S E W N: Structural Layout Plan - Footings and Columns

The document outlines the structural layout plan for footings and columns, including detailed schedules for footings and columns with specifications for size, steel reinforcement, and remarks. It emphasizes the structural design based on architectural drawings, the use of limit state design methods, and various construction notes regarding concrete pouring and material specifications. Additional notes include guidelines for concrete grades, reinforcement covers, and site conditions that must be adhered to during construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views1 page

S E W N: Structural Layout Plan - Footings and Columns

The document outlines the structural layout plan for footings and columns, including detailed schedules for footings and columns with specifications for size, steel reinforcement, and remarks. It emphasizes the structural design based on architectural drawings, the use of limit state design methods, and various construction notes regarding concrete pouring and material specifications. Additional notes include guidelines for concrete grades, reinforcement covers, and site conditions that must be adhered to during construction.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

C-09 C-10 C-11

230X460 230X460 230X460


STR

C-06 C-07 C-08


230X530 230X530 230X460

C-05
230X460

C-01 C-02 C-03 C-04


230X530 230X530 230X530 230X460

STRUCTURAL LAYOUT PLAN | FOOTINGS AND


COLUMNS.

SCHEDULE OF FOOTINGS :-
DEPTH
BOTTOM FACE STEELIN FOOTING TOP FACE STEEL IN FOOTING
SR. FOOTING SIZE OF SIZE OF OF
COLUMN NO. REMARKS
NO. GROUP P.C.C. FOOTING FOOTING ALONG ALONG
(D) ALONG LENGHT(L) ALONG LENGHT(L)
BREADTH(B) BREADTH(B)
ISOLATED
1 F-01 C- 05. 1600X1800 1400X1600 460 10MM @ 150MM C/C 10MM @ 150MM C/C --- BOX FOOTING ---
(01)
ISOLATED
2 F-02 C- 01, 02, 03, 06, 07. 1700X1900 1500X1700 500 10MM @ 130MM C/C 10MM @ 130MM C/C 10MM @ 260MM C/C 10MM @ 260MM C/C BOX FOOTING
(05)

C- 04, 08, 09, 10, 11. 1600X1800 1400X1600 12MM @ 150MM C/C 10MM @ 130MM C/C 12MM @ 150MM C/C 10MM @ 130MM C/C ECCENTRIC
3 F-03 460 FOOTING (05)
RINGS STRAIGHT R/F RINGS STRAIGHT R/F

SCHEDULE OF COLUMN :-
SR. SIZE OF LATERAL TIES (RINGS)
COLUMN NO STEEL IN COLUMNS COLUMN-BEAM SKETCH C/S COUNT
NO. COLUMNS MIDDLE HEIGHT
ZONE JUNCTION(END ZONE)

1 C - 04, 05, 08, 09, 10, 11. 230x460 08 NOS - 12MM TOR. 8MM TOR @ 150C/C 8MM TOR @ 130C/C 06
DOUBLE RINGS DOUBLE RINGS

2 C - 01, 02, 03, 06, 07. 230x530 10 NOS - 12MM TOR. 8MM TOR @ 150C/C 8MM TOR @ 130C/C 05
DOUBLE RINGS DOUBLE RINGS

ADDITIONAL NOTES:-
* STRUCTURAL DESIGN IS DONE BASED ON ARCHITECTURAL DRAWING. * DE-SHUTTERING TIME PERIOD : - SLAB, BEAM BOTTOM - 14 DAYS, BEAMS &
* ALL SECTIONS ARE DESIGNED USING LIMIT STATE DESIGN METHOD. COLUMN (SIDES) - 24-48 HOURS. (AS PER THE ENGINEER IN CHARGE)
* ALL WORKS BELOW GROUND LEVEL SHALL BE EXECUTED IN DRY CONDITIONS. * ALL BEAMS TOP LEVEL MUST BE FLUSHED, BOTTOM LEVELS MAY VARY.
* MECHANICAL MIXER SHOULD BE USED FOR CONCRETE.
* POURING OF CONCRETE SHALL BE DONE AFTER CHECKING & SATISFACTION
OF SITE ENGINEER. * FIRE RATING CONSIDERED IS FOR 1 HOUR MAXIMUM.
* SECONDARY BEAMS ARE DESIGNED AS SIMPLY SUPPORTED BEAMS AT * STEEL SHOULD BE CHECKED BEFORE CONCRETING
DISCONTINUOUS ENDS THEREFORE EXTRA TOP BARS AT DISCONTINUOUS END * REFER DETAILED CONSTRUCTION NOTES BEFORE EXECUTION.
SHOULD BE NEGLECTED DURING LAYING THE REINFORCEMENT OF BEAMS.

ORIENTATION GENERAL NOTE'S:- PROJECT DETAILS:-

* GRADE OF CONCRETE M - 25 & GRADE OF STEEL Fe500


S

* SBC OF HARD MURUM IS CONSIDERED AS 200 kN/Sq. M. TO BE


VERIFIED WITH SITE SOIL TESTING REPORT.
W

* COVER TO REINFORCEMENT FOR FOOTING IS 50 mm,


* COVER TO COLUMNS IS 40 MM, BEAMS IS 25 MM, SLAB IS 20MM
* STRUCTURAL DESIGN IS FOR G + 3 FLOOR ONLY.
E

* DIMENSIONS ARE NOT TO BE SCALED.


* MECHANICAL MIXER SHOULD BE USED FOR CONCRETE.
N

* STEEL SHOULD BE CHECKED BY ENGINEER BEFORE CONCRETING.


SHEET NO:- 04 | JOB ID: PU_169 DATE:- 20 SEPT 2024 | REV. : 00