AS BUILD DRAWING
indramas
BINTAN
TREASURE BAY
LAGOON DRAINS
PLAN
AS BUILD DRAWING
NE
S
S
indramas
BINTAN TREASURE BAY
RECIRCULATION SYSTEM
AS BUILD DRAWING
NE
S
S
indramas
BINTAN TREASURE BAY
SKIMMER SYSTEM
N
AS BUILD DRAWING
NE
S
S
indramas
BINTAN TREASURE BAY
BOTTOM CLEANING
SYSTEM
AS BUILD DRAWING
NE
S
S
indramas
BINTAN TREASURE BAY
DOSING SYSTEM
AS BUILD DRAWING
N
NE
S
S
indramas
BINTAN TREASURE BAY
STROM WATER
SYSTEM
AS BUILD DRAWING
NE
S
S
indramas
BINTAN TREASURE BAY
CUTTING LIST
GEOMEMBRANE
AS BUILD DRAWING
TABULATION OF COORDINATE FOR
WATER INTAKE
NO N E Z
01 176625.909 496276.015 1.899
02 176623.665 496273.551 0.448
03 176641.551 496258.844 0.466
04 176659.437 496244.138 0.490
05 176668.503 496237.891 0.450
06 176678.810 496250.087 1.410
07 176686.237 496244.022 1.558
08 176683.693 496240.825 1.629
09 176703.113 496263.184 1.638
09
HDPE PIPE Ø 250 mm
07
08
06 HDPE PIPE Ø 160 mm
CONCENTRIC REDUCER Ø 250 X 160 mm
05
indramas
04
BINTAN TREASURE BAY
EQUAL TEE 90° 160 mm
03
WATER INTAKE
GENERAL PLAN
01
02
AS BUILD DRAWING
GEI SEBUNG
N 176807.864
E 496382.412
existing drainn
0.600m WIDE DRAINAGE
OMIT WORK
102
103 A
PT BINTAN HOTEL
101 UTAMA
0.900m WIDE DRAINAGE
TRAC
0.600m WIDE DRAINAGE
K
CRYSTAL LAGOON
1.500m WIDE DRAINAGE 1.500m WIDE DRAINAGE
1.500m WIDE DRAINAGE
VIEWING
TOWER
1.500m WIDE DRAINAGE
Rock
Landscape EXISTING
EARTH DRAIN
REDUCER Ø 250 mm X 200 mm
REDUCER Ø 200
mm X 160 mm
ELBOW 45° 200 mm
EXISTING
EARTH DRAIN
indramas
BINTAN TREASURE BAY
WATER SUPPLY
GENERAL PLAN