolt, adjust 4
** 33 03511 Ring, seal B 1
34 19704 Cover, bearing B 1
35A 01675 Bolt, set 18
35B 01392 Washer, spring 18
35C 03170 Bolt, adjust 2

1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
PARTS LIST - DPF-15/15B-MT2
Ref. Dwg. No. A7283 Rev.0 to A7285 Rev.0 TPSD-001 Rev.0
Please use the part number when ordering. Effective: April 15, 2005
REF # PART # DESCRIPTION QTY
36 18660 Bolt, lubrication 1
37 19705 Cover, under 1
** 38 00634 Bearing, ball deep groove 1
** 39 00697 Bearing, thrust 1
KIT ** 40 14607 O-ring 1
SRK ** 41 02679 Seal, lip 1
42 03515 Ring, space A 1
SRK ** 43 02540 Seal, rareflon 1
SRK ** 44 18601 Sleeve, shaft A 1
** 45 19181 Sleeve, bearing 1
46 18600 Plate, bearing set 1
SRK ** 47 00631 Bearing, ball deep groove 1
** 48 03519 Plate, bearing lock 1
SRK ** 49 02651 Seal, lip 3
50 03520 Ring, space B 4
SRK ** 51 03521 Sleeve, shaft B 1
SRK ** 52 02393 Seal, rareflon 2
KIT ** 53 02547 O-ring 1
** 54 03522 Sleeve, distance 1
** 55 03523 Key 1
* 56 03524 Casing (DPF15) 1
* 56 03525 Casing (DPF15B) 1
KIT ** 57 02796 O-ring 1
58 03527 Housing, oil seal A 1
59A 01714 Bolt, set 6
59B 02044 Washer, spring 6
60 18495 Cover, oil chamber 1
61 19703 Housing, oil seal B 1
KIT ** 62 18632 O-ring 1
KIT ** 63 02801 O-ring 1
64A 01686 Bolt, set 6
64B 02046 Washer, spring 6
64C 01683 Bolt, adjust 2
KIT ** 65 18644 O-ring 2
66 20389 Cover, oil inlet 2
67A 16526 Bolt, stud 4
67B 01389 Washer, spring 4
67C 02014 Nut, dome 4
67D 01694 Bolt, adjust 2
KIT ** 68 02806 O-ring 1
69A 16526 Bolt, stud 16
69B 01389 Washer, spring 16
69C 02014 Nut, dome 16
69D 01691 Bolt, adjust 4
* 70 03531 Bend (DPF15) 1
* 70 03532 Bend (DPF15B) 1
* 71 18500 Cover, delivery 1
* 72 03534 Impeller, 60 Hz (DPF15) 1

2
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
PARTS LIST - DPF-15/15B-MT2
Ref. Dwg. No. A7283 Rev.0 to A7285 Rev.0 TPSD-001 Rev.0
Please use the part number when ordering. Effective: April 15, 2005
REF # PART # DESCRIPTION QTY
* 72 03535 Impeller, 60 Hz (DPF15B) 1
* 73 03536 Disc, impeller (DPF15) 1
* 73 03537 Disc, impeller (DPF15B) 1
* 74 03538 Cover, suction (DPF15) 1
* 74 03539 Cover, suction (DPF15B) 1
75 03540 Plate, strainer (DPF15) 1
75 03541 Plate, strainer (DPF15B) 1
76A 01890 Bolt, stud (DPF15) 4
76A 01877 Bolt, stud (DPF15B) 4
76B 01389 Washer, spring (DPF15) 4
76B 02046 Washer, spring (DPF15B) 4
76C 02014 Nut, dome (DPF15) 4
76C 02013 Nut, dome (DPF15B) 4
KIT ** 77 02806 O-ring 1
78A 18616 Bolt, flat head 6
78B 01392 Washer, spring 6
78C 01391 Nut 6
79A 01686 Bolt, set 4
79B 02046 Washer, spring 4
80 03542 Strainer (DPF15) 1
80 03543 Strainer (DPF15B) 1
* 81 03544 Agitator 1
** 82 03545 Collar, impeller 1
** 83 05968 Nut, impeller 2
85 01758 Bolt, adjust 4
89 02053 Bolt, eye 2
90A 01670 Bolt, set 6
90B 02045 Washer, spring 6
91A 01833 Bolt, stud (DPF15) 8
91A 01845 Bolt, stud (DPF15B) 8
91B 02032 Washer, spring(DPF15) 8
91B 02042 Washer, spring (DPF15B) 8
91C 01787 Nut (DPF15) 8
91C 01788 Nut (DPF15B) 8
* 92 03205 Packing, plate (DPF15) 1
* 92 03207 Packing, plate (DPF15B) 1
94A 19621 Terminal, press 8
94B 08860 Terminal, press 3
95A 01772 Bolt, set 1
95B 01431 Washer 1
96 03470 Nipple, hose (DPF15) 1
96 03549 Nipple, hose (DPF15B) 1
* 97 03206 Packing, plate (DPF15) 1
* 97 03208 Packing, plate (DPF15B) 1
98A 01583 Bolt, set (DPF15) 8
98A 01708 Bolt, set (DPF15B) 8
98B 01389 Washer, spring (DPF15) 8
98B 01395 Washer, spring (DPF15B) 8
98C 01388 Nut (DPF15) 8
98C 01394 Nut (DPF15B) 8

3
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
PARTS LIST - DPF-15/15B-MT2
Ref. Dwg. No. A7283 Rev.0 to A7285 Rev.0 TPSD-001 Rev.0
Please use the part number when ordering. Effective: April 15, 2005
REF # PART # DESCRIPTION QTY
100A 01771 Bolt, set 3
100B 01431 Washer 3
100C 01803 Nut 3
CA 106A 01877 Bolt, stud 2
CA 106B 02046 Washer, spring 2
CA 106C 02013 Nut, dome 2
107 01387 Bolt, eye 1
122A 20444 Sensor, moisture 1set
122B 20445 Cable
CA 10829 Assembly, cable (std length 20m) 1set
** KIT 12897 Kit, o-ring 1set
Kit, seal repair (includes items 40, 53,
** SRK 12903 1set
57, 62, 63 & 68)

