0% found this document useful (0 votes)
178 views1 page

Irpl-pvg01-Kec - Spv-dwg-c-0019 - Inverter - Foundation & Column Details - Tce - Irpl - Cat B

This document contains detailed construction notes and specifications for a foundation drawing related to an inverter control station. It outlines dimensions, material grades, reinforcement requirements, and guidelines for concrete work, ensuring compliance with relevant codes and standards. Additionally, it includes schedules for foundation and reinforcement for different zones, emphasizing the importance of site-specific conditions and approvals.

Uploaded by

satydevsinghnegi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
178 views1 page

Irpl-pvg01-Kec - Spv-dwg-c-0019 - Inverter - Foundation & Column Details - Tce - Irpl - Cat B

This document contains detailed construction notes and specifications for a foundation drawing related to an inverter control station. It outlines dimensions, material grades, reinforcement requirements, and guidelines for concrete work, ensuring compliance with relevant codes and standards. Additionally, it includes schedules for foundation and reinforcement for different zones, emphasizing the importance of site-specific conditions and approvals.

Uploaded by

satydevsinghnegi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

12 11 10 9 8 7 6 5 4 3 2 1

GENERAL NOTES :-
1. ALL DIMENSIONS ARE IN MM & LEVELS ARE IN MTS.
2. DO NOT SCALE THE DRAWING. ONLY WRITTEN DIMENSIONS SHALL
BE FOLLOWED.
3 .UNLESS OTHERWISE NOTED ALL CONCRETE SHALL BE OF GRADE M-25.
4. LAP LENGTH SHALL BE 50D WHERE D IS THE DIA OF THE SMALLEST
1 2 3 4 5 6 7 BAR. LAP LENGTH SHALL BE 50D WHERE D IS THE DIA OF
THE SMALLEST BAR
H 5. PROVIDE CLEAR COVER TO REINFORCEMENT AS UNDER. H
BASE PLATE DETAIL * 50mm FOR BOTTOM & TOP REINFORCEMENT OF RAFT.
* 50mm FOR SIDE REINFORCEMENT OF RAFT.
FOR RAILING PIPE * 40mm FOR COLUMN.
A A
6. ANCHOR BOLTS AND OTHER EMBEDED FIXTURES SHALL BE REF.
AS PER MANUFACTURE DRG. DIRECTLY
INTO CONCRETE, IF BOLTS ARE AVAILABLE WHILE CONCRETING.
7. FOR ORIENTATION OF FOUNDATION REFER FOUNDATION LAYOUT.
8. LOOSE POCKETS IF ANY SHALL BE COMPLETELY REMOVED &
FILLED UP WITH P.C.C. (M-20).
9. THE FOUNDATION HAS BEEN DESIGNED CONSIDERING SAFE BEARING
CAPACITY OF 10.9 T/SQM FOR ZONE A,ZONE B & 7.5 T/SQM FOR ZONE C
AT 1.5M BELOW NGL AS PER SOIL REPORT PAGE NO. 42 OF 293
10. THE LOCATION OF STOPPER SHOULD BE DECIDED AT SITE AFTER
ERECTION OF TRANSFORMER.
11. NOT MORE THAN 50% BARS TO BE SPLICED AT ONE LOCATION.
12. THE MATERIAL TO BE USED FOR STONE FILLING/SITE SURFACING
B TYPICAL DETAIL FOR
SHALL BE STONE AGGREGATE OF 40MM NOMINAL SIZE
G
RAILING PIPE CASTING (UPGRADED SINGLE SIZE) CONFIRMING TABLE 2 IS:383-1970.HARDNESS, G
FLAKINESS SHALL BE AS REQUIRED FOR WEARING COURSES ARE
GIVEN BELLOW
i) SIEVE ANALYSIS LIMITS(GRADATION) (IS:383-TABLE-2)
SIEVE SIZE % PASSING BY WEIGHT

TRAFO
C

AUX
63mm 100
40mm 85-100
Provide M16 Bolt
20mm 0-20
10mm 0-5
D 13. ALL REINFORCEMENT SHALL BE HIGH YIELD STRENGTH DEFORMED
BAR OF GRADE TMT ALL REINFORCEMENT SHALL BE HIGH YIELD
STRENGTH DEFORMED BAR OF GRADE TMT FE500 CONFORMING
150MM THK. SLAB PLAN TO IS:1786.
14. LAPPING OF BARS SHALL BE SUITABLY STAGGERED AND IN NO CASE
1 2 3 4 5 6 7 LxB LxB
Minimum 16mm thick base MORE THAN 50% LAPPING OF BARS SHALL BE SUITABLY STAGGERED
plate shall be provided.
AND IN NO CASE MORE THAN 50% BARS SHALL BE LAPPED
DETAIL `A'
SECTION 1-1 AT ANY SECTION.
PLATE 175x175x10
(DETAIL OF BASE PLATE) 15. ALL HOOKS, BENDS, LAPS AND SPLICES SHALL BE AS PER RELEVANT
BEAM 300x400
F CODE. ALL HOOKS, BENDS, LAPS AND SPLICES SHALL BE AS F
A A
PER RELEVANT IS CODE.
16. EXCAVATED FOUNDATION PITS SHALL BE FREE FROM GROUND
WATER, INGRESS OF EXCAVATED FOUNDATION PITS SHALL BE FREE
FREE FROM GROUND WATER, INGRESS OF GROUND WATER IN THE
SECTION 10-10 PITS SHALL BE COMPLETELY DEWATERED BEFORE LAYING PCC.
BEAM 300x400 17. THE DEPTH OF FOUNDATION SHALL BE CONFIRMED BASED ON THE
HYDROLOGY STUDY. SEPARATE LEVEL SHALL BE PROVIDE IN THE FINAL
DRAWINGS.

