Majlis Entrance: Ot Li
Majlis Entrance: Ot Li
LAND KEY: N
W E
PROPOSED PARKING 14.600 NADD PROPOSED PARKING DUTY RECESSED COVER STI-03 +0.30 -0.73 1.03
LT-04
14.500 NADD LT-04 BD BALCONY DRAIN
STI-04 +0.20 -0.92 1.12
L=19.70M
14.550 NADD 14.650 NADD 14.550 NADD STORM DRAIN PIPE STI-10 +0.45 -1.68 2.13
PROPOSED ROAD PROPOSED ROAD SDR STORM DRAIN RISER STI-11 +0.45 -1.79 2.240
L
-T
EXIT
Ø2
20
50
SD
HATCH INDICATES CONCRETE ENCASEMENT GENERAL NOTES :
P
RU
LT-04 LT-04 PROPOSED PARKING
N
FOR PIPES PASSING BELOW ROADWAYS
@
1. ALL DIMENSIONS ARE IN MILLIMETERS &
L=
UG
36
,S
-0.450 F.F.L -0.450 F.F.L
.16
LT-04 COVER LEVEL LEVELS ARE IN METER.
PROPOSED PARKING CL
LO
LT-04
P E
2. WHERE DEPTH FROM GROUND FLOOR FFL TO TOP OF
1:2
IL INVERT LEVEL
ROAD LEVEL 14.500 NADD 14.50034 NADD33
00
UNDERGROUND PIPE LESS THAN 1.2M, THE UG PIPES
IMIT LOT L
19 20 21 22 23 24 25 26 27 35 32 30 29 28
WILL BE C/W CONCRETE ENCASEMENT. ALL U.G
14.530 NADD -0.350 F.F.L PIPING PASSING BELOW BUILDING SHALL BE C/W
-0.350 F.F.L
LOT L
CONCRETE ENCASEMENT.
P
IL-1.89
IMIT
14.600 NADD 14.600 NADD 3. WARNING TAPE WILL BE PROVIDED TO ALL UG PIPES.
LT-04
4. ALL STORM WATER MANHOLES & INLETS COVERS WILL
LT-04
BE SUBJECT TO VEHICULAR TRAFFIC TO BE HEAVY DUTY,
P Soak Away Tank ACCESS COVER IN WALKWAYS TO BE MEDIUM DUTY
4mx4m
5.50
LT-01 LT-01 LT-01 LT-01 LT-01
E 12.0m. Ht. Steel flag pole with LT-04-0.250 F.F.L
ENTRANCE / EXIT
powder coated finish, color as
10-TL
LT-01
8.00 per Engineer's approval -0.250
LT-04 F.F.L 14.700 NADD
IL-1.23 SHOP DRAWING APPROVAL STATUS
IL-1.33 14.700 NADD 49
LT-02
STI-07
A APPROVED B APPROVED WITH COMMENTS
LT-04
IL-1.22
C REVISE & RESUBMIT D NOT APPROVED
VIP
50
ROAD LEVEL
LT-04 80 M3 GEOCELLULAR STORM WATER
HOLDING / INFILTRATION TANK.
TANK HEIGHT VARIES BASED ON THE SITE
PLAZA AREA Parking
NAME INITIAL: ............................................
MAJLIS
WATER CAPACITY.
Ø200
L=14.9
10-TL
LT-01
SDP R
Provide provision for
8M
120
PROPOSED PARKING
52
UN @
ENTRANCE metal detector
LT-02
UG, S
LT-04 NO DESCRIPTION DATE
ROAD LEVEL PLAN ON INLET
L=19.04M
LO
PE 1:2
119 53
14.518 NADD ONE KERB OPENING PIPES IN LINE
PROPOSED ROAD
00
EXISTING PARKING
IL-1.25
LT-03 LT-03 LT-03 L=27.93M LT-03 LT-03 L=13.86M LT-03 LT-03
118 IL-1.24 LT-04 54
Ø200 SDP RUN @ UG, SLOPE 1:200 IL-1.10 IL-1.09 Ø200 SDP RUN @ UG, SLOPE 1:200 IL-1.02
SMH-03
BD
LT-02
LT-02
EX-LT LT-04
LT-03
DP UG
D TL-XE LT-03
Ø82 S
116 56
IL-1.12
37
STI-06
115 57
IL-1.11
-0.300 F.F.L LT-03 BD
BD
LT-03
PMC:
LT-02
LT-02
LT-04
14.700 NADD
L=23.80M
14.800 NADD -0.200 F.F.L
Das Tower, Office 603, Sultan Bin Zayed Street,
Khalidia, PO Box 37184, Abu Dhabi, UAE
LT-04 LT-04
14.750 NADD LT-04 LT-04
PROPOSED MAJLIS
L=17.03M
MAJLIS ±0.00 F.F.L OUTDOOR SHADED ±0.00 F.F.L MAJLIS -0.150 F.F.L -0.200 F.F.L
14.950 NADD EVENT HALL MAJLIS
14.950 NADD 14.800 NADD 14.750 NADD
ENTRANCE ENTRANCE CONSULTANT:
Ø110 SDP RUN @ UG, SLOPE 1:100
±0.00 F.F.L
LT-04 14.950 NADD
LT-04 LT-04 -0.250 F.F.L
LT-04
113 LT-04
14.700 NADD CONTRACTOR:
39 59
LT-04
PROPOSED PARKING
LT-03 LT-03 IL-1.03
LT-02
LT-02
SMH-02 IL-0.89
EP-01 EP-01 STI-05
C
ROAD LEVEL 112
BD
BD 40 60
49
IL-1.02 P.O Box : 42311,Abu Dhabi,UAE
IL-0.88 Tel : +971 26678812 , Fax : +971 26678814
14.544 NADD SUB CONTRACTOR
P.O.Box: 46625
DP UG
111 41 Tel: 02-4067888
50
61
Fax: 02-5512955
Ø82 S
Abu Dhabi, U.A.E
PART WALL PAR.