4
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF20-MT2 & DPF20B-MT2
Ref. Dwg. No. A6855 Rev.0, A6856 Rev.0 & A6822 Rev.0 TPSD-005 Rev.0
Please use the part number when ordering. Effective: July 27, 2009

REF # DESCRIPTION QTY

1A 01890 Bolt, stud 4


1B 01389 Washer, lock 4
1C 02014 Nut, dome 4
KIT ** 2 02800 O-ring 1
CA 3 03438 Gland, packing 1
CA ** 4 03498 Packing, rubber 3
CA * 5 03499 Ring, packing set 1
CA 6 03500 Tube, cable protection 1
CA 7A 08614 Cable, power 20m
7B 18572 Clamp, cable 1set
CA 8 18509 Cover, lead 1
CA 9A 04525 Cable, moisture sensor 20m
9B 18649 Terminal, press 4
9C 20386 Terminal, press 1
9D 19920 Terminal, sleeve 4sets
9E 19190 Clamp, cable 1set
CA 10 03404 Tube, cable protection 1
CA 11 03405 Gland, packing 1
CA 12 03407 Packing 3
CA 13 03406 Ring, packing set 1
CA 14A 01402 Bolt, stud 2
CA 14B 02046 Washer, spring 2
CA 14C 02013 Nut, dome 2
16 20442 Cover, upper bearing 1
18 18502 Plate, distance 1
KIT ** 19 02804 O-ring 2
KIT ** 20 18643 O-ring 2
21 01746 Screw, hexagon head 8
22 18617 Nipple, grease 2
** 23 00673 Bearing, deep groove ball 1
** 24 03557 Ring, seal A 1
** 25 02642 Seal, lip 2
26 20447 Cover, bearing A 1
27 18660 Bolt, lubrication 1
28 18602 Case, motor 1
29 22970 Shaft 1
30 19278 Assembly, shaft & rotor 1

PAGE 1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF20-MT2 & DPF20B-MT2
Ref. Dwg. No. A6855 Rev.0, A6856 Rev.0 & A6822 Rev.0 TPSD-005 Rev.0
Please use the part number when ordering. Effective: July 27, 2009

REF # DESCRIPTION QTY

31 18602 Assembly, stator & motor case, 460V 1


32A 16526 Bolt, stud 12
32B 01389 Washer, lock 24
32C 02014 Nut, dome 24
32D 01694 Screw, hexagon head 4
** 33 03511 Ring, seal B 1
34 19704 Cover, bearing A 1
35A 01675 Screw, hexagon head 18
35B 01392 Washer, lock 18
35C 03170 Screw, hexagon head 2
36 18660 Bolt, lubrication 1
37 20443 Cover, under (DPF20) 1
37 19705 Cover, under (DPF20B) 1
** 38 00634 Bearing, deep groove ball 1
** 39 00697 Bearing, thrust 1
KIT ** 40 14607 O-ring 1
SRK ** 41 02679 Seal, lip A 1
42 03515 Ring, space 1
SRK ** 43 02540 Seal, lip A 1
SRK ** 44 18601 Sleeve, shaft A 1
45 19181 Sleeve, bearing 1
46 18600 Plate, bearing set 1
SRK ** 47 00631 Bearing, deep groove ball 1
** 48 03519 Plate, bearing lock B 1
SRK ** 49 02651 Seal, lip B 3
50 03520 Ring, space B 4
SRK ** 51 03521 Sleeve, shaft B 1
SRK ** 52 02393 Seal, lip B 2
KIT ** 53 02547 O-ring 1
** 54 03522 Sleeve, distance 1
** 55 03523 Key 1
* 56 03582 Casing, vortex (DPF20) 1
* 56 03525 Casing, vortex (DPF20B) 1
KIT ** 57 02796 O-ring 1
58 03527 Seal, lip housing A 1
59A 01714 Bolt, set 6
59B 02044 Washer, spring 6
60 18495 Cover, oil chamber 1

PAGE 2
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF20-MT2 & DPF20B-MT2
Ref. Dwg. No. A6855 Rev.0, A6856 Rev.0 & A6822 Rev.0 TPSD-005 Rev.0
Please use the part number when ordering. Effective: July 27, 2009

REF # DESCRIPTION QTY

61 19703 Seal, lip housing B 1


KIT ** 62 18632 O-ring 1
KIT ** 63 02801 O-ring 1
64A 01686 Screw, hexagon head 6
64B 02046 Washer, lock 6
64C 01683 Screw, hexagon head 2
KIT ** 65 18644 O-ring 2
66 20389 Cover, oil inlet 2
67A 16526 Bolt, stud 4
67B 01389 Washer, lock 4
67C 02014 Nut, dome 4
67D 01694 Screw, hexagon head 2
KIT ** 68 02787 O-ring (DPF20) 1
KIT ** 68 02806 O-ring (DPF20B) 1
69A 16526 Bolt, stud 16
69B 01389 Washer, lock 16
69C 02014 Nut, dome 16
69D 01691 Screw, hexagon head 4
70 03531 Bend (DPF20) 1
70 03532 Bend (DPF20B) 1
* 71 18511 Delivery cover (DPF20) 1
* 71 18500 Cover, delivery (DPF20B) 1
* 72 03591 Impeller (DPF20, 60hz) 1
* 72 03592 Impeller (DPF20B, 60hz) 1
* 73 03711 Disc, impeller (DPF20) 1
* 73 03537 Disc, impeller (DPF20B) 1
* 74 03596 Cover, suction (DPF20) 1
* 74 03539 Cover, suction (DPF20B) 1
75 19632 Plate, strainer (DPF20) 1
75 03541 Plate, strainer (DPF20B) 1
76A 16526 Bolt, stud (DPF20) 4
76A 01877 Bolt, stud (DPF20B) 4
76B 01389 Washer, lock (DPF20) 4
76B 02046 Washer, lock (DP20B) 4
76C 02014 Nut, dome (DPF20) 4
76C 02013 Nut, dome (DPF20B) 4
KIT ** 77 02787 O-ring (DPF20) 1
KIT ** 77 02806 O-ring (DPF20B) 1
78A 18616 Screw, flat head 6

