Narsindi Shibpur 2005 New Page38

The document outlines various construction works including sand filling, brick flat soling, and reinforced cement concrete (RCC) work, detailing specifications and requirements for each task. It includes unit measurements, quantities, and associated costs for different components of the construction project. The information is organized by item code and includes instructions for execution as per engineering standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views1 page

Narsindi Shibpur 2005 New Page38

The document outlines various construction works including sand filling, brick flat soling, and reinforced cement concrete (RCC) work, detailing specifications and requirements for each task. It includes unit measurements, quantities, and associated costs for different components of the construction project. The information is organized by item code and includes instructions for execution as per engineering standards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SL Item Code Description of Work Unit Location / Length Width Height / Area / No of Total Qty Unit Amount

No Component Depth Volume Item of Works Rate


1 2 3 4 5 6 7 8 9 10 11 12 13

91. 4.06.01.01 Sand filling on the prepared foundation bed with sand of cum Sand filling 0.000 1.00 0.000
specified FM in layers not more than 150mm thick including
necessary carriage, leveling, watering and ramming to B/S_1 nos 100.000 1.000 0.150 15.000 2.00 30.000
achieve minimum dry density (MDD) of 95% STD
compaction with optimum moisture content (OMC) by Open Drain for Pit 8.000 1.000 0.150 1.200 12.00 14.400
ramming each layer up to finished level as per direction of E-
I-C. Pit 1.000 1.000 0.150 0.150 12.00 1.800
Sand of Minimum FM 0.8
46.200 1071.19 49488.98

92. 4.06.02 Single layer brick flat soling with 1st class or picked kiln sqm Brick flat soling 0.000 1.00 0.000
burnt bricks in foundation, filling the interstices tightly with
sand of minimum FM 0.50, watering, leveling, dressing, etc. B/S_1 nos 100.000 1.000 100.000 2.00 200.000
all complete as per instruction of the E-I-C.
Open Drain for Pit 8.000 1.000 8.000 12.00 96.000

Pit 1.000 1.000 1.000 12.00 12.000

308.000 591.40 182151.20

93. 4.09.04.01 RCC-25SCBP: Reinforced cement concrete work with cum RCC_Bottom Slab 0.000 1.00 0.000
minimum cement content relates to mix ratio 1:1.5:3 and
maximum water cement ratio 0.4 having minimum required B/S_1 nos 100.000 1.000 0.125 12.500 2.00 25.000
average strength, f'cr = 33.5 MPa and satisfying a
compressive strength f'c = 25 MPa at 28 days on standard Open Drain for Pit 8.000 1.000 0.125 1.000 12.00 12.000
cylinders as per standard practice of Code AASHTO/ ASTM
and cement conforming to BDS EN 197-1 : 2003 CEM II/A- Pit 1.000 1.000 0.125 0.125 12.00 1.500
L/M/V/W 42.5N, high range water reducing admixture of
complying type A or F under ASTM C 494 (Doses of 38.500 17556.20 675913.70
admixture to be fixed by the mix design), sand of minimum
FM 2.5 and 20mm down well graded crushed stone chips
broken from boulders (Preferably stone chips from
Madhyapara, Dinajpur, LAA value not exceeding 30)
conforming to ASTM C33 including breaking chips,
screening through proper sieves, cleaning, placing shutter in
position, making shutter water-tight properly, placing
reinforcement in position, mixing in mechanized batch mix
plant and pumping using line pump or boom placer,
maintaining allowable slump of 75mm to 100mm, casting in
forms, compacting by mechanical vibrator machine, curing
for 28 days, removing centering-shuttering after approved
specified time period, other incidental charges, etc. all
complete as per drawing, specification & direction of the E-I-
C. The cost of reinforcement and it's fabrication, welding,
coupling, placing, binding etc. is not included but the cost of
admixture is included in this unit rate. Additional quantity of
cement to be added if required to attain the strength at the
contractor's own cost.
[Using Batching Plant, Transit Mixer, Concrete Pump and
bulk rate of Cement]
For pile caps, abutment base, facing elements of
Reinforced/ Mechanically Stabilized Earth Structure, bottom
slab of Box Culvert etc.

Package Code : Shibpur-2005; February 2023 Print Date/Time: 06-Feb-2025 04:35 PM Page 38