Drainage System RF a.B
Drainage System RF a.B
SS SOIL STACK
WS WASTE STACK
VS VENT STACK
N
RS RAIN STACK
SP SOIL PIPE
WP WASTE PIPE
RP RAIN PIPE
VP VENT PIPE
SRD SIDE ROOF DRAIN
WP WASTE PIPE
BFS BELOW FLOOR SLAB
W/RVC WITH ROOF VENT CAP
CP CONDENSATE DRAIN PIPE
PARCEL - C -
RD ROOF DRAIN
CO CLEAN OUT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
@CLG AT CEILING
UG UNDER GROUND
FMP FORCE MAIN PIPE
UG UNDERGROUND
UT UNDER TILE
S% PIPE SLOPE
T/A TO ABOVE
F/A FROM ABOVE
METAL SHADE METAL SHADE F/B FROM BELOW
METAL SHADE METAL SHADE
T/B TO BELOW
GT GULLY TRAP
CB CATCH BASIN
TD TRENCH DRAIN
GD GARAGE DRAIN
SDC SLOW DOWN SHAMBER
S= S=
1% 1%
=1
% 1%
S S=
4.58
RD-3 3.76
RD-3
1.12
1% S= RS Ø110 T/B
S= 1% S=
3.87
VS Ø75 T/A RS Ø110 T/B VS Ø75 T/A W/RVC 1% VS Ø75 T/A VS Ø75 T/A
VS Ø75 T/A
W/RVC S=1 W/RVC W/RVC W/RVC S=1 1% W/RVC W/RVC
RP Ø110 BFS % % S=
SRD SRD
0.35
0.35
4.15
1.08
1.05
1.05
2.63 2.63
4.29
8.19
4.15
7.95
VS Ø75 T/A RP Ø110 BFS
VS Ø75 T/A
WS Ø110 T/B
WS Ø110 T/B RS Ø110 T/B
RS Ø110 T/B SS Ø110 T/B
RP Ø110 BFS SS Ø110 T/B17.34 RP Ø110 BFS RP Ø110 BFS 17.05 W/RVC
W/RVC
CO CO
1.16
1.16
VS Ø75 T/A VS Ø75 T/A
W/RVC 5.77
W/RVC
S= % S=
1% =1 1 1%
S % S=
0.99
0.99
Electrical Duct FUTURE EXPANSION FUTURE EXPANSION Electrical Duct 2.88
3.66
3.66
RP Ø110 BFS ELEVATED TANK RP Ø110
3.34BFS
0.190.29
0.190.29
STAIRS STAIRS
0.29 0.12
0.29 0.12
0.39
0.39
2.67
1%
1%
RP Ø110 BFS
S=
2.92
2.36
3.47
1%
3.09
RD-3
S=
0.28
1% 1 1% S=
S= % S= 1%
1.38
4.03
4.32
0.79 0.78 RD-3
VS Ø75 T/A
1%
S=
1%
METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE
METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE
Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct
ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK
METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE
PARCEL (A) PARCEL (B) PARCEL (C) PARCEL (D) PARCEL (E) PARCEL (F) PARCEL (G) PARCEL (H)
1
2
3
4
PROJECT
ADMINISTRATION BUILDINGS
PARCEL - C -
HAMA AL-TATWEER
Real Estate Co.
CONSULTANT
CLIENT
CONTRACTOR
SHEET TITLE