PAGE 3
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF20-MT2 & DPF20B-MT2
Ref. Dwg. No. A6855 Rev.0, A6856 Rev.0 & A6822 Rev.0 TPSD-005 Rev.0
Please use the part number when ordering. Effective: July 27, 2009

REF # DESCRIPTION QTY

78B 01392 Washer, lock 6


78C 01391 Nut 6
79A 01686 Screw, hexagon head 4
79B 02046 Washer, lock 4
80 03600 Strainer (DPF20) 1
80 03543 Strainer (DPF20B) 1
* 81 03544 Agitator 1
* 82 03545 Collar, impeller 1
* 83 05968 Nut, impeller 2
85 01618 Screw, hexagon head (DPF20) 4
85 01752 Screw, hexagon head (DPF20B) 4
89 02053 Bolt, eye 2
90A 01670 Bolt, set 6
90B 02045 Washer, spring 6
91A 18666 Bolt, stud (DPF20) 8
91A 01845 Bolt, stud (DPF20B) 8
91B 02032 Washer, lock (DPF20) 8
91B 02042 Washer, lock (DPF20B) 8
91C 01787 Nut (DPF20) 8
91C 01788 Nut, dome (DPF20B) 8
KIT * 92 03205 Packing, plate (DPF20) 1
KIT * 92 03207 Packing, plate (DPF20B) 1
94A 19621 Terminal, press 8
94B 08860 Terminal, press 3
95A 01772 Screw, hexagon head 1
95B 01431 Washer 1
96 03470 Nipple, hose (DPF20) 1
96 03549 Nipple, hose (DPF20B) 1
* 97 03206 Packing, plate (DPF20) 1
* 97 03208 Packing, plate (DPF20B) 1
98A 01583 Screw, hexagon head (DPF20) 8
98A 01708 Screw, hexagon head (DPF20B) 8
98B 01389 Washer, lock (DPF20) 8
98B 01395 Washer, lock (DPF20B) 8
98C 01388 Nut (DPF20) 8
98C 01394 Nut (DPFB) 8
100A 01771 Screw, hexagon head 3
100B 01431 Washer 3
100C 01830 Nut 3
CA 106A 01877 Bolt, stud 2
CA 106B 02046 Washer, lock 2
CA 106C 02013 Nut, dome 2
106D 01683 Bolt, adjust 2
107 01387 Bolt, eye 1

PAGE 4
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF20-MT2 & DPF20B-MT2
Ref. Dwg. No. A6855 Rev.0, A6856 Rev.0 & A6822 Rev.0 TPSD-005 Rev.0
Please use the part number when ordering. Effective: July 27, 2009

REF # DESCRIPTION QTY

122A 20444 Sensor, moisture 1set


122B 20445 Cable
CA 10747 Assembly, cable (std length 20m) 1set
** KIT 12898 Kit, O-Ring 1set
** SRK 12904 Kit, Seal Repair (Includes O-Ring kit) 1set

PAGE 5
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY

PARTS LIST - DPF30-MT2 & DPF30B-MT2


Ref. Dwg. No. A7261 Rev.0 to A7263 Rev.0 TPSD-006 Rev.0
Please use the part number when ordering. Effective: April 12, 2006
REF # New Part # DESCRIPTION QTY
1A 01877 Bolt, stud 6
1B 02046 Washer, lock 6
1C 02013 Nut, dome 6
1D 01683 Screw, hexagon head 2
KIT ** 2 02821 O-ring 1
CA 3 25878 Gland, packing 1
CA ** 4 03670 Packing, rubber 3
CA ** 5 03671 Packing, set ring 3
CA 6 03672 Tube, cable protection 1
CA 7A 08066 Cable, power 20m
7B 20395 Clamp, cable 1set
CA 8 18844 Cover, lead 1
CA 9A 04525 Cable, moisture sensor 20m
9B 18649 Terminal, press 4
9C 20386 Terminal, press 1
9D 19920 Terminal, sleeve 4sets
9E 19190 Clamp, cable 1set
CA 10 03404 Tube, cable protection 1
CA 11 18843 Gland, packing 1
CA ** 12 03407 Packing, rubber 3
CA ** 13 03406 Packing, set ring 1
CA 14A 01877 Bolt, stud 4
CA 14B 02046 Washer, lock 4
CA 14C 02013 Nut, dome 4
16 20396 Cover, uper 1
17 08857 Plate, set 1
18 19526 Plate, distance 1
KIT ** 19 02836 O-ring 2
KIT ** 20 18643 O-ring 2
21 01746 Screw, hexagon head 16
22 03513 Nipple, grease 2
** 23 00679 Bearing, cylindrical roller 1
** 24 03676 Ring, seal A 1
** 25 02649 Seal, lip 2
26 19299 Cover, bearing A 1

PAGE 1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY

PARTS LIST - DPF30-MT2 & DPF30B-MT2


Ref. Dwg. No. A7261 Rev.0 to A7263 Rev.0 TPSD-006 Rev.0
Please use the part number when ordering. Effective: April 12, 2006
REF # New Part # DESCRIPTION QTY
27 18660 Bolt, lubrication 1
28 25882 Case, motor 1
29 25880 Shaft 1
30 25881 Assembly, rotor and shaft 1
31 25882 Assembly, stator and motor case, 460V 1
32A 01892 Bolt, stud 16
32B 01389 Washer, lock 16
32C 02014 Nut, dome 16
32D 01694 Screw, hexagon head 4
** 33 03686 Ring, seal B 1
34 18515 Cover, bearing B 1
35A 01675 Screw, hexagon head 18
35B 01392 Washer, lock 18
35C 03170 Screw, hexagon head 2
36 18660 Bolt, lubrication 1
37 20401 Cover, under (DPF30) 1
37 20402 Cover, under (DPF30B) 1
** 38 00640 Bearing, deep groove ball 1
** 39 00698 Bearing, thrust ball 1
KIT ** 40 18640 O-ring 1
SRK ** 41 02587 Seal, lip A 1
42 08067 Ring, space A 1
SRK ** 43 02847 Seal, lip A 1
SRK ** 44 18604 Sleeve, shaft A 1
** 45 18523 Sleeve, bearing 1
** 46 19300 Plate, bearing set 1
SRK ** 47 00638 Bearing, deep groove ball 1
** 48 03694 Plate, bearing lock 1
SRK ** 49 02544 Seal, lip B 3
50 03695 Ring, space B 4
SRK ** 51 03696 Sleeve, shaft B 1
SRK ** 52 02846 Seal, lip B 2
KIT ** 53 02551 O-ring 1
** 54 03697 Sleeve, distance 1
** 55 03698 Key 1

