Ward 3 Pari Nagar Kurunji ST Drain

The document outlines the detailed estimate for the construction of a storm water drain and two culverts in Tambaram City, with a total estimated cost of Rs 1,200,000. It includes various construction activities such as earthwork excavation, concrete work, and reinforcement detailing, along with associated costs and quantities. The estimate also accounts for GST, labor welfare fund, and contingencies.

Uploaded by

j.venkatesan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views8 pages

Ward 3 Pari Nagar Kurunji ST Drain

The document outlines the detailed estimate for the construction of a storm water drain and two culverts in Tambaram City, with a total estimated cost of Rs 1,200,000. It includes various construction activities such as earthwork excavation, concrete work, and reinforcement detailing, along with associated costs and quantities. The estimate also accounts for GST, labor welfare fund, and contingencies.

Uploaded by

j.venkatesan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

TAMBARAM CITY MUNICIPAL CORPORATION

ABSTRACT ESTIMATE
Name of Work:-Construction of Storm Water drain And 2 nos Culvert to pari nagar kuringi Nagar
ward 3 in Anakaputhur zone -1 TCMC
Estimate Amount Rs : 1200000
Sl. No. Qty Description of Work Rate Per Amount
Earth work excavation for foundation in Hard stiff clay, stiff black
cotton, hard red earth, shales murram, gravel,stoney earth and
earth mixed with small size boulders SS.20B and Sand, silt or other
loose soil, wet sand,or silt not under water, light black cotton soil,
1 154.00 sandy loam ordinary soil and to full depth as may be directed 169.65 Cum 26126.00
except in hardrock requiring blasting inclusive of shoring
shuttering and baling out water and cleaning and levelling the site
etc.,complete 10 cum

Supplying and filling in foundation and basement with filling stone


dust in layers of not more than 15cm.thick well rammed watered
and compacted including all the cost and conveyance of materials
2 19.00 to work site including all the labour charges for filling ,levelling 273.60 cum 5198.00
etc., complete complying with standard specification.

Plain Cement Concrete 1:4:8 (one cement four fine aggregates and
eight coarse aggregates) using 40mm size ISS HBG metal including
3 18.00 cost and conveyance of all materials to site and including for the 5382.26 cum 96881.00
mixing, laying and labour charges and all incidential charges such
as water providing etc., complete as per standard specification

Centering for soffits of RCC slabs of plane surface like lintels, beams
,etc.,including strutting 3m high using mild steel sheets of size
90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm
4 X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X
6.5cm (spaced at about 90cm c/c )and supported dy casurina props
of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard
specification and directed - 10 m 2 (P & D)Data 38

a) 433.00 Drain and slab 538.45 sqm 233149.00


Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand
(M- Sand) and four coarse aggregates) using 20mm size ISS HBG
5 65.00 metal including cost and conveyance of all materials to site and 6755.50 cum 439074.00
including for the mixing, laying and labour charges etc., complete
as per standard specification
Suppling and fabricating and placing in position MS (or) R.T.S. bar
6 1028.00 for reinforcement to all RCC works as per the design given including 93.22 Kg 95830.00
cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-25
Grade in accordance with IS 456 - 2000 using 20mm and down
7 9.00 graded hard broken granite stone jelly for all RCC items of works 8550.56 Cum 76955.00
with minimum cement contenet of 350Kg/ cum and maximum
water cemen
Manufacturing, supplying and fixing Precast Reinforced Cement
Concrete slabs of following thickness in RCC M20 concrete using
following HBGS jelly including cost of reinforcement steel in position
8 5.00 1374.00 sqm 6870.00
but including cost of moulding charges, casting of slab, finishing,
curing and fixing in position in all floors etc., complete complying
with standard specification and as directed.(100mm thick)
Plastering with cement mortar (1:5) 12mm ,thick in all floors
including cost and conveyance of all materilas to site from an
9 68.00 approved quary and labour charges etc,complete as per standard 289.78 sqm 19705.00
specifications (S.I.306)
sub Total 999788.00
10 GST 18% 179962.00
11 LWF 1% 12000.00
12 Contingencies and p.s. charges etc., 8250.00
Total ###

Junior Engineer
Tambaram City Municipal Corporation
Assistant Executive Engineer
Tambaram City Municipal Corporation
0.00

