E-70611
E-70611
ABSTRACT
He is informed that posting him as Incharge Executive Engineer does not confer
any right or any claim for the post of Executive Engineer or to any claim for seniority or
promotion in future. These arrangements are subject to outcome of the court cases
pending, if any in the Hon’ble Supreme Court / High Court / A.P. Administrative Tribunal.
S.P. TUCKER
PRINCIPAL SECRETARY TO GOVERNMENT
To
The individual through the Engineer-in-Chief (AW), I&CAD Department, Hyderabad.
The Engineer-in-Chief (AW), I&CAD Department, Hyderabad.
Copy to
The P.S. to Special Secretary to C.M. / O.S.D. to M(M&MI) / PS to M (Minor Irrgn).
The PS to Prl. Secy. (Irrgn) / Prl. Secy. (J) / Secy. (AD) / Secy (RRM).
SF / SC.
//FORWARDED::BY ORDER//
SECTION OFFICER.