BEAM 300x400
18. IN CASE OF FILLED UP SOIL, THE DEPTH OF FOUNDATION SHALL
BE MINIMUM 1M BELOW EXISTING NGL .
BEAM 300x400

19. THIS DRAWING TO BE READ IN CONCURRENCE WITH ELECTRICAL


EQUIPMENT LAYOUT. THE SAME SHALL BE RE VERIFIED BEFORE
SECTION 11-11 CASTING THE FOUNDATION.
B 20. FOR CANOPY DETAIL REFER SEPARATE DRAWING .
BEAM 300x400

IRCONRENEWABLE POWER LIMITED


SECTION 4-4
E SECTION 5-5 C‐4, District Centre, Saket, New Delhi‐ 110017, INDIA E
Tel : +91‐11‐26530245, Fax : +91‐11‐26854000,
26522000
Cat – A: Approved as submitted*
Contractor to proceed to submit GFC, as applicable taking care of

TRAFO
C minor observations, if any.

AUX
Cat – B: Approved with comments*
BEAM 300x400 Contractor to re-submit the drawings/documents incorporating
comments for Approval
Cat – C: Not Approved
Not meeting the requirements. Contractor to re-submit the
drawings/documents.
Cat – D: Retained for Information*
Retained for information. Contractor to proceed to submit GFC, as
applicable, taking care of minor observations, if any.
D
Reviewed / Approved by:

Moses
Digitally signed by

THIS DRAWING AND INFORMATION CONTAINED HEREIN ARE SOLE PROPERTY OF KEC INTERNATIONAL LTD. NO REPRODUCTION IN FULL OR IN PART SHALL BE DONE WITHOUT WRITTEN PERMISSION OF KEC
SECTION 6-6 SECTION 7-7 Signature: Moses
Date: 2024.05.24
Date: 14:41:39 +05'30'
Important Note:
This approval does not relieve the contractor from his obligations of meeting the requirements of
Contract document, relevant Codes & Standards, Site specific requirements and Statutory
requirements.
* This approval is only a technical clearance on the drawings / document submitted by the ✔
Contractor. Manufacturing clearance will be provided by the IRPL Projects team separately.

BEAM PLAN (300x400) OF INVERTER CONTROL STATION (ICS)


SECTION 8-8

LxB LxB LxB



D D
Provide the dimension for hand SECTION 2-2
rail vertical member (balustrade)

Kirthi Kumar 22-05-2024


EL(+)0.00M SECTION 9-9
N.G.L.
LxB LxB LxB LxB LxB LxB LxB

C C
SECTION 3-3 B
1 2 3 4 5 6 7 R5 28.03.24 REVISED AS PER LATEST EQUIPMENT'S GA AKG SR VV
R4 06.02.24 REVISED AS PER COMMENTS AKG AJ VV
R3 25.01.24 REVISED AS PER COMMENTS AKG AJ VV
R2 26.05.23 REVISED AS PER COMMENTS AKG MP VV
A A

H
C1 C1 C1 C1 C1 C1 C1 X R1 25.05.23 REVISED AS PER COMMENTS AKG MP VV
F2 F2 R0 27.04.23 FOR APPROVAL AKG MP VV
A A
F1 F1 F1 F1 F1 REV DATE DESCRIPTION DRN CHD APP
r1 r2

Y
CLIENT:

r1
Ld

D
IRCON RENEWABLE POWER LIMITED
C-4, DISTRICT CENTRE, SAKET, NEW DELHI-110017

75
75MM. THICK
P.C.C (M-15)
r2 CONSULTANT:
WELL COMPACTED SOIL UP TO MINIMUM
95% OF STANDARD PROCTOR DENSITY
B 75 LxB 75 TATA CONSULTING ENGINEERS LTD. B
SECTION A-A BANGALORE, KARNATAKA
B
C1 C1 C1 TYP. SECTION THROUGH COLUMN TYPICAL FOUNDATION PLAN
CONTRACTOR:
F2
F1 F1 KEC INTERNATIONAL LIMITED
8TH FLOOR, BUILDING NO : 9A
DLF CYBER CITY, PHASE III, GURGAON-122002
C PROJECT:
C1 C1 C1 C1
EPC PACKAGE WITH 220kV SUBSTATION FOR
F1 F1 F1 F1 CTU GRID CONNECTED SOLAR PV PROJECT
D
(500MW/ 600MWp) AT PAVAGADA, KARNATAKA
C1 C1 C1
COLUMN & FOUNDATION PLAN VIEW TITLE:
F2 F2 F2
INVERTER STATION FOUNDATION DRAWING
SCHEDULE OF FOUNDATION & R/F. FOR ZONE-C :- SCHEDULE OF FOUNDATION & R/F. FOR ZONE-A & B :-
A
A SIZE BOTTOM REINFORCEMENT SIZE BOTTOM REINFORCEMENT DRAWN: AKG DRAWN: 27-04-2023
SI.NO. FOOTING NO. OF SI.NO. FOOTING NO. OF
MARKED FOOTING B L D H r1 r2 MARKED FOOTING B L D H r1 r2
CHECKED: MP PROJECTION :
1 F1 11 1800 1800 300 1500 12@200C/C 12@200C/C 1 F1 11 1550 1550 300 1500 12@200C/C 12@200C/C SHEET:
SECTION 13-13 SECTION 12-12 APPROVED: SCALE: NTS

SIZE-A1
VV 1 OF 1
2 F2 06 1050 1050 300 1500 12@200C/C 12@200C/C 2 F2 06 950 950 300 1500 12@200C/C 12@200C/C REV. :
DWG.NO: IRPL-2022-101-C-19 R5
12 11 10 9 8 7 6 5 4 3 2 1