PAGE 2
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY

PARTS LIST - DPF30-MT2 & DPF30B-MT2


Ref. Dwg. No. A7261 Rev.0 to A7263 Rev.0 TPSD-006 Rev.0
Please use the part number when ordering. Effective: April 12, 2006
REF # New Part # DESCRIPTION QTY
* 56 19578 Casing, vortex (DPF30) 1
* 56 03700 Casing, vortex (DPF30B) 1
KIT ** 57 02810 O-ring 1
58 18516 Seal, lip housing A 1
59A 01714 Bolt, set 6
59B 02044 Washer, lock 6
60 18603 Cover, oil chamber 1
61 19613 Seal, lip housing B 1
KIT ** 62 18633 O-ring 1
KIT ** 63 02613 O-ring 1
64A 01686 Screw, hexagon head 6
64B 02046 Washer, lock 6
64C 01683 Screw, hexagon head 2
KIT ** 65 18644 O-ring 2
66 20389 Cover, oil inlet 2
67A 01892 Bolt, stud 4
67B 01389 Washer, lock 4
67C 02014 Nut, dome 4
67D 01582 Screw, hexagon head 2
KIT ** 68 03972 O-ring (DPF30) 1
KIT ** 68 02840 O-ring (DPF30B) 1
69A 01892 Bolt, stud 16
69B 01389 Washer, lock 16
69C 02014 Nut, dome 16
69D 01691 Screw, hexagon head 4
* 70 03531 Bend (DPF30) 1
* 70 03532 Bend (DPF30B) 1
* 71 18520 Cover, delivery (DPF30) 1
* 71 19237 Cover, delivery (DPF30B) 1

PAGE 3
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY

PARTS LIST - DPF30-MT2 & DPF30B-MT2


Ref. Dwg. No. A7261 Rev.0 to A7263 Rev.0 TPSD-006 Rev.0
Please use the part number when ordering. Effective: April 12, 2006
REF # New Part # DESCRIPTION QTY
* 72 03709 Impeller, 60Hz (DPF30) 1
* 72 03710 Impeller, 60Hz (DPF30B) 1
* 73 18519 Disc, impeller (DPF30) 1
* 73 03712 Disc, impeller (DPF30B) 1
* 74 03713 Cover, suction (DPF30) 1
* 74 03714 Cover, suction (DPF30B0 1
75 03715 Plate, strainer (DPF30) 1
75 18531 Plate, strainer (DPF30B) 1
76A 01890 Bolt, stud (DPF30) 4
76A 01892 Bolt, stud (DPF30B) 4
76B 01389 Washer, lock 4
76C 02014 Nut, dome 4
KIT ** 77 03972 O-ring (DPF30) 1
KIT ** 77 02840 O-ring (DPF30B) 1
78A 01983 Screw, flat head 8
78B 01392 Washer, lock 8
78C 01391 Nut 8
79A 01694 Screw, hexagon head (DPF30) 4
79A 01997 Screw, hexagon head (DPF30B) 4
79B 01389 Washer, lock (DPF30) 4
79B 02046 Washer, lock (DPF30B) 4
80 03717 Strainer (DPF30) 1
80 19478 Strainer (DPF30B0 1
* 81 03719 Agitator, pump 1
** 82 18524 Collar, impeller 1
** 83 18525 Nut, impeller 2
85 01758 Screw, hexagon head 4
88 01768 Screw, machine set 3
89 02054 Bolt, eye 2
90A 01675 Bolt, set 6
90B 02046 Washer, lock 6
91A 01834 Bolt, stud (DPF30) 8
91A 01845 Bolt, stud (DPF30B) 8
91B 02032 Washer, lock (DPF30) 8
91B 02042 Washer, lock (DPF30B) 8
91C 01787 Nut, dome (DPF30) 8
91C 01788 Nut, dome (DPF30B) 8

PAGE 4
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (1 YR OPERATION) Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
KIT ITEMS ARE INCLUDED IN O-RING KIT
SRK ITEMS INCLUDED IN SEAL REPAIR KIT
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY

PARTS LIST - DPF30-MT2 & DPF30B-MT2


Ref. Dwg. No. A7261 Rev.0 to A7263 Rev.0 TPSD-006 Rev.0
Please use the part number when ordering. Effective: April 12, 2006
REF # New Part # DESCRIPTION QTY
* 92 03205 Packing, plate (DPF30) 1
* 92 03207 Packing, plate (DPF30B) 1
94A 20398 Terminal, press 7
94B 20398 Terminal, press 3
94C 08860 Terminal, press 1
95A 01772 Screw, hexagon head 1
95B 01431 Washer 1
96 03470 Nipple, hose (DPF30) 1
96 03549 Nipple, hose (DPF30B) 1
* 97 03206 Packing, plate 1
98A 01583 Screw, hexagon head (DPF30) 8
98A 01708 Screw, hexagon head (DPF30B) 8
98B 01389 Washer, lock (DPF30) 8
98B 01395 Washer, lock (DPF30B) 8
98C 01388 Nut, Hex (DPF30) 8
98C 01394 Nut, Hex (DPF30B) 8
100A MM-810B Bolt, set 3
100B 01432 Washer 3
100C 01803 Nut 3
CA 106A 01877 Bolt, stud 4
CA 106B 02046 Washer, lock 4
CA 106C 02013 Nut, dome 4
107 01387 Bolt, eye 1
122 18545 Sensor, moisture 1set
CA 10832 Assembly, cable with moisture sensor (20m length 1set
** KIT 12899 Kit, o-ring 1set
** SRK 12905 Kit, seal repair (includes o-rings 40,57,62,63 & 1set
08229 Relay, moisture sensor 1
13047 Jacket, water 1set

