05.04.25 Kir Insulation
05.04.25 Kir Insulation
do
N F RLY
KATIHAR
DIVISION-
ELECTRICAL
Office of Sr
DEE/TRD GS/KIR,
DRM Office
Building
Katihar, 854105
Bihar, India
The entire work shall be completed within 6 month from the date
of issue of Letter of Acceptance. Extension of validity period may be
granted to the contractor Subject to any requirement in the contract
as to completion of any portion or portions of the works before
completion of the whole, the Contractor shall fully and finally
complete the whole of the works comprised in the contract (with
such modifications as may be directed under conditions of this
contract) by the date entered in the contract or extended date in
terms of clause 17A and 17B of IR GCC/2022.
VIVEK VERMA
DEE/TRD/KIR
Digitally Signed
View Signature Details
Item Item Item Item Qty Unit Escl. Advt.Value Bid Rate/ Bid Amount
Sno. Desc Code Qty Unit Rate(Rs) (%) (Rs) Unit Rate (Rs)
Schedule A-At KIR Div: Provision of high voltage
composite insulation coating suitable for 25 kV
OHE at restricted electrical clearance at OLS 19436289.40
location (Phase-I). (Item Directory - Not
Applicable)
Pls see
1 for item View Details At Par 19436289.40
breakup
Schedule Totals 0.00
Item Breakup
A-At KIR Div: Provision of high voltage composite insulation coating suitable for 25 kV
Schedule
OHE at restricted electrical clearance at OLS location (Phase-I).
Item
S No. Description of Item Unit Qty Rate Amount
No
Total 19436289.40