SECURITY RM
JANITOR ROOM
E-mail : [email protected],
PANTRY RM
SECTION A-A
PART. WALL PAR.
Web : www.gisco.ae
110 LT-03 LT-03 LT-04 42 SIDE ENTRY INLET
PROPOSED PARKING
OFFICE TEL. GENERAL STORE BD 51
62
PROPOSED ROAD
LT-02
LT-02
PROJECT NAME:
EXISTING PARKING
EXISTING PARKING
L=15.50M
IL=-0.400
LT-04
MAJLIS-01, PROTOTYPE-01
EXISTING ROAD
ELECTRIC
109
PARKING
VEHICLE
43
ONLY
52
63
L=21.57M
TL-XE EX-LT CORRIDOR
BD
Ø110 SDP F/A VESTIBULE VESTIBULE
ELECTRIC
ZONE:
108
PARKING
VEHICLE
44
ONLY
53
64
KITCHEN STORE WASTE HOLDING
P
FEMALE TOILET MALE TOILET
LT-03 LT-03 PAVEMENT
ELECTRIC
107
PARKING
VEHICLE
45
ONLY
SECTOR NO.: PLOT NO.:
54
65
P
LT-02
Ø110 SDP
LT-02
IL=-0.480
T/B 1 T/B 2
KITCHEN
DINING / MEETING
LT-04 ROOM LIBRARY LT-04
ELECTRIC
106
PARKING
VEHICLE
SMH-01 46
ONLY
55
66
P
ELECTRICAL RM
PROJECT DESCRIPTION:
G LS-03
PUMP ROOM PU
STAFF RESD. 1 STAFF RESD. 2 0S
D
THE PROPOSED PROJECT IS THE
PANTRY
1
Ø1 TYPICAL DETAIL
ELECTRIC
105
PARKING
VEHICLE
47
ONLY
IL-0.92
56
67 CONSTRUCTION OF A NEW MAJLIS
P
ON SIDE ENTRY INLET MANHOLE
B
LT-03 ±0.00 F.F.L LT-03
STI-04
EP-01 EP-01 INCLUDING SUPPORTING SERVICES.
14.950 NADD Ø110 SDP F/A
IL-0.91
ELECTRIC
104
PARKING
VEHICLE
IL=-0.400 48
ONLY
57
68
P
DRAWING TITLE:
GAS CYLINDERS
SERVICE AREA
LT-02
LT-02
P -0.250 F.F.L -0.350 F.F.L -0.250 F.F.L
SITE PLAN
103 Provide
LT-04 provision for 14.700 NADD 14.600 NADD 14.700 NADD
LOT L
IMIT
LOT L IMIT
LT-04 DRAWING NO.: REVISION NO.:
84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 ASM-PLU-SPD-007
-0.350 F.F.L 00
SERVICE LT-04
14.600 NADD PROPOSED PARKING 00 SUBMISSION DATE:
LT-04 BAY E
1:2
SCALE:
LT-04 OP 08-04-2025
PROPOSED PARKING UG
,S
L
1:100
@ M
LT-04 LT-04 N .41
RU 35
ROAD LEVEL S DP L= PROJECT ID: DRAWING SIZE:
2
14.489 NADD -0.250 F.F.L -0.150 F.F.L -0.250 F.F.L -0.250 F.F.L Ø2 LT
-0 PCMG1 A0
EXISTING ROAD
-0.350 F.F.L
ENTRY 14.700 NADD 14.800 NADD 14.700 NADD 14.700 NADD
EX
(TYPICAL)
D:\GIRISH\MAJLIS\WORKING FOLDER\PROTO TYPE 1\AL SAMAH\STORM WATER Copyright © 2023 LEO A DALY Company