PAGE 5
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224
** CRITICAL SPARES (1 YR OPERATION)
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT

PARTS LIST - DPF50-MT2 & DPF50B-MT2


Ref. Dwg. No. A7292 to A7295
Please use the part number when ordering. Effective: March 22, 2011
REF # Current Part # DESCRIPTION QTY
1A 01877 Bolt, stud 6
1B 02046 Washer, lock 6
1C 02013 Nut, dome 6
1D 01683 Screw, hexagon head 2
GK ** 2 02825 O-ring 1
CA 3 18559 Gland, packing 1
CA ** 4 03726 Packing 3
CA ** 5 03727 Set ring, packing 2
CA 6 03728 Tube, cable protection 1
CA 7A 04522 Cable, power 20m
7B 19919 Clamp, cable 1set
CA 8 18556 Cover, lead 1
CA 9A 04525 Cable, moisture sensor 20m
9B 18649 Terminal, press 4
9C 20386 Terminal, press 1
9D 19920 Terminal, sleeve 4sets
9E 19190 Clamp, cable 1set
CA 10 03404 Tube, cable protection 1
CA 11 18557 Gland, packing 1
CA ** 12 03407 Packing, rubber 3
CA ** 13 03406 Set ring, packing 1
CA 14A 01877 Bolt, stud 4
CA 14B 02046 Washer, lock 4
CA 14C 02013 Nut, dome 4
16 20093 Cover, upper 1
17 08857 Plate, set 1
18 08858 Plate, distance 1
GK ** 19 02837 O-ring 2
GK ** 20 18643 O-ring 2
21 01746 Screw, hexagon head 16
22 18617 Nipple, grease 2
SRK ** 23 00683 Bearing 1
** 24 03732 Ring, seal A 1
SRK ** 25 02345 Seal, lip 2
26 19275 Cover, bearing A 1
27 18660 Bolt, lubrication 1
28 25884 Case, motor 1
29 18609 Shaft 1
30 25883 Assembly, shaft & rotor 1
31 25884 Assembly, stator & motor case, 380V 1
31 25885 Assembly, stator & motor case, 460V 1
31 25886 Assembly, stator & motor case, 575V 1
32A 18667 Bolt, stud 16
32B 01395 Washer, lock 16

1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224
** CRITICAL SPARES (1 YR OPERATION)
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT

PARTS LIST - DPF50-MT2 & DPF50B-MT2


Ref. Dwg. No. A7292 to A7295
Please use the part number when ordering. Effective: March 22, 2011
REF # Current Part # DESCRIPTION QTY
32C 02016 Nut, dome 16
32D 01703 Screw, hexagon head 4
** 33 03742 Ring, seal B 1
34 18533 Cover, bearing A 1
35A 01675 Screw, hexagon head 18
35B 01392 Washer, lock 18
35C 03170 Screw, hexagon head 2
36 18660 Bolt, lubrication 1
37 19221 Cover, under 1
SRK ** 38 00641 Bearing, deep groove ball 1
SRK ** 39 00699 Bearing, thrust ball 1
GK ** 40 02433 O-ring 1
SRK ** 41 02642 Seal, lip A 1
42 03746 Ring, space A 1
SRK ** 43 02848 Seal, rareflon 1
SRK ** 44 18610 Sleeve, shaft A 1
** 45 18540 Sleeve, bearing 1
46 18608 Plate, bearing set 1
SRK ** 47 00639 Bearing, deep groove ball 1
** 48 03750 Plate, bearing lock B 1
SRK ** 49 02642 Seal, lip 3
50 03746 Ring, space B 4
SRK ** 51 03752 Sleeve, shaft B 1
SRK ** 52 02848 Seal, lip B 2
GK ** 53 02621 O-ring 1
** 54 03753 Sleeve, distance 1
** 55 03754 Key 1
* 56 04916 Casing, pump 1
GK ** 57 02811 O-ring 1
58 19183 Seal, lip housing A 1
59A 01664 Bolt, set 6
59B 02044 Washer, spring 6
60 18606 Cover, oil chamber 1
61 18607 Seal, lip housing B 1
GK ** 62 19921 O-ring 1
GK ** 63 02827 O-ring 1
64A 01694 Screw, hexagon head 6
64B 01389 Washer, lock 6
64C 01691 Screw, hexagon head 2
GK ** 65 18644 O-ring 2
66 20389 Cover, oil inlet 2
67A 02077 Bolt, stud 8
67B 01395 Washer, lock 8
67C 02016 Nut, dome 8
67D 01702 Screw, hexagon head 2

2
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224
** CRITICAL SPARES (1 YR OPERATION)
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT

PARTS LIST - DPF50-MT2 & DPF50B-MT2


Ref. Dwg. No. A7292 to A7295
Please use the part number when ordering. Effective: March 22, 2011
REF # Current Part # DESCRIPTION QTY
GK 68 02841 O-ring 1
69A 02079 Bolt, stud 16
69B 01395 Washer, lock 16
69C 02016 Nut, dome 16
69D 01702 Screw, hexagon head 4
* 70 03532 Bend (DPF50) 1
* 70 21800 Bend (DPF50B) 1
* 71 18536 Cover, delivery 1
* 72 04929 Impeller (50Hz) 1
* 72 18535 Impeller (60Hz) 1
* 73 03764 Disc, impeller 1
* 74 18534 Cover, suction 1
75 18538 Plate, strainer 1
76A 02077 Bolt, stud 4
76B 01395 Washer, lock 4
76C 02016 Nut, dome 4
GK ** 77 02841 O-ring 1
78A 01997 Screw, flat head 8
78B 02046 Washer, lock 8
78C 01403 Nut 8
79A 01694 Screw, hexagon head 4
79B 01389 Washer, lock 4
80 18537 Strainer 1
* 81 03768 Agitator, pump 1
** 82 03769 Collar, impeller 1
** 83 03770 Nut, impeller 1
** 84 04940 Connective 1
85 24394 Screw, hexagon head 4
88 01768 Screw, set 3
89 02054 Bolt, eye 2
90A 01675 Bolt, set 6
90B 01392 Washer, spring 6
91A 01845 Bolt, stud 8
91B 02042 Washer, spring 8
91C 02025 Nut, dome 8
92 03207 Packing, plate 1
94A 20387 Terminal, press 3
94B 20386 Terminal, press 2
94C 20388 Terminal, press 3
94D 20387 Terminal, press 3
95A 01771 Screw, hexagon head 1
95B 01435 Washer 1
96 03549 Nipple, hose (DPF50) 1
96 19635 Nipple, hose (DPF50B) 1
* 97 03208 Packing, plate (DPF50) 1
* 97 03210 Packing, plate (DPF50B) 1
98A 01708 Screw, hexagon head 8

