1600 Ton Goliath Crane Cables Vlf2 05-10-2024 Sepco

The document is a VLF test report for 13.8kV power cables conducted for the Marytime Yard Project by SEPCO for Saudi Aramco. The test results indicate satisfactory insulation resistance and VLF test outcomes for all phases, confirming the cables' integrity. Recommendations include providing core identification marks and grounding the cable sheath at the substation end.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views3 pages

1600 Ton Goliath Crane Cables Vlf2 05-10-2024 Sepco

The document is a VLF test report for 13.8kV power cables conducted for the Marytime Yard Project by SEPCO for Saudi Aramco. The test results indicate satisfactory insulation resistance and VLF test outcomes for all phases, confirming the cables' integrity. Recommendations include providing core identification marks and grounding the cable sheath at the substation end.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT MARYTIME YARD PROJECT(MYP) PROJECT NO PAKAGE 4,5&6

CLIENT SAUDI ARAMCO DATE 05-10-2024


CONTRACTOR SEPCO LOCATION 1600 T GOLIATH CRANE

VLF (VERY LOW FREQUENCY) TEST REPORT FOR 13.8kV POWER CABLES
TEST REF LOCATION: AUX TRANSFORMER(ATR) TO MV SWITCH GEAR OUTGOING-2

1. CABLE DETAILS:

MANUFACTURER BAHRA CABLES TYPE CU/XLPE/SWA/PVC

VOLTAGE 8.7/15KV CABLE SIZE 3X1CX 70 SQ.MM

LENGTH (MTR’S) 15 Mtr NUMBER OF JOINTS 0

CABLE TAG HV GR - 7, HV GR – 8, HV GR - 9

2. TESTING EQUIPMENT DETAILS:

EQUIPMENT NAME MAKE & MODEL SERIAL NUMBER CALIBRATION VALIDITY

INSULATION RESISTANCE KIT FLUKE 1550C 2302003 14-APR-2025

HIPOT KIT (VLF) B2 HVA68-2 20B028 13-APR-2025

DIGITAL MULTIMETER FLUKE 175 40850184 13-APR-2025

3. POWER CABLE TEST:


3.1 CORE IDENTIFICATION:

R-PHASE: CONFIRMED OK (“R” IDENTIFICATION MARKED ON THE CABLE BOTH ENDS)


S-PHASE: CONFIRMED OK (“S” IDENTIFICATION MARKED ON THE CABLE BOTH ENDS)
T-PHASE: CONFIRMED OK (“T” IDENTIFICATION MARKED ON THE CABLE BOTH ENDS)

AFAC SEPCO QC SA-POD SA-PMT SA-PID


Name ABDUL SALEEL

Signature
Date 05/10/2024
Page 1 of 3
PROJECT MARYTIME YARD PROJECT(MYP) PROJECT NO PAKAGE 4,5&6
CLIENT SAUDI ARAMCO DATE 05-10-2024
CONTRACTOR SEPCO LOCATION 1600 T GOLIATH CRANE

3.1 INSULATION RESISTANCE TEST


INSULATION RESISTANCE
MEASURED REF.
BEFORE VLF TEST AFTER VLF TEST INJ. TIME DC VOLTAGE
R- PHASE TO Y+B+E 1.54 TΩ 879 GΩ 1 MIN. 5000 V
Y- PHASE TO R+B+E 354 GΩ 1.05 TΩ 1 MIN. 5000 V
B- PHASE TO R+Y+E 512 GΩ 970 GΩ 1 MIN. 5000 V
R-PHASE TO Y-PHASE 614 GΩ 936 GΩ 1 MIN. 5000 V
Y-PHASE TO B-PHASE 479 GΩ 910 GΩ 1 MIN. 5000 V
B-PHASE TO R-PHASE 917 GΩ 891 GΩ 1 MIN. 5000 V

3.2 VLF (VERY LOW FREQUENCY) TEST:

R-PHASE TO S-PHASE + T-PHASE + EARTH:

DESIRED VOLTAGE 24 kV FREQUENCY 0.10 Hz STATUS PASSED/ FAILED/ NA

MEASURED VOLTAGE 24 kV RESISTANCE >20 GΩ


Passed & Satisfactory
MEASURED CURRENT 4 mA TEST TIME 60 min

S-PHASE TO R-PHASE + T-PHASE + EARTH:

DESIRED VOLTAGE 24 kV FREQUENCY 0.10 Hz STATUS PASSED/ FAILED/ NA

MEASURED VOLTAGE 24 kV RESISTANCE >20 GΩ


Passed & Satisfactory
MEASURED CURRENT 5 mA TEST TIME 60 min

AFAC SEPCO QC SA-POD SA-PMT SA-PID


Name ABDUL SALEEL

Signature
Date 05/10/2024
Page 2 of 3
PROJECT MARYTIME YARD PROJECT(MYP) PROJECT NO PAKAGE 4,5&6
CLIENT SAUDI ARAMCO DATE 05-10-2024
CONTRACTOR SEPCO LOCATION 1600 T GOLIATH CRANE

T-PHASE TO R-PHASE + S-PHASE + EARTH:

DESIRED VOLTAGE 24 kV FREQUENCY 0.10 Hz STATUS PASSED/ FAILED/ NA

MEASURED VOLTAGE 24 kV RESISTANCE >20 GΩ


Passed & Satisfactory
MEASURED CURRENT 5 mA TEST TIME 60 min

4. REMARKS / OBSERVATIONS:
➢ PERFORMED VLF TEST IN 13.8kV CABLES AND TEST RESULTS FOUND SATISFACTORY.
➢ CORE IDENTIFICATION MARK SHALL BE PROVIDED IN CABLE CORES (SUBSTATION END).
➢ CABLE SHEATH SHALL BE GROUNDED IN SUBSTATION END.

COMMENTS:

__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________
__________________________________________________________________________________________________________________________________

AFAC SEPCO QC SA-POD SA-PMT SA-PID


Name ABDUL SALEEL

Signature
Date 05/10/2024
Page 3 of 3