Gnt-ocp-21 Ocp for Working on Height

The document outlines the Operational Control Procedure for safe working at height, applicable to various activities such as maintenance and installation. It specifies responsibilities, performance criteria, and safety measures, including the use of safety equipment and work permits. The procedure also includes checking and corrective actions for safety equipment and records retention requirements.

Uploaded by

Manu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views2 pages

Gnt-ocp-21 Ocp for Working on Height

The document outlines the Operational Control Procedure for safe working at height, applicable to various activities such as maintenance and installation. It specifies responsibilities, performance criteria, and safety measures, including the use of safety equipment and work permits. The procedure also includes checking and corrective actions for safety equipment and records retention requirements.

Uploaded by

Manu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

GURU NANAK TOOLS DOC. NO.

- GNT-OCP-021

REV. N0 - 01
Title: Operational Control Procedure for
Working on Height REV. DATE 04.04.2025

1. PURPOSE: - To ensure safe working at height

2. SCOPE: - Applicable to all activities at height (eg: Lamp Post, Cable Trays, Lighting, fans, water pipe line,
air pipe line, building maintenance & white washing etc.)
3. RESPONSIBIITY: - HOD maintenance, HOD store, HOD HR

4. PERFORMANCE CRITERIA : Number of Incident

5. CROSS REFERENCE: Clause 8.1 of ISO 14001:2015 & ISO 45001:2018


Aspect-Impact and Hazard-Risk, Legal Requirement
6. ACTIVITIES :
S Activity Responsibility Cross
Sr. No reference
1 Ensure and check the condition of the safety equipment Concern person
before wear.

2 Wear the safety belts and helmet. Concern person

3 Check the area where the work has to be done and issue the Area Incharge
work permit, if it is done by outside agency.

4 Ensure all overhead machine/ rail installation / Area Incharge


commissioning/ modification is done under supervision of
concerned Area incharge/Supervisor
5 Ensure that all floor clamps are removed while moving the Concern person
platform ladder for installation / commissioning/
modification
6 Ensure placement of the platform ladder on proper surface Concern person

7 At shop floor, ensure the fixing of ladder so that it couldn’t Concern person
slip.

8 At the area for pipelines, hang the safety belt with the grill or Concern person
angel so that in case of slipping, you can safe. & Area In
charge
9 Check the shoes and ensure about their ok condition so that Concern person
you could not slip

10 Work in team when working on height. Concern person

11 Ensure every person working on height should wear the Concern person
safety equipment.

Prepared By: - Reviewed By: Approved By: - Issue No.- 02


Issue Date: - 16.10.2024
GURU NANAK TOOLS DOC. NO.- GNT-OCP-021

REV. N0 - 01
Title: Operational Control Procedure for
Working on Height REV. DATE 04.04.2025

12 Without safety equipment, working on height is restricted. Concern person

13 Keep the safety equipment at their specified space in store. Concern person

7. CHECKING, CORRECTIVE & PREVENTIVE ACTION :


* Check for wheel of the ladder.
* Check for safety belt condition.
* Check for the condition of helmets
1. In case of any wheel damage, change the wheel of ladder.
2. In case of any breakage or losing in the belt hook, tight or replace the belt hook.
3. In case of helmet crack, change the helmet.

8. RECORD :
RETENTION DISPOSAL
S.NO FORMAT NAME FORMAT NO. RESPONSIBLITY
PERIOD METHOD
SAFETY WORK
1 GNT/SF/F/17 One Year Tearing off HOD-HR
PERMIT

Prepared By: - Reviewed By: Approved By: - Issue No.- 02


Issue Date: - 16.10.2024