3
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224
** CRITICAL SPARES (1 YR OPERATION)
* RECOMMENDED SPARES (OVER 2 YRS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT

PARTS LIST - DPF50-MT2 & DPF50B-MT2


Ref. Dwg. No. A7292 to A7295
Please use the part number when ordering. Effective: March 22, 2011
REF # Current Part # DESCRIPTION QTY
98B 01395 Washer, lock 8
98C 01394 Nut 8
100A 20390 Bolt, set 3
100B 01432 Washer 3
100C 01804 Nut 3
CA 103A 01877 Bolt, stud 4
CA 103B 02046 Washer, lock 4
CA 103C 02013 Nut, dome 4
107 01387 Bolt, eye 1
122 18560 Sensor, moisture 1set
CA 10834 Assembly, cable, 20m (includes item 2) 1set
SRK ** GK 12900 Kit, gasket / o-ring 1set
** SRK 16344 Kit, seal repair (includes GK) 1set
08229 Relay, moisture sensor 1
13142 Water jacket (optional) 1

4
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (0 - 2 YEAR OPERATION)
Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (3 - 5 YEARS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF75-MT2 & DPF75B-MT2
Ref. Dwg. No. A7288 Rev.0 to A7291 Rev.0 & DN11455 Rev. 0
Please use the part number when ordering. Effective: September 18, 2015
REF # New Part # DESCRIPTION QTY
1A 01877 Bolt, stud 6
1B 02046 Washer, lock 6
1C 02013 Nut, dome 6
1D 01683 Screw, hexagon head 2
GK ** 2 02825 O-ring 1
CA 3 18559 Gland, packing 1
CA ** 4 03726 Packing 3
CA ** 5 03727 Set ring, packing 2
CA 6 03728 Tube, cable protection 1
CA 7A 04522 Cable, power 20m
7B 19919 Clamp, cable 1set
CA 8 18556 Cover, lead 1
CA 9A 04525 Cable, moisture sensor 20m
9B 18649 Terminal, press 4
9C 20386 Terminal, press 1
9D 19920 Terminal, sleeve 4sets
9E 19190 Clamp, cable 1set
CA 10 03404 Tube, cable protection 1
CA 11 18557 Gland, packing 1
CA ** 12 03407 Packing, rubber 3
CA ** 13 03406 Set ring, packing 1
CA 14A 01877 Bolt, stud 4
CA 14B 02046 Washer, lock 4
CA 14C 02013 Nut, dome 4
16 20093 Cover, upper 1
17 08857 Plate, set 1
18 08858 Plate, distance 1
GK ** 19 02837 O-ring 2
GK ** 20 18643 O-ring 2
21 01746 Screw, hexagon head 16
22 18617 Nipple, grease 2
SRK ** 23 00683 Bearing 1
** 24 03732 Ring, seal A 1
SRK ** 25 02345 Seal, lip 2
26 19275 Cover, bearing A 1
27 18660 Bolt, lubrication 1
29 19475 Shaft 1
30 19906 Assembly, shaft & rotor 1
31, 28 20394 Assembly, stator & motor case, 380V 1
31, 28 20072 Assembly, stator & motor case, 460V 1
31, 28 18612 Assembly, stator & motor case, 575V 1
32A 18667 Bolt, stud 16
32B 01395 Washer, lock 16

1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (0 - 2 YEAR OPERATION)
Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (3 - 5 YEARS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF75-MT2 & DPF75B-MT2
Ref. Dwg. No. A7288 Rev.0 to A7291 Rev.0 & DN11455 Rev. 0
Please use the part number when ordering. Effective: September 18, 2015
REF # New Part # DESCRIPTION QTY
32C 02016 Nut, dome 16
32D 01703 Screw, hexagon head 4
** 33 03742 Ring, seal B 1
34 18533 Cover, bearing A 1
35A 01675 Screw, hexagon head 18
35B 01392 Washer, lock 18
35C 03170 Screw, hexagon head 2
36 18660 Bolt, lubrication 1
37 19221 Cover, under 1
SRK ** 38 00641 Bearing, deep groove ball 1
SRK ** 39 00699 Bearing, thrust ball 1
GK ** 40 02433 O-ring 1
SRK ** 41 02642 Seal, lip A 1
42 03746 Ring, space A 1
SRK ** 43 02848 Seal, rareflon 1
SRK ** 44 18610 Sleeve, shaft A 1
SRK ** 45 18540 Sleeve, bearing 1
46 18608 Plate, bearing set 1
SRK ** 47 00639 Bearing, deep groove ball 1
** 48 03750 Place, bearing lock B 1
SRK ** 49 02642 Seal, lip 3
50 03746 Ring, space B 4
SRK ** 51 03752 Sleeve, shaft B 1
SRK ** 52 02848 Seal, lip B 2
GK ** 53 02621 O-ring 1
** 54 03753 Sleeve, distance 1
** 55 03754 Key 1
* 56 24444 Casing, pump (50Hz) 1
* 56 04916 Casing, pump (60Hz) 1
GK ** 57 02811 O-ring 1
58 19183 Seal, lip housing A 1
59A 01664 Screw, hexagon head 6
59B 02044 Lock, Washer 6
60 18606 Cover, oil chamber 1
61 18607 Seal, lip housing B 1
GK ** 62 02517 O-ring 1
GK ** 63 02827 O-ring 1
64A 01694 Screw, hexagon head 6
64B 01389 Washer, lock 6
64C 01691 Screw, hexagon head 2
GK ** 65 18644 O-ring 2
66 20389 Cover, oil inlet 2
67A 02077 Bolt, stud 8
67B 01395 Washer, lock 8
67C 02016 Nut, dome 8

