S E W N: Structural Layout Plan - Footings and Columns
S E W N: Structural Layout Plan - Footings and Columns
C-05
230X460
SCHEDULE OF FOOTINGS :-
DEPTH
BOTTOM FACE STEELIN FOOTING TOP FACE STEEL IN FOOTING
SR. FOOTING SIZE OF SIZE OF OF
COLUMN NO. REMARKS
NO. GROUP P.C.C. FOOTING FOOTING ALONG ALONG
(D) ALONG LENGHT(L) ALONG LENGHT(L)
BREADTH(B) BREADTH(B)
ISOLATED
1 F-01 C- 05. 1600X1800 1400X1600 460 10MM @ 150MM C/C 10MM @ 150MM C/C --- BOX FOOTING ---
(01)
ISOLATED
2 F-02 C- 01, 02, 03, 06, 07. 1700X1900 1500X1700 500 10MM @ 130MM C/C 10MM @ 130MM C/C 10MM @ 260MM C/C 10MM @ 260MM C/C BOX FOOTING
(05)
C- 04, 08, 09, 10, 11. 1600X1800 1400X1600 12MM @ 150MM C/C 10MM @ 130MM C/C 12MM @ 150MM C/C 10MM @ 130MM C/C ECCENTRIC
3 F-03 460 FOOTING (05)
RINGS STRAIGHT R/F RINGS STRAIGHT R/F
SCHEDULE OF COLUMN :-
SR. SIZE OF LATERAL TIES (RINGS)
COLUMN NO STEEL IN COLUMNS COLUMN-BEAM SKETCH C/S COUNT
NO. COLUMNS MIDDLE HEIGHT
ZONE JUNCTION(END ZONE)
1 C - 04, 05, 08, 09, 10, 11. 230x460 08 NOS - 12MM TOR. 8MM TOR @ 150C/C 8MM TOR @ 130C/C 06
DOUBLE RINGS DOUBLE RINGS
2 C - 01, 02, 03, 06, 07. 230x530 10 NOS - 12MM TOR. 8MM TOR @ 150C/C 8MM TOR @ 130C/C 05
DOUBLE RINGS DOUBLE RINGS
ADDITIONAL NOTES:-
* STRUCTURAL DESIGN IS DONE BASED ON ARCHITECTURAL DRAWING. * DE-SHUTTERING TIME PERIOD : - SLAB, BEAM BOTTOM - 14 DAYS, BEAMS &
* ALL SECTIONS ARE DESIGNED USING LIMIT STATE DESIGN METHOD. COLUMN (SIDES) - 24-48 HOURS. (AS PER THE ENGINEER IN CHARGE)
* ALL WORKS BELOW GROUND LEVEL SHALL BE EXECUTED IN DRY CONDITIONS. * ALL BEAMS TOP LEVEL MUST BE FLUSHED, BOTTOM LEVELS MAY VARY.
* MECHANICAL MIXER SHOULD BE USED FOR CONCRETE.
* POURING OF CONCRETE SHALL BE DONE AFTER CHECKING & SATISFACTION
OF SITE ENGINEER. * FIRE RATING CONSIDERED IS FOR 1 HOUR MAXIMUM.
* SECONDARY BEAMS ARE DESIGNED AS SIMPLY SUPPORTED BEAMS AT * STEEL SHOULD BE CHECKED BEFORE CONCRETING
DISCONTINUOUS ENDS THEREFORE EXTRA TOP BARS AT DISCONTINUOUS END * REFER DETAILED CONSTRUCTION NOTES BEFORE EXECUTION.