-50000.00
TAMBARAM CITY MUNICIPAL CORPORATION
DETAILED ESTIMATE

Name of Work:-Construction of Storm Water drain And 2 nos Culvert to pari nagar
kuringi Nagar ward 3 in Anakaputhur zone -1 TCMC
Estimate amount Rs 9.10lakhs
S.No Measurement
Description of Work Nos Quantity
. L (m) B (m) D (m)
Earth work excavation for foundation in Hard
stiff clay, stiff black cotton, hard red earth,
shales murram, gravel,stoney earth and earth
mixed with small size boulders SS.20B and
Sand, silt or other loose soil, wet sand,or silt
2 not under water, light black cotton soil, sandy
loam ordinary soil and to full depth as may be
directed except in hardrock requiring blasting
inclusive of shoring shuttering and baling out
water and cleaning and levelling the site
etc.,complete 10 cum
pari nagar kuringi street 1 x 1 150.00 1.10 0.80 132.00
culvert 1 x 2 6.50 1.80 0.90 21.06
Sundries 0.94
Total 154.00 Cum
Supplying and filling in foundation and
basement with filling stone dust in layers of
not more than 15cm.thick well rammed
3 watered and compacted including all the cost
and conveyance of materials to work site
including all the labour charges for
filling ,levelling etc., complete complying with
standard specification.
pari nagar kuringi street 1 x 1 150.00 1.10 0.10 16.50
culvert 1 x 2 6.50 1.80 0.10 2.34
Sundries 0.16
Total 19.00 Cum
Plain Cement Concrete 1:4:8 (one cement four
fine aggregates and eight coarse aggregates)
using 40mm size ISS HBG metal including cost
4 and conveyance of all materials to site and
including for the mixing, laying and labour
charges and all incidential charges such as
water providing etc., complete as per standard
specification
pari nagar kuringi street 1 x 1 150.00 1.10 0.10 16.50
culvert 1 x 2 6.50 1.10 0.10 1.43
Sundries 0.07
Total 18.00 Cum
Centering for soffits of RCC slabs of plane
surface like lintels, beams ,etc.,including
strutting 3m high using mild steel sheets of
size 90cm X 60cm X and B.G 10 stiffened with
5 M.S angles of size 25mm X 25mm X 3mm laid
over silver Oak (C.W) joists of size 10cm X
6.5cm (spaced at about 90cm c/c )and
supported dy casurina props of 10cm to 13cm
dia (spaced of 75cm C/C) complying with
standard specification and directed - 10 m 2 (P
Drain Side wall
pari nagar kuringi street 1 x 3 150.00 0.80 360.00
culvert 2 x 3 6.50 0.70 27.30
Culvert bottom slab 1 x 2 6.50 0.60 7.80
allround slab side 1 x 2 16.00 0.30 9.60
40m Drain cover slab 1 x 1 40.00 0.60 24.00
cover slab side 1 x 2 40.00 0.10 4.00
sundries 0.30
Total 433.00 sqm
Plain Cement Concrete 1:2:4 (one cement, two
Crushed Stone Sand (M- Sand) and four coarse
aggregates) using 20mm size ISS HBG metal
6 including cost and conveyance of all materials
to site and including for the mixing, laying and
labour charges etc., complete as per standard
specification
pari nagar kuringi street 1 x 2 150.00 0.25 0.80 60.00
culvert 1 x 2 6.50 0.45 0.70 4.10
sundries 0.90
Total 65.00 cum
Suppling and fabricating and placing in position
MS (or) R.T.S. bar for reinforcement to all RCC
7
works as per the design given including cost of
steel and binding wire also in all floors.
Main rod 16mm dia bar 2 x 88 1.90 1.58 528.35
distibution rod 12mm dia bar 2 x 18 6.50 0.89 208.26
main rod 12mm dia bar 1 x 250 0.90 0.89 200.25
distibution rod 8mm dia bar 1 x 8 40.00 0.39 124.80
D/F Manhole Cover 12mm dia 8 x -3 1.20 0.89 Kg/m -25.63
D/F 8mm dia distributor 8 x -6 0.45 0.39 Kg/m -8.42
sundries 0.39
Total 1028.00 Kg
Providing and laying in position Standardised
Concrete Mix M-25 Grade in accordance with IS
456 - 2000 using 20mm and down graded hard
8
broken granite stone jelly for all RCC items of
works with minimum cement contenet of
350Kg/ cum and maximum water cemen
culvert 1 x 2 6.50 1.50 0.30 5.85
40m Drain cover slab 1 x 1 40.00 0.90 0.10 3.60
D/F slab -1 x 8 1 0.9 0.1 -0.72
sundries 0.27
Total 9.00 cum
Manufacturing, supplying and fixing Precast
Reinforced Cement Concrete slabs of following
thickness in RCC M20 concrete using following
HBGS jelly including cost of reinforcement steel
9 in position but including cost of moulding
charges, casting of slab, finishing, curing and
fixing in position in all floors etc., complete
complying with standard specification and as
directed.(100mm thick)

1 X 8 1.2 0.45 4.32


Sundries 0.68
Total 5.00 sqm
Plastering with cement mortar (1:5)
12mm ,thick in all floors including cost and
10 conveyance of all materilas to site from an
approved quary and labour charges
etc,complete as per standard specifications
(S.I.306) 1 x 1 150.00 0.45 67.50
pari nagar kuringi street
sundries 0.50
Total 68.00 sqm
11 GST 18% Ls
12 LWF 1% Ls
13 Contingencies and p.s. charges etc., Ls
Junior Engineer
Tambaram City Municipal Corporation Assistant Executive Engineer
zone -1 Tambaram City Municipal Corporation
zone -1
1.15

Cum

Cum

Cum
43.33333
88

176

10

cum