2
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (0 - 2 YEAR OPERATION)
Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (3 - 5 YEARS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF75-MT2 & DPF75B-MT2
Ref. Dwg. No. A7288 Rev.0 to A7291 Rev.0 & DN11455 Rev. 0
Please use the part number when ordering. Effective: September 18, 2015
REF # New Part # DESCRIPTION QTY
67D 01702 Screw, hexagon head 2
GK ** 68 02841 O-ring 1
69A 02079 Bolt, stud 16
69B 01395 Washer, lock 16
69C 02016 Nut, dome 16
69D 01702 Screw, hexagon head 4
* 70 03532 Bend (DPF75) 1
* 70 21800 Bend (DPF75B) 1
* 71 18536 Cover, delivery 1
* 72 19455 Impeller (50Hz) 1
* 72 04929 Impeller (60Hz) - Prior to serial 77293 1
* 72 19186 Impeller (60Hz) 1
* 73 03764 Disc, impeller 1
* 74 18534 Cover, suction 1
75 18538 Plate, strainer 1
76A 02077 Bolt, stud 4
76B 01395 Washer, lock 4
76C 02016 Nut, dome 4
GK ** 77 02841 O-ring 1
78A 01997 Screw, flat head 8
78B 02046 Washer, lock 8
78C 01403 Nut 8
79A 01694 Screw, hexagon head 4
79B 01389 Washer, lock 4
80 26612 Strainer (50Hz) 1
80 18537 Strainer (60Hz) 1
* 81 03768 Agitator, pump 1
** 82 03769 Collar, impeller 1
** 83 03770 Nut, impeller 1
** 84 04940 Connective 1
85 24394 Screw, hexagon head 4
88 01768 Screw, set 3
89 02054 Bolt, eye 2
90A 01675 Bolt, set 6
90B 01392 Washer, spring 6
91A 01845 Bolt, stud 8
91B 02042 Washer, spring 8
91C 01788 Nut, dome 8
GK * 92 03207 Packing, plate 1
94A 20387 Terminal, press 3
94B 20386 Terminal, press 2
94C 20388 Terminal, press 3
94D 20387 Terminal, press 3
95A 01771 Screw, hexagon head 1
95B 01435 Washer 1
96 03549 Nipple, hose (DPF75) 1
96 19635 Nipple, hose (DPF75B) 1

3
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
** CRITICAL SPARES (0 - 2 YEAR OPERATION)
Tel: (604) 298-1213 Fax: (604) 298-1224
* RECOMMENDED SPARES (3 - 5 YEARS OPERATION)
CA ITEMS ARE INCLUDED IN CABLE ASSEMBLY
GK ITEMS ARE INCLUDED IN GASKET/O-RING KIT
SRK ITEMS ARE INCLUDED IN SEAL REPAIR KIT
PARTS LIST - DPF75-MT2 & DPF75B-MT2
Ref. Dwg. No. A7288 Rev.0 to A7291 Rev.0 & DN11455 Rev. 0
Please use the part number when ordering. Effective: September 18, 2015
REF # New Part # DESCRIPTION QTY
GK * 97 03208 Packing, plate (DPF75) 1
GK * 97 03210 Packing, plate (DPF75B) 1
98A 01708 Screw, hexagon head 8
98B 01395 Washer, lock 8
98C 01394 Nut 8
100A 20390 Bolt, set 3
100B 01432 Washer 3
100C 01804 Nut 3
CA 103A 01877 Bolt, stud 4
CA 103B 02046 Washer, lock 4
CA 103C 02013 Nut, dome 4
107 01387 Bolt, eye 1
122 18560 Sensor, moisture 1set
CA 10834 Assembly, cable, 20m (includes item 2) 1set
SRK ** GK 12900 Kit, gasket / o-ring 1set
** SRK 16344 Kit, seal repair (includes gasket kit) 1set
08229 Relay, moisture sensor 1
13070 Water jacket (optional) 1

Cutter/Agitator Conversion 1
Add
040.1 26260 Stud 4
040.2 01395 Washer, Lock 4
040.3 02016 Nut, Dome 4
040.4 17127 Screw, Skt Head, Cap 4
* 090.1 26266 Kit, Shim, Color Coded 1
* 207 26265 Agitator, Machined DP, HCr, Special 1
* 219 26270 Cutter, Rotating, DPF 1
* 220 26262 Cutter, Stationary, DPF, Stl 1
Remove
76A 02077 Bolt, stud 4
76B 01395 Washer, lock 4
76C 02016 Nut, dome 4
85 24394 Screw, hexagon head 4

4
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224

PARTS LIST - DP-100B-MT2


Ref. Drawing - A9895 Rev.0 TPSD-001 Rev.0
art number when ordering. Effective: June 14, 2012
REF # PART # DESCRIPTION QTY
1 18648 Plate Packing 1
2A 01877 Stud 8
2B 02046 Washer, Lock 8
2C 02013 Nut, Dome 8
3 20467 Lamp Cover 1
9A 01877 Stud 6
9B 02046 Washer, Lock 6
9C 02013 Nut, Dome 6
9D 01683 Screw, Hex Head, Cap 2
** 10 02821 O-Ring 1
11 25863 Lead Cover 1
12A 25864 Cabtyre Cable 20m
12B 21870 Clamp, Cable 1set
13 18574 Cable Protection Tube 1
** 14 18575 Ring, Packing 4
** 15 18576 Packing Set Ring 4
16 19239 Distance Plate 1
18 01666 Screw, Hex Head, Cap 3
** 19 02542 O-Ring 2
** 20 02623 O-Ring 2
21 01746 Screw, Hex Head, Cap 8
22 03494 Grease Inlet Cover 2
** 23 00644 Bearing, Deep Groove Ball 1
** 24 25865 Oil Seal Disc 1
** 25 18668 Seal, Lip 1
** 26 20470 Seal Ring 1
27A 20471 Grease Inlet Pipe A 1
27B 03504 Socket 1
27C 03513 Grease Nipple 1
28 20472 Upper Cover 1
29A 18568 Body Clasp Bolt 12
29B 01395 Washer, Lock 24
29C 02016 Nut, Dome 24
29D 01703 Screw, Hex Head, Cap 2
30 20474 Motor Case 1
31 20474 Stator (460V) 1
32 20476 Rotor 1
33 20476 Shaft 1
35A 01686 Screw, Hex Head, Cap 6
35B 02046 Washer, Lock 6
** 36 02786 Gasket 1
37 25866 Bearing Cover 1
38 19849 Connective 1
** 39 02345 Seal, Lip 1
** 40 25867 Thrust Ball Bearing 1
41A 25877 Grease Inlet Pipe B 1
41B 03504 Socket 1
41C 03505 Grease Nipple 1
42 25868 Under Cover 1
** 43 02623 O-Ring 2
44 01746 Screw, Hex Head, Cap 8

1
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224

PARTS LIST - DP-100B-MT2


Ref. Drawing - A9895 Rev.0 TPSD-001 Rev.0
art number when ordering. Effective: June 14, 2012
REF # PART # DESCRIPTION QTY
45 03530 Oil Inlet Cover 2
46A 12275 Stud 6
46B 01395 Washer, Lock 6
46C 02016 Nut, Dome 6
46D 01707 Screw, Hex Head, Cap 2
47A 12275 Stud 12
47B 01395 Washer, Lock 12
47C 02016 Nut, Dome 12
47D 01702 Screw, Hex Head, Cap 4
** 48 00984 Bearing, Cylindrical Roller 1
** 49 00701 Bearing, Thrust Ball 1
** 50 02555 O-Ring 1
** 51 18481 Shaft Sleeve A 1
** 52 20482 Bearing Lock Plate A 1
** 53 00645 Bearing, Deep Groove Ball 1
** 54 25869 Bearing Lock Plate B 1
** 55 18482 Shaft Sleeve B 1
** 56 02611 O-Ring 1
57 18480 Distance Sleeve 1
** 58 18479 Key 1
** 59 02649 Seal, Lip 2
60 18478 Space Ring A 1
** 61 02849 Seal, Lip 3
62 18484 Stop Ring 1
** 63 02649 Seal, Lip 3
64 18478 Space Ring A 4
66 20483 Oil Chamber Cover 1
67 20484 Oil Seal Housing A 1
** 68 02816 O-Ring 1
69A 01675 Screw, Hex Head, Cap 6
69B 01392 Washer, Lock 6
70 20485 Oil Seal Housing B 1
** 71 02819 O-Ring 1
72A 01675 Screw, Hex Head, Cap 6
72B 01392 Washer, Lock 6
72C 03170 Screw, Hex Head, Cap 2
** 73 02838 O-Ring 1
74A 01696 Screw, Hex Head, Cap 6
74B 01389 Washer, Lock 6
74C 01691 Screw, Hex Head, Cap 2
* 75 18474 Elbow 1
76 25870 Cover, Gland 1
** 77 02583 O-Ring 1
* 78 25871 Casing 1
** 79 02583 O-Ring 1
* 80 18477 Delivery Cover 1
* 81 21365 Impeller (60Hz) 1
* 82 19850 Impeller Disc 1
* 83 18475 Suction Cover 1
* 84 18483 Impeller Nut 1
86A 01694 Screw, Hex Head, Cap 4

2
TOYO PUMPS NORTH AMERICA CORPORATION
2853 Douglas Road
Burnaby, BC V5C 6H2
Tel: (604) 298-1213 Fax: (604) 298-1224

PARTS LIST - DP-100B-MT2


Ref. Drawing - A9895 Rev.0 TPSD-001 Rev.0
art number when ordering. Effective: June 14, 2012
REF # PART # DESCRIPTION QTY
86B 01389 Washer, Lock 4
87A 01985 Screw, Hex Skt Cts Head 8
87B 02046 Washer, Lock 8
87C 01403 Nut, Hexagon 8
89A 04012 Stud 6
89B 01395 Washer, Lock 6
89C 02016 Nut, Dome 6
90 20578 Strainer Plate 1
92 01763 Screw, Hex Head, Cap 6
93A 02080 Stud 8
93B 01395 Washer, Lock 8
93C 02016 Nut, Dome 8
93D 01761 Screw, Hex Head, Cap 4
94 20579 Strainer 1
* 95 19622 Agitator 1
96 02054 Eyebolt 4
97 20488 Set Plate 1
99A 25872 Press Terminal 6
99B 19621 Press Terminal 2
99C 25873 Press Terminal 3
100A 01845 Stud 12
100B 02042 Washer, Lock 12
100C 01788 Nut, Hexagon 12
** 101 03210 Gasket 1
102A 06106 Stud 12
102B 01395 Washer, Lock 12
102C 01799 Nut 12
** 103 03210 Gasket 1
104 19635 Hose Nipple 1
105A 01663 Screw, Hex. Head, Cap 3
105B 01433 Washer, Lock 3
105C 01805 Nut 3
108A 01771 Screw, Hex. Head, Cap 1
108B 01431 Washer, Lock 1
109A 01858 Stud 4
109B 02046 Washer, Lock 4
109C 01407 Nut 4
110A 25874 Cabtyre Cable 20m
110B 18649 Press Terminal 4
110C 20386 Press Terminal 1
110D 19920 Sleeve Terminal 3 sets
110E 19190 Cable Clamp 1 set
111 03404 Cable Protection Tube 1
** 112 03407 Packing 3
* 113 03406 Packing Set Ring 1
* 114 25875 Packing Gland 1
115A 04326 Stud 2
115B 01392 Washer, Lock 2
115C 01796 Nut 2
116 25876 Moisture Sensor 1 set

You might also like